CC approval on 7/6/04COFFELL AGENDA REQUEST FORM DEPT: Planning DATE: Jul3: 6, 2004 ITEM #: 8 ITEM CAPTION: Consider approval of the Four Seasons Addition, Lot 2R, (BCE Specialties, Inc.), Site Plan, to allow the construction of an approximate 57,302-square-foot oflqce/warehouse on 4.1 acres of' property located at the southeast comer of Sandy Lake Road and Royal Lane. APPROVED BY CITY COUNCIL ON ABOVE DATE GOAL(S): ~ EXECUTIVE SUMMARY: Date of P&Z Meeting: June 17, 2004 Motion to approve subject to conditions 1 & 3 below and contingent upon a revised landscape plan and tree preservation retribution plan to be brought forth and submitted in six months and prior to the issuance of the Certificate of Occupancy. M - York S - Raines Vote - 6-0 · =~,, Tunnell absent ' ~ Decision of P&Z Commission: Approved (6-0) with Commissioners McCaffrey, Milosevich, Kittrell, Halsey, Borchgardt and Reese voting in favor. None opposed. Approval is recommended, subject to the following conditions: 1) A Tree Removal Permit will be required prior to removal of any protected trees on the site. 2) Tree Mitigation Tabulations on Existing Tree Plan are correct. A contribution to the City of Coppell Reforestation and Natural Areas Fund in the amount of $18,650 will be required. 3) Compliance with the Engineering plat comments. Staff' recommends approvah Agcnda Request Form - Revised 02'04 Document Name: (~ I Four Seasons SP I-AR CITY OF COPPELL PLANN1NG DEPARTMENT STAFF REPORT CASE: Four Seasons Addition, Lot 2R (BCE Specialties, Inc.), Site Plan P & Z HEARING DATE: C.C. HEARING DATE: June 17, 2004 (Continued from the Commission's May 20, 2004, meeting.) July 6, 2004 STAFF REP.: Matt Steer, City Planner LOCATION: Southeast comer of Sandy Lake Road and Royal Lane. SIZE OF AREA: 4.1 acres of property. CURRENT ZONiNG: LI (Light Industrial) REQUEST: Site Plan approval to allow the construction of an approximate 57,302-square-foot office/warehouse. APPLICANT: Owner Beth Cunningham 2860 Market Loop Southlake, TX 76092 Phone: (817) 949-2030 Fax: (817) 488-9158 Architect Hardy McCulIah/MLM Architects, Inc. Kyle McCullah 12221 Merit Drive, Suite 280 Dallas, TX 75251 Phone: (972) 385-1900 Fax: (972) 385-1937 Engineer Pacheco Koch Consulting Engineers C. Jack Evans 8350 N Central Expressway, Suite 1000 Dallas, TX 75206 Phone: (972) 235-3031 Fax: (972) 235-9544 Item # 4 Page 1 of 5 HISTORY: In 1990, a Final Plat and Site Plan were approved for a 13.7-acre tract of property. The original plans included the construction of a 152,000-square-foot building (existing) and a proposed Phase 2 expansion to include a 138,000-square-foot building on the property adjacent to Sandy Lake Road, which was never constructed. In 1999, City Council approved a replat for the northern 4.1 acres to make this tract a separate lot. This approval was subject to a condition that any modification to the existing building would require a site plan review and a replat. The Planning Commission reviewed a Site Plan package on May 20, 2004, and continued the case to June 17, 2004, in order for the applicant to provide revised north and west elevations. TRANSPORTATION: Both Royal Lane and Sandy Lake Road are projected to be C4D/6, four-lane divided thoroughfares in a six-lane divided right-of-way. SURROUNDING LAND USE & ZONING: North- Vacant: LI (Light Industrial) South - Stone Panels, Inc., LI (Light Industrial) East - AmberPoint Business Park, LI (Light Industrial) West - Vacant: LI (Light Industrial) COMPREHENSIVE PLAN: The Comprehensive Plan of May 1996 shows the property as suitable for Light Industrial/Showroom. DISCUSSION: A 57,302-square-foot office warehouse with seven lease spaces is proposed to be erected on this 4.1-acre site. The primary tenant will be BCE Specialties, Inc., an elevator finish-out company (occupying 22,761- square feet). The remaining six lease spaces will range from 5,000- to 7,515-square feet. The tenants are unknown at this time. There are three 9'x10' sheltered dock high doors (four feet above ground level) located on the southeast comer of the proposed warehouse to support BCE Specialties, Inc. Each of the smaller lease spaces will have one 10'xl0' grade-level overhead door. These are designed for smaller tracks. All loading will be screened with a 10' wall on the east and west Page 2 of 5 Item # 4 and with landscaping (45 Eastern Red Cedars and 18 Cedar Elms) along the south property line. The access point and median opening along Sandy Lake are being coordinated with the developers to the north. The access point along Royal is shown at the south end of the property but will have to be relocated due to drainage concerns regarding the location of a storm water inlet. The parking space requirement is calculated with the inclusion of 27,600-square-feet of office space. The building total usage will be limited to 48% office space with the remainder to be warehousing. The access point along Royal will not need to be relocated