Loading...
P&Z 6/17/04 approval letterT H E C I T Y 0 F June 18,2004 Ms. Beth Cunningham 2860 Market Loop Southlake, TX 76092 RE: Four Seasons Addition~ Lot 2R (BCE Specialties, Inc.), Replat Dear Ms. Cunningham: This letter is to inform you that the Four Seasons Addition, Lot 2R, (BCE Specialties, lnc. L Replat, being a replat of Lot 2 of the Four Seasons Addition, to allow the construction of an approximate 56,750-square-foot office/warehouse on 4.1 acres of property located along at the southeast corner of Sandy Lake Road and Royal Lane. was recommended for approval by the Coppell Planning and Zoning Commission on Thursday, June 17, 2004, subject to the following condition: l) Compliance with the attached Engineering comments. l'he date scheduled for consideration by the Coppell Cib' Council is Tuesday, July 6, 2004, at 7 p.m. A representative for this case must be present at this meeting, which will be held in Council Chambers at City,' Hall. Failure to represent this item may result in the denial of this application. lfyou have any' questions, please contact the Planning Department at (972) 304-3678. Sincerely, Marcie Diamond Assistant Director of Planning Cc Kyle McCullah, }lardy McCullah/MLM Architects, Inc. C. Jack Evans, Pacheco Koch Consulting Engineers Building Inspection file 1TEll: Four Seasons Addition~ Lot 2R~ (BCE Specialties, Inc.). Replah being a replat of Lot 2 of thc Four Seasons Addition, to allo',,, the construction of an approximate 56,750 square-fbot orifice/warehouse oo 41 acres of property located along at the southeast comer of Saodv i.akc Road and R%'aI Lane, a[ the ~cquest of (7. Jack Evans, Pacheco Koch Consulling Engineers S'FAFFREP.: Matt Steer PROJECTID. RP~04_()020 DRC DA TE: April 29, 2004 and MO, 6,2004 CO;VTA CT: Kenneth M. Gr(ffin, p.E., Dir. of Engi. eering/Public ll'orhs 972/304-3686 COM31E YI' S TA TUS: P~~Y ~ ' ~ ~r c ~ Plat - No comrnent5 P,"eliminary Grading Plan - Regarding tiao note that says "Contractor to obtain perrnission m writing fi'om property o~ncr prior to commencing offsite grading work" fine City ~i]l need that x~ntten before tine pcnmt ~s ~ssucd. There ~s an cx~stmg inlet at a Iow point m RoFal I.anc where 5ou are showing to const~ct Fern d~i~cx~a5 Duc to the I~ct tha~ ~t is a low petal tho drixex~a5 sl~ould be ~elocated to axoid thc F'reliminar5 Drainage Plan - Relocate dtix ev,'ay erst ofttqc x,,ax of the 1o~ point m[et m Royal Lane ~ ilo tinning of this project needs to bc taken into consideration with the timing for the Sand Lake Road x~ldenmg project V,'c expect that the road ~ll be under const~ct~on hoamnlng nq Oclober of th~s ':ea~ lC thc drainage that ~s to be constructed w/th that project is not ~n plaice, )ou ~11 need temperaU, hcad~xa]l st~cturcs on Xour oulfalls, and some type of tom oraU, bridge struclurc Ibr )'ot:~ drixcx~a)s Altcmatixc!). )et can construct thc dnx c~ a5 s at a later date. but at anx rate. coordination ~s a n/usl for these pro3octs