Loading...
P&Z letter of approval-11/19/04COPPELL November 19, 2004 Coppell Sandy Lake Industrial, LP C/o A1 Sorrels 5055 Keller Springs Road, Suite 300 Addison, TX 75001 RE: Coppell Trade Center~ Lot 1, Block 1~ Minor Plat Dear Al: This letter is to inform you that the Coppell Trade Center, Lot I Block 1, Minor Plat, to allow the construction of a 195,845-square-foot building (Phase 1) on a portion of 40.6 acres of properly located along the north side of Sandy Lake Road, between Northpoint Drive (extended) and the extension of Freeport Parkway, was reconunended for approval by the Coppell Planning and Zoning Commission on Thursday, November 18, 2004, subject to the following conditions: 1) Prepare title, signature and additions statements as outlined in the Coppell Subdivision Regulations. 2) Abide by Engineering's comments (attached) The date scheduled for consideration by the Coppell City Council is Tuesday, December 14, 2004, at 7 p.m. A representative for this case must be present at this meeting, which will be held in Council Chambers at City Hall. Failure to represent this item may result in the denial of this application. CiD' Council has instructed staff to include in its agenda packets only those items that accurately reflect conditions as recommended by the Planning and Zoning Commission. Therefore, please submit to the Planning Department three (3) folded copies of the revised Minor Plat on or before 12 noon~ Wednesday~ December 1't. Also, please submit one (1) 8 '/2 x 11 paper reduction, along with one jpg, tiff, pdfor similar electronic file. If you have any questions, please contact the Planning Department at (972) 304-3678. Sincerely, 9r3 . [eb, A.I.C.P. Dkector 6f Planning Attachment Cc Dayton Macatee, Macatee Engineering Building Inspection file COI F'ELL Project ID MP 04 0069 Address 756 W Sandy Lake Rd CITY OF COPPELL 2nd DRC REPORT Project Name COPPELL Coppell Trade Center, Lot 1 Block 1, Minor Plat Project Type Application Date Case Manaqer Project Description Minor Plat t 0/20/2004 Gary Sieh allow the consffuct~on of approximately t95,845 square foot building (Phase 1) on a portion of approximately 406 acres of property tocated along the north side of Sandy Lake, between Northpoint (extended) and the extension of Freeport Parkway ARency Eng~neenng 1 of 1 Comments Utility Plan - 1 During final review, we will look at the detail of the public water on the west side of the property Drainage - 1 A detailed analysis of the drainage through this site will be requested Any increase in velocity to the adjacent property will need to be mitigated onsite, or an agreement with the adjacent property owner will be required 2 A property owner's agreement must be submitted to the city deady showing that the maintenance responsibility for the channel will be the property owners This includes any mowing, silt removal or correction of erosion along the channel Plat - 1 Fire vaults and all water meters shatl be located within the ROW or a dedicated utility easement Additional comments may be forthcoming with the submittal of final engineering plans