Loading...
CC approval on 9/14/04AGENDA REQUEST FORM COPPELL DEPT: Planning DATE: September 14, 2004 ITEM #: 13 ITEM CAPTION: PUBLIC HEARING: Consider approval of Case No. S~1220-TC, Verizon Wireless, zoning change request from TC (Town Center) to S-1220-TC (Special Use Permit-1220-Town Center) to allow for the replacement of a 70-foot light standard with an 80-foot light standard to permit a wireless conununication antenna, with ground-mounted equipment, located at m~J~l~(~T~toad (Andrew Brown Pork West). Motion to close the Pub c Hearing a,,nd approve subject to CITY COUNCIL conditions 1, 2, 3, 4 (revised to say removal of existing light ON ABOVE standard and nsta at on of new light standard must occur within 72 hours providing Park Department approval and this shall not I I I I reduce the light availability for any fields in the Park"), 5, 6 & 8 GOAL(S): M - York Vote - 6-0 S - Brancheau Suhy absent ? EXECUTIVE SUMMARY: Date of P&Z Meeting: Decision of P&Z Commission: August 19, 2004 Approved (5-0) with Commissioners McCaffrey, Milosevich, Halsey, Foreman and Reese voting in favor. None opposed. Approval is recommended, subject to the following conditions: 1) Equipment shelter will match existing brick color and pattern of concession stand, and will not attach to the existing building on the north side. 2) Construction procedures of this application will not interfere with activities scheduled within the park, and procedures and detailed plans will be approved by the Parks Department. 3) No game schedules can be affected by this construction. 4) Removal of existing light standard and installation of new light standard must occur on same day. 5) Any damage to the Park will be repaired by Verizon; repairs will require approval of the Parks Department. 6) A lease agreement approved by the City. (CONDITION MET) 8) Need sealed structural drawings on new base support or engineer's certification of existing base to support new pole. Staff recommends approval. Agenda Request Form - Revised 02/04 Document Name: ~ IS-1220-TC I-AR CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE NO.: S-1220-TC Verizon Wireless P & Z HEARING DATE: C.C. HEARING DATE: August 19, 2004 September 14, 2004 STAFF REP.: Gary L Sieb, Planning Director LOCATION: 363 N. Denton Tap Road (Andrew Brown Park West). SIZE OF AREA: Approximately 172-square feet of property. CURRENT ZONING: TC (Town Center) REQUEST: S-1220-TC (Special Use Permit-1220-Town Center) to allow the replacement of a 70' light standard with an 80' light standard to permit a wireless communication antenna, with ground-mounted equipment. APPLICANT: HISTORY: Dallas MTA, L.P., d/b/a. Verizon Wireless 500 West Dove Road Southlake, TX. 76092 All correspondence to: Mr. Mason M. Griffin Bracewell and Patterson. LLP 500 N. Akard St., Suite 4000 Dallas, TX. 75201 (214) 758-1087 Fax: (214) 758-8387 There has been no recent development history on this site commonly referred to as Andrew Brown Park West. Page 1 of 3 Item # 5 TRANSPORTATION:Denton Tap Road is a P6D, six lane, concrete divided thoroughfare developed to standard and contained within a 110-120 foot right-of- way. SURROUNDING LAND USE & ZONING: North -park land, flood plain, and single-family housing; TC (Town Center), PD-133, FP/SF, Planned Development-133 South - park land; TC (Town Center) East- park land; TC (Town Center) West - park land; TC (Town Center) COMPREHENSIVE PLAN: The Comprehensive Plan of May 1996 shows the property as suitable for park and open space use. DISCUSSION: This is a request to locate three Verizon telecommunication antennas on a replacement to one of the City's light poles in Andrew Brown Park West. More specifically, Verizon would like permission to replace a 70-foot light tower with an 80-foot combination light and cell tower in close proximity to the concession stand in Andy Brown West. Verizon plans to utilize the additional ten feet of pole space to install three- telecommunication antennae roughly 6-feet long by 6-inches wide by 3- to 4-inches deep. In addition, a 12-foot by 14-foot equipment shelter