CC letter re approval-9/14/04COPPELL
September 15, 2004
Mr. Mason M. Griffin
Bracewell and Patterson, LLP
500 N. Akard Street, Suite 4000
Dallas, TX 75201
RE: Case No. S-1221-C, Verizon Wireless
Dear Mr. Griffin:
This letter is to inform you that Case No. S-1221-C, Verizon Wireless, zoning change request from C
(Commercial) to S-1221-C (Special Use Permit-1221-Commercial), to allow lbr a maximum 25-foot extension of
an existing 75-foot monopole, to allow' for a co-location of a wireless communication antenna at the height of 100-
feet, with ground-mounted equipment, located 636 Sandy Lake Road, was approved by the Coppell City Council
on Tuesday, September 14, 2004, subject to the following conditions:
1) The ground equipment area and existing tower be completely enclosed in brick or
masonry product, as approved of City staff.
2)
The Chief Building Official review and approve signed and sealed structural drawings
from a registered structural engineer attesting that the existing tower and foundation are
structurally sound to bear the additional weight of a 25' extension with six additional
antennae.
In order to prepare an Ordinance, we need to assemble appropriate documentation. When this has been completed
and Council has approved the Ordinance, a copy will be sent to you.
As a reminder, the zoning change sign can now be returned to the Planning Department for your deposit
reimbursement of $150.
lfyoa have any questions, please contact the Planning Department at (972) 304-3678.
Dallas MTA, L.P., d/b/a Verizon Wireless
BuiLding Inspection
file
COFFELL
Project ID SUP-04-0051
Address 636 E Sandy Lake Rd
CITY OF COPPELL
DRC REPORT
Project Name
COPPELL
S-1221, Verizon Wireless
Project Type
Application Date
Case Manager
Project Description
Special Use Permit
7/22/04
Gary Sieb
Zoning change request from C (Commercial) to C-S-1221 (Commercial -Special Use Permit-1221) to allow for the extension
of an existing 75 foot monopole by 25 feet, to allow for a co-location of a wireless communication antenna at the height of
100 feet, with ground mounted equipment,
Agency
Building Inspection
1 of 1
Reviewed By Review Date
Greg Jones 7/23/04
Electric and Gas George Long 7~28~04
Engineering Ken Griffin 7/29/04
Fire Administration Tim Oates 7/29/04
Parks and Recreation John Elias 7/26/04
Planning Department Gary Sieb 7/26/04
Comments
1. Need sealed structural plans of pole base at permit
submission or engineer's letter certifying structurat
capability of existing base to support new pole.
Zoning change acceptable.
No comments.
No comments.
No comments.
1. Please label all exhibits and assure graphic "before"
and "after" representations are of equal quality,
2. This antenna is already 75 feet high, 80 foot max
height recommended.
3. Dimension and indicate color of three metal cabinets
to be located at base of antenna.
4. For clarity, make sure proper exhibit letter appears
on all documents.
5. Please clearly state and show the number of
antenna proposed for this tower.