Loading...
Staff memo re requirements T H E C I T Y O F COPPEL£ Date: June 21, 2004 To: From: Gary Sieb Matt Steer, City Planner RE: Vadance allowing a carport closer than the 3' minimum requirement for Jerry Slaughter Lee Beck submitted a revised site plan to the Building Inspection Department for a building permit on behalf of Jerry Slaughter. Jemj Slaughter called and asked where this was in the process, not knowing that he had submitted it there. I told her that we would retdeve the plans from Building Inspection and see if they met our submission requirements. The application and check was not submitted. The plans were incomplete. They did not show the following: · Turning radii · Carport ceiling plans, showing materials and finishes. · Roofing matedal · Materials and color specifications including eave and gable trim, gutters and downspouts. · Adjacent fence, landscaping and other obstructions to visibility · Total height dimension I spoke with Lee Beck on 3/17/04 and he was upset at the fact that he had to go through the non-administrative vadance process (PZC and CC), and that these items were requested to be in the plans. I called Ms. Slaughter and let her know the situation. I told her that I'd fax her the list of items needed on Monday 3/22/04. She said that if Mr. Beck didn't want to take on the challenge, then she'd hire Tough Shed.