provided that the Engineering Department approves a modified drainage plan. The Landscape Plan should be modified to reflect the Streetscape Plan and should reflect certain criteria related to the following: 1. Primary Image Zone, 2. Secondary Intersection, and 3. Industrial land use. Within the primary image zones, "Cedar Elms are the dominant street tree in the median and the edges, accented with Redbud and Wild Plum and accent overstory trees of Sweet Gum or Chinese Pistache." The secondary intersection should have "consistent landscape elements to include a 12" high planting bed for annual and perennial flowers, background plantings of pink and white Crape Myrtles to highlight the bed, and accent overstory trees of Sweet Gum and Chinese Pistache." The edge design should reflect an industrial land use. This calls for Live Oaks to "soften the edge and provide year-round screening." Approval will be contingent upon the Landscape Architect revising the plans. The Landscape Architect has modified the plans to reflect the requirements listed in the Streetscape Ordinance. The elevations show two shades of gray with aqua accent squares. Staff requested the applicant to show additional reveals, articulations and windows along the north elevation due to the size of the building and its frontage along Sandy Lake. The Zoning Ordinance makes this a requirement if a building exceeds 100' in length. The entrance fronting the intersection of Sandy Lake and Royal is recommended to be enhanced as this is one of the major entryways into Coppell. Page 3 of 5 Item # 4 The Architect has changed the following: 1. The soffits were raised from 10' to 12' in height. 2. The columns at each entry were extended 2' from the main structure vertically and horizontally; therefore, the longest expanse without articulation is 69.5'. 3. Canopies were added to each of the entry features, except the east elevation. 4. Can lights were added at each entry to provide shadows, which add interest to the building at night (on original submittal). 5. More accent squares were added (two on each side of the entry). 6. The future entry was added to create a continuous rhythm. RECOMMENDATION TO THE PLANN1NG AND ZONING COMMISSION: The Planning staff recommends APPROVAL of the Site Plan, subject to the following conditions being met: 3) r~_~. .... .~.~ ~-,~ ..... ~....,:.. e...~.. · .~ .... .~ o .... ~.~n canopy was added to both sides of the entrance. 6) A Tree Removal Permit will be required prior to removal of any protected trees on the site. Page 4 of 5 Item # 4 7) Tree Mitigation Tabulations on Existing Tree Plan are correct. A contribution to the City of Coppell Reforestation and Natural Areas Fund in the amount of$18,650 will be required. 8) Compliance with the attached Engineering plat comments. ALTERNATIVES 1) 2) 3) 4) Recommend approval of the request Recommend disapproval of the request Recommend modification of the request Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) 2) 3) 4) 5) Site Plan Elevations Tree Survey Landscape Plan Engineering Plat Comments Page 5 of 5 Item # 4 DEVELOPMENT REVIEW COMMITTEE ...................... J ENGINEERING COMMENTS ITEM: Four Seasons Addition~ Lot 2R~ (BCE Specialties, Inc.)~ Replat~ being a replat of Lot 2 of the Four Seasons Addition, to allow the construction of an approximate 56,750-square-foot office/warehouse on 4.1 acres of property located along at the southeast comer of Sandy Lake Road and Royal Lane, at the request of C. Jack Evans, Pachcco Koch Consulting Engineers. STAFF REP.: Matt Steer PROJECT ID# RP-04-0020 DRC DA TE: April 29, 2004 and May 6,2004 CONTACT: Kenneth M. Gr¢fin, P.E., Dir. of Engineering/Public }Forks 972/304-3686 COMMENTSTATUS: .~'~'~ ...~,.~,.~, ~r~Dv ,..... ~FINAL ~rc~n ~ rT~ P&Z Plat - No comments. Preliminary Grading Plan - 1. Regarding the note that says "Contractor to obtain permission in writing from property owner prior to commencing offsite grading work"...the City will need that written pcm~ission before the permit is issued. 2. There is an existing inlet at a low point in Royal Lane where you are showing to construct your driveway. Due to the fact that it is a low point, the driveway should be relocated to avoid the inlet. Preliminary Drainage Plan - 1. Relocate driveway out of thc way of the low point inlet in Royal Lane. 2. The timing of this project needs to be taken into consideration with the timing for thc Sandy Lake Road widening project. We expect that the road will be under construction beginning in October of this year. If the drainage that is to be constructed with that project is not in place, you will need temporary headwall structures on your outfalls, and some type of temporary bridge structure for your driveways. Alternatively, you can construct thc driveways at a later date, but at any rate, coordination is a must for these projects. .,tdditio~tal comments may be generated duri~*g full engineering review "5 t[':' I~ :ti I[ ! ! j