DRC commentsCO?PELL
Project ID RP-04-0055
Address 100 E Vista Ridge Bird
OF COPPELLCOl'FELL
DRC REPORT ~ *w,~L% J~-~'?
Project Name Vista Ridge Addition, Lots 1R-8, Block D
Project Type
Application Date
Case Manager
Proiect Description
Replat
8/18/2004
Gary Sieb
To allow for the development six, one and two story general and medical offica buildings, totaling approximately 62,200
square feet
Agency
Building Inspection
Electric and Gas
1 of 3
Reviewed By Review Date Comments
Greg Jones 8/24/2004 1. No comments
George Long 8/26/2004 No comments received.
COPPELL
Agency
Engineering
Reviewed By
Ken Griffin
CITY OF COPPELL
DRC REPORT
Review Date
8/26/2004
COFFELL
Comments
Replat -
1. Provide 25' x 25' utility easements on each lot for
the fire vaults necessary for each fire line.
2. Increase the right of way to meet subdivision
ordinance requirements for commercial streets.
3. Relocate the utilities to the public fight of way, and
eliminate the "utility" from the "fire lane, access and
utility easement."
4. Extend the fight of way, and therefore the public
street to the intersection with SH 121.
5. Provide a drainage easement across Lot 7 for public
drainage.
6. Ensure any public utilities crossing private lots are
within an appropriate easement.
Preliminary Utility Plan -
1. Relocate the proposed Sanitary Sewer to the public
right of way.
2. Provide a vault for each fire service to the buildings.
3. Provide fire hydrants along the proposed fire lane.
Location and spacing should be coordinated with the
fire marshal.
4. Provide Fire Hydrants along S.H. 121 @ 300'
spacing.
5. Provide FDC connections for all spdnkled buildings.
Coordinate with the fire marshal for location of all
FDC connections.
6. The City of Coppell has a 12" sewer line in S.H. 121
ROW. Ensure you tie into the correct line,
Preliminary Drainage Plan -
1. Coordinate with the city of Lewisville for drainage
work located within that city.
2. Provide access points and or manholes at the
locations where the longer runs of pipe connect to the
existing 8' x 6' RCB.
3. Provide easement across Lot 7 for drainage in Plaza
Blvd.
4. All drainage within the development will be
privately owned and maintained up to the ROW line.
Additional comments may be forthcoming during full
engineering review.
COF'?ELL
Agency
Fire Administration
Parks and Recreation
Planning Department
Reviewed By
Tim Oates
John Elias
Gary Sieb
CITY OF COPPELL
DRC REPORT
Review Date Comments
8/25/2004 NO comment
8/24/2004 No comments.
8/24/2004
1. Property is in Dallas and Denton Counties, not
Collin County.
2. Show overalt width of Plaza Boulevard as 55 feet.
(PD can modify this req.)
3. Two story buildings need front yard setback greater
than 10 feet.
4. Need wall maintenance easement for wall shown
on Site Plan.
5. Several items shown in Legend do not apply to this
plat, please remove.
6. This plat is not Brighton Manor.
7. Legal description needs to include platted lot in
Dallas County, not just Denton County.
8. Change title block to reflect TXU Electric Delivery,
not Oncor Electric.
9. Reflect all changes listed in Site Plan review (street
widths, St. Hgy 121 name, etc.).
10. Indicate on plat reason for replat.