approximately 8-9 feet tall and attached to the concession stand is also requested for this site. As indicated by the applicant, the shelter will match the existing brick of the concession stand and will not interfere with any stand activities. That understanding will be a staff recommended condition of approval of this request. A lease agreement between the City and Verizon is being worked out and will be an additional condition of approvak Our leases are generally set up for five-year terms, have built-in escalators, and are renegotiated at the end of the lease period. The applicant has stated agreement with these guidelines. Entrance to the equipment shelter in the applicant's exhibit shows an east- facing entrance. Staff prefers a south entrance because that location minimizes visibility into the shelter from the Denton Tap Road side of the building. It is our understanding the applicant is agreeable to moving the entrance, but we will include that as a condition of approval. Page 2 of 3 Item # 5 RECOMMENDATION TO THE PLANNING ANT) ZONING COMMISSION: Staff recommends APPROVAL of this request, subject to the following conditions: 1) Equipment shelter will match existing brick color and pattern of concession stand, and attach to existing building on the north side. 2) Construction procedures of this application will not interfere with activities scheduled within the park, and procedures and detailed plans will be approved by the Parks Department. 3) No game schedules can be affected by this construction. 4) Removal of existing light standard and installation of new light standard must occur on same day. 5) Any damage to the Park will be repaired by Verizon; repairs will require approval of the Parks Department. 6) A lease agreement will be approved by City Council. 7) Entrance to the concession building addition will be moved to the south side of the addition. 8) Need sealed structural drawings on new base support or engineer's certification of existing base to support new pole. ALTERNATIVES 1) 2) 3) 4) Recommend approval of the request Recommend disapproval of the request Recommend modification of the request Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) Application Submittal Package a) letter of introduction (2 pgs.) b) existing/future cell tower coverage (2 color pgs.) c) application d) proposal description (2 pgs.) e) antenna cut sheeffsite layout of ~'ound equipment (2 pgs.) f) reduced site plan g) parcel description/easements (2 pgs.) h) affidavits/exhibits of David R. Mason and David Franks (6 pgs.) i) search ring photos of cell site (4 color pgs.) k) full sized site plan Page 3 of 3 Item # 5 oBRACEWELL 500 N. Akard Street, Suite 4000 Dallas, Texas 75201-3387 Phone: 214.758.10~0 F~: 214.758.1010 August 9, 2004 By Messenger Mr. Gary L. Sieb / ~ -- Director, Planning Department /er~ ~ City of Coppell [~ ~ 2001 255 P~kway Blvd. ~ Revised Coppell, TX 75019 ~, ~ & Z Re: Zoning Application for approval on ~te~~zon Wireless Dear Mr. Sieb: Please allow the attached to serve as the Zoning Application filed by Dallas MTA, L.P., dgo/a Verizon Wireless ("Verizon Wireless") for the following site: 363 N. Denton Tap Road (Coppell North Site) Verizon Wireless hereby applies for administrative approval and, in the alternative, a special use permit for the construction of the tower improvements herein described. We have previously enclosed a check for $405.00 representing the filing fee for the application. Please consider the propagation maps contained in the application as the inventory of existing sites required under Section 12-32A-3(C) of the Code of Ordinances of the City of Coppell. Section 12-32A-3(F) requires that towers comply with all FAA/FCC regulations. The full review of this site is still in process, but we do not anticipate any problems with compliance with FAA or FCC regulations. Section 12-32A-3(G) requires that towers comply with buildings codes and applicable standards for towers. Verizon Wireless will be applying for a building permit for the site and requests approval of the application subject to