DRC commentsDEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Sandy Lake Crossing Addition, Lot 2R~ Block 1, Replat, being a replat
of Lot 2, Block 1 of the Sandy Lake Crossing Addition, to allow the
construction of an approximate 7,200-square-foot retail building on 0.737
of an acre of property located along the south side of Sandy Lake Road,
approximately 200 feet west of Denton Tap Road, at the request of
Thomas J. Whan, Creekside Construction Ltd.
STAFF REP.: Marcie Diamond PROJECT ID# RP-04-002/I
DRC DA TE: April 29, 2004 and May 6,2004
CONTACT: Kenneth M. Green, P.E., Dir. o/ Engineerin~/Public Works 972/304-3686
COMMENTSTATUS: t>~,~ ta~nra t>~7 ~FIIVAI t~w~/t~wtl
Plat -
I. Provide 5' sidewalk/utility easement adjacent to north property line.
Utilities PLan -
1. Provide one tap to the 8" water line with the domestic and irrigation taps off the 8" water
line. The fire line vault needs to be in a 15' x 15' utility easement.
Additional comments may be generated and a need for additional easements may be identified as
a result ora detailed engineering review.
COl'FELL
Project ID RP-04-0024
Address 105 W Sandy Lake Rd
CITY OF COPPELL
DRC REPORT
Project Name
Sandy Lake Crossing Addition, Lot 2R, Block 1
Project Type
Application Date
Case Manager
Project Description
Replat
4/21/04
Marcie Diamond
Being a replat of Lot 2, Block 1 of the Sandy Lake Crossing Addition, to allow the construction of an approximate
7,200-square-foot retail building
Agency
Building Inspection
Electric and Gas
Engineering
Fire Administration
Parks and Recreation
Planning Department
1 of 1
Reviewed By Review Date
Greg Jones 4/28/04
Jeff Curry 4/30/04
Ken Griffin 4/29/04
Tim gates 4/30/04
John Elias 4/27/04
Marcie Diamond 4/27/04
Comments
1. No comments made.
No Comments Received
Plat -
1. Provide 5' sidewalk/utility easement adjacent to north
property line.
Utilities Plan -
1. We need a fire hydrant onsite with location to be
specified by the Fire Marshal.
2. Domestic and irrigation services need to be off the
main waterline, not the fire line, with meters located in
the public right-of-way or a utility easement.
3. A fire vault is needed on the fire line with a double
detector check inside the vault.
4. I recommend an 8" waterline with a 6" branch to a
hydrant onsite and a 6" branch to the building for
sprinkler purposes,
5. An FDC connection should be made within 50' of the
fire hydrant.
6. The driveway connection to Sandy Lake Road needs
to be reconstructed with concrete; it is in substandard
condition.
Additional comments may be generated and a need for
additional easements may be identified as e result of a
detailed engineering review.
No Comment
No comments.
1. Add '"'Being a replat of Lot 2, Block 1" to the title block.
2. Change the city name in the Owner's and Surveyor's
certificates from Chapel to Coppell.
3. Change AT&T Broadband to Comcast
4. Change Oncor Electric and Gas to Oncor Electric
Delivery Company and a separate signature line for TXU
Gas.