P&Z 6/17/04 approval letterT H E C I T Y 0 F
June 18,2004
Ms. Beth Cunningham
2860 Market Loop
Southlake, TX 76092
RE: Four Seasons Addition~ Lot 2R (BCE Specialties, Inc.), Replat
Dear Ms. Cunningham:
This letter is to inform you that the Four Seasons Addition, Lot 2R, (BCE Specialties, lnc. L Replat,
being a replat of Lot 2 of the Four Seasons Addition, to allow the construction of an approximate
56,750-square-foot office/warehouse on 4.1 acres of property located along at the southeast corner
of Sandy Lake Road and Royal Lane. was recommended for approval by the Coppell Planning and
Zoning Commission on Thursday, June 17, 2004, subject to the following condition:
l) Compliance with the attached Engineering comments.
l'he date scheduled for consideration by the Coppell Cib' Council is Tuesday, July 6, 2004, at 7
p.m. A representative for this case must be present at this meeting, which will be held in Council
Chambers at City,' Hall. Failure to represent this item may result in the denial of this application.
lfyou have any' questions, please contact the Planning Department at (972) 304-3678.
Sincerely,
Marcie Diamond
Assistant Director of Planning
Cc Kyle McCullah, }lardy McCullah/MLM Architects, Inc.
C. Jack Evans, Pacheco Koch Consulting Engineers
Building Inspection
file
1TEll:
Four Seasons Addition~ Lot 2R~ (BCE Specialties, Inc.). Replah being
a replat of Lot 2 of thc Four Seasons Addition, to allo',,, the construction of
an approximate 56,750 square-fbot orifice/warehouse oo 41 acres of
property located along at the southeast comer of Saodv i.akc Road and
R%'aI Lane, a[ the ~cquest of (7. Jack Evans, Pacheco Koch Consulling
Engineers
S'FAFFREP.: Matt Steer PROJECTID. RP~04_()020
DRC DA TE: April 29, 2004 and MO, 6,2004
CO;VTA CT: Kenneth M. Gr(ffin, p.E., Dir. of Engi. eering/Public ll'orhs 972/304-3686
COM31E YI' S TA TUS: P~~Y ~ ' ~ ~r c ~
Plat -
No comrnent5
P,"eliminary Grading Plan -
Regarding tiao note that says "Contractor to obtain perrnission m writing fi'om property o~ncr
prior to commencing offsite grading work" fine City ~i]l need that x~ntten
before tine pcnmt ~s ~ssucd.
There ~s an cx~stmg inlet at a Iow point m RoFal I.anc where 5ou are showing to const~ct
Fern d~i~cx~a5 Duc to the I~ct tha~ ~t is a low petal tho drixex~a5 sl~ould be ~elocated to
axoid thc
F'reliminar5 Drainage Plan -
Relocate dtix ev,'ay erst ofttqc x,,ax of the 1o~ point m[et m Royal Lane
~ ilo tinning of this project needs to bc taken into consideration with the timing for the Sand
Lake Road x~ldenmg project V,'c expect that the road ~ll be under const~ct~on hoamnlng
nq Oclober of th~s ':ea~ lC thc drainage that ~s to be constructed w/th that project is not ~n
plaice, )ou ~11 need temperaU, hcad~xa]l st~cturcs on Xour oulfalls, and some type of
tom oraU, bridge struclurc Ibr )'ot:~ drixcx~a)s Altcmatixc!). )et can construct thc
dnx c~ a5 s at a later date. but at anx rate. coordination ~s a n/usl for these pro3octs