the requirement that Verizon Wireless obtain a building permit from the City of Coppell prior to the commencement of any construction. Section 12- 32A-3(L) prohibits any signage on any antenna or tower. As indicated on the photo simulations attached to the application, Verizon Wireless will not attach any signs to any antenna or tower. DALLAS~221300· 1 Houston Austin Corpus Christi Dallas Fort Worth San Antonio Washington, D.C. Northern Virginia London Almaty R EWELL Section 12-32A-6(B)(1)(k) of the City Code requires a description of feasible locations of future towers or antenr/as within the City. This determination is typically made as the need for such towers arises. As indicated in the Affidavits that accompany the application, this site will provide coverage to a major portion of the City and will fill existing gaps in coverage. For your benefit, I have attached two propagation maps as Addendum A to this cover letter. The first indicates the present coverage of the City, and the second shows the coverage upon completion of the tower covered by this application as well as the other two site presently under review by the Planning Department. Please note that this cover letter and all attachments should be made a part of the public record with respect to the application attached hereto. Please contact with me with any questions or concerns. Very truly yours, Bracewell & Patterson, L.L.P. Mason M. Griffin /mmg Attachments Addendum A See attached propagation maps depicting present and future coverage of the City DALLAS~221300.1 COPPELL Zoning Application Planning Department 255 Parkway Blvd. Coppell, Texas 75019 Phone: 972-304-3678 Fax: 972-304-7092 Filing Date: Name of Applicant: 1 Applicant Address: Telephone Number: Zoning Requested: July 19, 2004 Filing Fee: Dallas MTA, L.P., d/b/a Verizon Wireless 500 West Dove Road, Southlake, TX 76092 (682) 831-3226 Fax Number: $405.00 (682) 682-3282 TC Total Number of Acres: 0.004 acres ( 172 square feet) Property Location: 363 N. Denton Tap Road (Coppell North) Reason(s) for Zoning Change: See attached NOTE: Applicant is responsible for erecting, maintaining and removing a sign notifying the public of the pending zoning application. The sign shall be posted ten (10) days prior to the Planning Commission meeting and shall be removed after the City Council's approval or disapproval of the application. Failure to erect the sign at least (10) days prior to the Planning Commission hearing may result in postponement of the zoning case until this condition is met. Deposit in the amount of one hundred and fifty dollars ($150.00) for the metal, full-frame zoning change sign. and one-hundred dollars ($100) for window signs will be required. The deposit will be refunded by mail after the sign is returned in good condition to the Planning Department. Name of Representative: Mason M. Griffin Name of Property Owner: City of Coppell Address of Property Owner: 255 Parkway Boulevard, Coppell, TX 75019 Signature of Property Owner: Date: 363 N. Denton Tap Road Coppell North Site Verizon Wireless has negotiated a License for Communications Facilities with the City of Coppell. Verizon Wireless will replace an existing seventy foot (70') light standard at this location with an eighty foot (80') light standard. Verizon Wireless will utilize the additional ten feet of pole space to install ~elecommunications antennas. Verizon Wireless will re-install the City's lighting equipment at the current height of seventy feet (70'). Per Section 12-32A-4(B) of the Code of Ordinances of the City of Coppell (the "City Code"), "The following uses are specifically permitted: Antennas or towers located on property owned, leased, or otherwise controlled by the city provided a license or lease authorizing such antenna or tower has been approved by the city." While this site does not require administrative approval or a special use permit, the City Council has instructed the Planning Department to adhere to the requirements under the remainder of the City Code when processing this type of request. According to the