Loading...
DRC commentsCOl'FELL Project ID SPA-04-0019 Address 100 S Royal Ln CITY OF COPPELL DRC REPORT Project Name COPPELL  .~ Four Seasons Addition, Lot 2R, (BCE Specialties Project Type Application Date Case Mana~ler Project Description Site Plan Approval 4/21/04 Matt Steer To allow the construction of an approximate 56,750-square-foot office/warehouse on 4.1 acres of property Building Inspection Electric and Gas Engineering 1 of 2 Reviewed By Review Date Greg Jones 4/28/04 Jeff Curry 4/30/04 Ken Griffin 4/28/04 Fire Administration Tim Oates 4/30/04 Parks and Recreation John Elias 4/27/04 Comments 1. No comments made. No Comments Received Site Plan - 1. Coordinate the 24' fire lane/mutual access easement and median opening with the property on the north side of Sandy Lake Road. Provide an access easement on your property to allow for future extension of pavement onto the adjacent property to the east. 2. Regarding the proposed open drainage along the property line, we need to see topography with your grading and interior drainage plans in order to evaluate whether that will work. See additional comments related to site issues on the plat case. - Indicate turning radii for fire lane - 30' inside, 54' outside Preliminary Water and Sanitary Sewer Plan - Indicate fire department connection location. Must be detached from building, within 50' of a fire hydrant and on same side of road/fire lane of said fire hydrant. - Relocate fire hydrant at the SW corner of property to the S side of the drive. 1) A tree removal permit wil~ be required prior to removal of any protected trees on this site. 2) Tree survey should include protected trees only. Hackberry & Cottonwood trees are protected if they are 10" DBH, not 6"DBH. 3) Tree mitigation tabulations shown on plan LI.00 are not correct. COFFELL Agency Planning Department Reviewed By Matt Steer CITY OF COPPELL DRC REPORT Review Date 4/29/04 COPPELL Comments Site Plan 1. There are significant inconsistencies between the plat and the site plan. These will need to be rectified to allow for accurate review by City Staff. 2. Check all dimensions and match easements with plat. Some are located in different places and some are not the same width. 3. Show pavement width along Sandy Lake Road and Royal Lane. 4. Show all proposed and existing fire hydrants. 5. Revise the 60' building setback with parking easement shown in the wrong location parallel with the jog in the pmperty line. 6. Explain what the possible phase line means. 7. Depict the fire lane at 24' not 21'. 8. Check location of the proposed drainage pipe. Match with easement shown on plat. 9. Coordinate the lot and block numbers with the plat (Lot 2R, Tract 1). 10. Include the dimensions of the property. 11. Show the minimum finished floor elevations. Elevations 1. Due to frontage onto Sandy Lake, a Primary Image Zone, show additional architectural accents to break up the expanse of the wall. These may include items such as reveals, windows, and wall articulations, among others. 2. Enhance the entrance abutting Sandy Lake and Royal. 3. Show dimensions of proposed monument sign. Tree Survey 1. All trees are shown to be removed. Maybe some of the trees along Royal can be saved. Landscape Plan 1. Review the Streetscape Plan. The intersection of Sandy Lake and Royal is a secondary intersection and requires specific landscaping. There is a typical industrial edge treatment within the Streetscape Plan. Reflect on plan. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Four Seasons Addition, Lot 2R, (BCE Specialties~ Inc.), Site Plan, to allow the construction of an approximate 56,750-square-foot office/warehouse on 4.1 acres of property located at the southeast comer of Sandy Lake Road and Royal Lane, at the request of Kyle McCullah/MLM Architects, Inc. STAFF REP.: Matt Steer PROJECT ID# SPA-04-0019 DRC DATE: April29, 2004 and May 6,2004 CONTA CT: Kenneth M. Gri~n, P.E., Dir. o~Engineering/Public Works 972/304-3686 COMMENTSTATUS: PP. EL!~!AS~RY ~FINAL RE!~SE~ AFTER P&Z See comments related to site issues on the plat case.