pertinent portion of Section 12~32A-5(B) of the City Code, the city planning director may approve an antenna which is attached to an existing tower, provided (i) the type of tower is not affected, (ii) a height extension may not exceed thirty feet (30') over the existing tower's height, (iii) the height change may only occur once in the lifespan of the tower, and (iv) the additional height shall not require additional distance separation as required in Section 12- 32A-6 of the City Code. Additional restrictions are placed on towers that are being relocated within the property, but Verizon Wireless will not be relocating the tower. Type of Tower The existing seventy foot (70') light standard will need to be replaced for structural reasons, but the replacement pole will also be a light standard, so the type of tower will not change. Height Extension The light standard will need to be extended a total of ten feet (10') to accommodate the Verizon Wireless antennas. This extension is indicated in the photo simulation attached to Addendum D which shows before and after shots of the proposed extension. Verizon Wireless will attach three antennas to the extension. Diagrams and specifications of the antennas (including dimensions) are attached to Addendum A. History of Height Changes According to John Elias with the Parks and Recreation Department of the City, the tower was constructed in 1991 and has never been extended. Distance Separation Please review the Site Plan attached as Addendum A for information related to distance separation requirements as required under Section 12~32A-6 of the City Code. DALLAS~221300. I Equipment Shelter As shown on Addendum D, Verizon Wireless will utilize brick matching, in color and pattern, the existing brick structure. Although the proposed wrought iron door is shown on the East side of the proposed expansion, the gate can be placed at whatever location the City desires, as long as Verizon Wireless is able to get to its equipment. The wrought iron gate will be black. Additional Materials The proposed extension to the tower meets all of the requirements for administrative approval described in the City Code. Additionally, we would like to provide the following information as required under Section 12-32A-5(A)(2) and (3): Site Plan Attached as Addendum A Legal Descriptions of parent tract Attached as Addendum B and leased parcel Setback distances As shown on Addendum A Separation distances As shown on Addendum A Landscape Plan As shown in Addendum D RF Affidavit Attached as Addendum C Site Acquisition Affidavit Attached as Addendum D Method of fencing, color and As shown in Addendum D camouflage Description of Compliance with As shown on Addendum D Sections 12-32A-3 (D) of City Code Description of Compliance with Will include existing lighting - as Sections 12-32A-3(E) of City Code shown on Addendum D Description of Compliance with As shown on Addendum A Sections 12-32A-3(M) of City Code Statement of collocation To be determined by owner of accommodation capacity tower - City of Coppell Identification of entity providing Dallas MTA, L.P., d/b/a Verizon network Wireless Description of suitability of existing As described in Addendum D towers, other towers, etc. We specifically request that all addenda and exhibits be entered into the record as submitted. Addendum A See attached Site Plan and Equipment Schematics DALLASL221300.1 SAWireless' Model No PCSX065-18-* Frequency Gain Input Impedance VSWR Polarization Electrical downtili Azimuth beamwidth Elevation beamwidth 1" upper sidelobe I '~ Null Front to back ratio Intermedulation Input power Input connector Temperature Mounting interface Survivalwind speed Wind loads at 100 m_Ph (45 n3/s) Weight Dimensions .Mounting bracket required:. 1850 - 1990 MHz 18.5 dBi (16.4 dBd) 50 ohms < 1.4:1 + 45'~ 0 ,2 ,5 65° 5o <-16dB · -20 dB >25dB < -153 dBc for 2 x 20 W carriers 2 x 125 W at 40°C 7/16-DIN female - 40°F (- 40°C) to + 140°F (+ 60°C) Wall or pole 2 - 4.5 in diameter (48 -115 mm), clw pan & tilt · 125 mpt~ (56 m/s) . Front: 72 Ibf(320 N) Side: 4'3 Ibf(190 N) Antenna 13.2 lbs (6 kg) Bracket 7.7 lbs (3.5 kg) 69.0 x60 x 3.5 in. (1753 X 152 x 89 mm) XSL53863 Typical Radiation Patterns Elevation 0° downtilt Elevation 2° downtilt Elevation 5° downtilt Radiation patterlls available from the CSA Website in all the software planning tools Visit http:/twww csa-wireless corn Americas office: CSAWireless, Post Office Box 368, 1700 NE Cable Drive, Conover, NC 28613, USA Tel 828 466 0412 Fax 828 466 0413 e-mail csa.sales@tripointglobal.com International office: CSA Limited, Knight Road, Rochester, Kent, England ME2 2AX Tel +44 (0)1634 715544 Fax +44 (0)1634 715742 e-mail sales@csauk.com © 2001 CSA reserves the right to modify or change the specifications shown above Addendum B Parent Tract Description Being a tract of land situated in the Clarinda Squires Survey, Abstract No. 1327 and the S.A. & M.G.R.R. Survey Abstract No. 1430 in the City of Coppell, Dallas County, Texas and also being part of a tract of land as described in deed from Good Financial Corp. to M. Douglas Adkins, Trustee, as recorded in Volume 76186, Page 2355 of the Deed Records of Dallas County, Texas and being more particularly described as follows: Commencing at a point of intersection of the West line of Denton Tap Road (a variable width right of way) with the centerline of Denton Creek, said point also being the most southerly Southeast comer of a tract of land as described by deed to Jack Livley recorded in Volume 426, Page 510 of the Deed Records of Dallas County, Texas; Thence with the said line of Denton Tap Road S0°51'58"E, 49.64 feet to the Point of Beginning; Thence continuing along said line of Denton Tap Road, S0°51'58"E, 292.18 feet to the beginning of a curve to the right having a central angle of 2°53'00'' and a radius of 5669.70 feet; Thence along said curve 285.32 feet to the end of said curve; Thence S0°37'34"W, 161.90 feet; Thence S6°19'20"W, 321.88 feet; Thence S1°00'58"E, 22.05 feet to a point for comer; Thence S67°24'35"W, leaving the said West line of Denton Tap Road, 902.06 feet to a point for corner; Thence NI°I 1'53"W, 64.43 feet to a point for comer; Thence N35°29'46"W, 198.08 feet to a point for comer; Thence N4°43'22"W, 536.17 feet to a point for comer; Thence N57°00'34"E, 1226.37 feet to the Point of Beginning and containing 21.250 acres of land. (As described in Volume 83005, Page 3569 of the Deed Records of Dallas County, Texas.) Verizon Wireless' Site Description A tract of land lying in and being a part of an existing 21.250 acre CITY Tract, situated in the Clarinda Squires Survey, Abstract No. 1327, and the S.A. & M.G.R.R. Survey, Abstract No. 1430 in the City of Coppell, Dallas County, Texas, being more particularly described by metes and bounds as follows: Commencing at the Northwest comer of the above described 21.250 acre CITY tract; Thence S04°06'53"E on the West line of said 21.250 acre CITY tract, a distance of 132.86 feet to a point; Thence N66°25'08"E, a distance of 502.76 feet to a 1/2" iron rod set for the Northwest comer of a proposed Licensee lease site, and the Point of Beginning; Thence continuing N66°25'08"E (LI), a distance of 12.00 feet to a 1/2" iron rod set for the Northeast comer; Thence S23°34'52"E (L2), a distance of 14.30 feet to a 1/2" iron rod set for the Southeast comer; Thence S66°25'08"W (L3), a distance of 12.00 feet to a 1/2" iron rod set for the Southwest corner; Thence N23°34'52"W (L4), a distance of 14.30 feet to the Point of Beginning, containing 172.00 square feet or 0.004 acres, more or less. Verizon Wireless Coaxial Easement Description A 5.00 foot wide easement for utility purposes crossing a part of the CITY 21.250 acre tract, situated in the Clarinda Squires Survey, Abstract No. 1237, and the S.A.& M.G.R.R. Survey, DALLASL221300.1 Abstract No. 1430 in the City of Coppell, Dallas County, Texas, said easement being 2.50 feet on each side of the following described centerline: Commencing at a 1/2" iron rod set for the Southeast comer of the above described 0.004 acre proposed Licensee Lease Site; Thence N23°34'52"W on the East line of said 0.004 acre proposed Licensee Lease Site, a distance of 7.15 feet to the Point of Beginning; Thence S85°35'24"E, a distance of 66.75 feet to an eytding point at an existing light pole. Sidelines for said easement are to be extended or shortened such as to begin on the East line of the above described 0.004 acre proposed Licensee Lease Site, and terminate at an existing light pole. Addendum C See attached RF Affidavit DALLASX221300.1 CoppellNorth 167539B RF Affidavit AFFIDAVIT STATE OF TEXAS § COUNTY OF DALLAS § BEFORE ME, the undersigned authority, this day personally appeared David R. Mason, who being by me first duly sworn, on oath says as follows: "My name is David R. Mason. I am over the age of 18 and have never been convicted of a felony or crime involving moral turpitude. I have been working as a radio frequency engineer for over 26 years. I have personal knowledge of the facts and statements contained herein. "I am the Manager of RF System Design for Dallas MTA, L.P. d/b/a Verizon Wireless ("Verizon Wireless") in the Dallas-Fort Worth Market. Verizon Wireless has conducted radio frequency studies of the area surrounding the proposed wireless communications facility site located at 363 North Denton Tap Road, Coppell, Texas (the "Proposed Site"). Attached to this affidavit and incorporated herein by reference as Exhibits A and B are propagation studies depicting simulated radio frequency coverage in the area of the Proposed Site both before (Exhibit A) and after (Exhibit B) the Proposed Site is constructed and activated. Exhibit A is a true and accurate simulation of existing radio frequency coverage in the area of the Proposed Site and sho~vs varying degrees of less than optimum coverage in the general vicinity of the Proposed Site, including, without limitation, existing significant gaps in coverage. In real world terms, the colors indicate the following: White = No coverage Brown = Coverage outdoors Blue = Coverage inside vehicles Red = Coverage inside residences Green = Coverage inside commercial buildings This evidence conclusively demonstrates Verizon Wireless' need for the Proposed Site. As shown in Exhibit B, following construction and activation of the Proposed Site, Verizon Wireless' coverage and capacity needs in the immediate area of the Proposed Site will be substantially satisfied. "This Proposed Site will provide optimal coverage for the residential areas surrounding the Proposed Site and will serve both coverage and capacity needs for a 3/4 mile radius around the intersection of Denton Tap Road and Parkway Boulevard in the immediate vicinity of the Proposed Site. DALLASX221297. The Proposed Site will fill existing significant gaps in the ability of remote users of Verizon Wireless' wireless network to access the national telephone network. "The minimum height of the pole at the Proposed Site, when coupled with Verizon Wireless' existing system, necessary to meet Verizon Wireless' radio frequency coverage and capacity objectives is eighty (80) feet. The Proposed Site, as designed, will substantially accomplish Verizon Wireless' radio frequency goals in the area while minimizing any aesthetic impact to the community." FURTHER, Affiant sayeth not. David R. Mason SWORN TO AND SUBSCRIBED BEFORE ME this 2004, by My commission expires: day of ,~x,,,~ Notaiy Public, in and for the State o- - ' ' - f Texas DALLAS~221297.1 -2- EXHIBIT A To Affidavit of David R. Mason See attached Propagation Map Coppell_North 167539B RF Affidavit DAL LASL221297. EXHIBIT B To Affidavit of David R. Mason See attached Propagation Map Coppell_North 167539B RF Affidavit DALLAS\221297.1 Desired Covera~ Is Green: Addendum D See attached Site Acquisition Affidavit DALLASL221300.1 Coppell_North 167539B Affidavit of David Franks AFFIDAVIT STATE OF TEXAS § COUNTY OF DALLAS § BEFORE ME, the undersigned authority, this day personally appeared David Franks, who being by me first duly sworn, on oath says as follows: "My name is David Franks. I am over the age of 18 and have never been convicted of a felony or crime involving moral turpitude. I am the Site Acquisition Agent for Dallas MTA, L.P. d/b/a Verizon Wireless ("Verizon Wireless") responsible for the Search Ring encompassing the Coppell North Site. I have worked as independent contractor for Verizon Wireless, or its predecessor, in this capacity for the past seven years. I have personal knowledge of the facts and statements contained herein and they are all true and correct. "I have been personally involved in the identification of viable candidates and in the negotiations with potential lessors for this site. Verizon Wireless issued a "search ring" for this site in 2003 (attached hereto as Exhibit A). Initially, I contacted Gary Sieb about collocating on a light standard owned by the City of Coppell (the "City") at Andrew Brown Park on the east side of Denton Tap Road. The City had entered into other agreements with other wireless carriers in the past, and we believed we could work out a deal. There was no room to collocate on the light standards on the east side of the Denton Tap Road, but Gary pointed out that there was capacity on the west side. Gary suggested replacing the existing seventy-foot light standard with an eighty-foot light standard. The City would be able to keep their lighting equipment on the tower, and Verizon Wireless would install its antennas in the ten-foot extension." "The extension of the existing light standard is the least-intrusive manner available to serve Verizon Wireless' customers' coverage needs. As indicated on the photo simulations attached to this Affidavit as Exhibit B the extension will only be ten feet and the equipment on the ground will be housed in a 14.3' by 12' lease area adjacent to an existing concession stand. The equipment will be sheltered, and the shelter will be constructed of the same materials as the concession stand." FURTHER, Affiant sayeth not. David Franks DALLAS~221294 1 SWORN TO AND SUBSCRIBED BEFORE ME this/,~_.day of June, 2004, by David Franks. My commission expires: Notary Public, in and for the State of Texas Coppell_North 167539B Affidavit of David Franks Exhibit A See attached Search Ring DALLASL221294.1 Verizon Wireless/South Area North Texas RF Engineering Search Ring / Search Area Description Project Name: Proposed Site Name: Proposed Site County: Market Name/Number: T-cell ID: Dallas MSA Infill Coppell Dallas County, Texas DalLas-Fort Worth MSA 167539 (Dallas-Fort Worth MTA) Ideal Location: Desired Tower: Desired Antenna Height: Map References: 32°58'45" lat, 96o59'30" lon, 460' New 80' tower 77' ACL USGS 7.5' quad - Carrollton, Tex Dallas MAPSCO 2000 -Map iA Grid X elev Coverage Desired: This site will provide stronger coverage to northwestern section of the city of Coppell. Site Location Selected: Area >460' elevation northeast of North Denton Tap road and Parkway Blvd. Known Towers: All the existing towers in the area are too far and does not fit into grid. AM & FAA Tower Searches: Nearest AM station is 2.53km (KJ~IF), within the 3.0km criteria for directional stations. This site will need before and after D24 measurements. Site is 4.16 miles from DFW International airports and passed the basic slope test. A~achments: 1) Section of 7.5' USGS quadrangle with search area indicated. 2) MAPSCO page with approximate search area indicated. 3) MapQuest plot of ideal location. 4) Listing of FAA g-ntenna Structure Registrations (ASR) in the area. 5) AM tower search results from FCC website. 6) TOWAIR search results from FCC website. IIssued by RF Engineer: Charles O. Nebe Approved by RF Manager: David R. Mason Rec'd by Site Acquisition: Date: September 30, 2002 Date: Date: C:XDOCUME- 1 \grifmm~LOCALS- 1 \Temp\CoppellNorth_SearchRing093002 .doc Printed: 07/07/04 Coppell_North 167539B Affidavit of David Franks Exhibit B See attached Photo Simulations DAL LASL221294 I PROPOSED VERIZON .ANTENNAS EXISTING LIGHTS TO -- BE RELOCATED TO NEW LIGHT STANDARD NEW LIGHT STANDARD. ANDREW BROWN JR. COMMUNITY PARK WEST (AFTER) WDG #030550 D[S[GN GROUP EXISTING LIGItT STANDARD. ANDREW BROWN JR. COMMUNITY PARK WEST (BEFORE) WDG #030550 WA~l .ACE DES[GN GROUP