DRC comments re 6/3/04 mtg.COl'FELL
Prolect lO PD-04-0029
Address 500 Iake Vista Or
CITY OF COPPELL
DRC REPORT
Project Name
COl'FELL
PO-202 Villas of Lake Vista
Proiect Type
Application Date
Case Manager
Project Description
Re-Zoning PD
5/19/04
Gary Sieb
zoning change request from HC (Highway Commercial) to PD-202-TH-1 (Planned Development-202- Townhouse-1) to allow
the construction of 158 townhome lots and 13 common areas
Agancy
Building Inspection
Electric and Gas
Engineering
Reviewed By
Grog Jones
Ken Griffin
1 of 3
Review Date
5/27104
5/26/04
Comments
1. Automatic fire sprinkler system required.
No comments received
Also see comments under Preliminary Plat for this
case.
Site Plan -
1. No parking will be allowed within the right-of-way. All
off street parking shall be on an HOA maintained lot.
2. Name the medians shown in the street at both
entrances on Lake Vista Ddve with the designation "Lot
X", owned and maintained by the HOA.
3~ The waterline needs to be adequately looped. Them
am several areas where the flow is through a single 8"
waterline.
4. Explain the purpose of the 10' utility easement
reservation along the rear of the site.
Additional comments may be forthcoming during the full
engineering review.
NOTE: General Engineering Observations
These comments do not constitute a detailed review of
any Engineering submittals. Detailed review will be
performed after approval by City Council.
Site Plan
1. Verify that the proposed 8" waterline is adequate to
serve the fire flow demand for the entire development.
2. Verify the location of the existing stub-outs you plan to
tie into,
3. Install need to have a valve between the two
connections on the 12" main on the west side of
MacArthur Blvd.
4. Show fire hydrants on this site plan with appropriate
spacing.
5. Verify the location and capacity of the stub-out for the
sanitary sewer line.
6. The sewer line in all cases needs to end in a
manhole rather than a clean-out.
7. Street light locations shown here are subject to
review and approval by Oncor Electdc/'rxu.
COPPELL
Fire Administration
Parks and Recreation
Planning Department
Reviewed By
Tim Oates
John Elias
Gary Sieb
CITY OF COPPELL
DRC REPORT
Review Date
5/26/04
5/26/04
5/25/04
COl'FELL
Comment~
1. Fire hydrant distance not to exceed 300-foot spacing
(depending on Suilding Official's classification of
occupancy)
2.Unit numbers do not match on Site Plan and Prelim.
Water & SS Plan
3. Parking shall not bo allowed wihtin the "bulb" of the
cul-de-sac.
4. Automatic tire spdnklor systems will be required.
1) Park Development fees of $1285 per unit.
2) A Tree removal Permit will Be required prior to
removing any pretected trees from this sita.
3) Tree Calculations on Tree Survey & Mitigation plan
are incorrect.
4) Tree Survey information is incorrect. All trees are
pretected if they are 10" or greater, Remove dead trees
from survey.
5) Leyland Cypress is not sold by caliper inch, they are
sold by container size or heigth, Making it extremely
difficult to mitigate, each one will need to be field
measured to assure they are 3" DBH.
PLEASE SEE NOTE AT END OF THIS REVIEW.
SITE PLAN
1. Density a bit high: 30' lot widths in TH; 25' front yards
in TH; 20' rear yards in TH; minimum dwelling size shall
be 1,000 square feet with average size overall at least
1,300 square feet
2. Structures can not be built over easements
3. Identify all common areas on site plan
4. All parking spaces should be located outside public
5, Remove all utility lines from site plan
6. Alley widths typicalty 15' wide with 10' pavement
7. Variable front building line on units along Snowshill
Trail desirable; pretty monotonous as presented
8, Change notation on all exhibits frem "Guard House"
to "Entry Tower"
9. Add total number of guest parking spaces to "Lot
Data" entry; also, 79 spaces needed
10. Define "Amenity Center"
11. Please reduce Site Plan to fit one 24" by 36" sheet
ELEVATIONS
1. Much more detail is needed with regard to the photos
of elevations submitted. We need actual elevation
drawings showing materials, dimensions, floor plans,
details, etc.
2. Need detail on entry tower (size, height, building
material, etc.)
3. Rear of buildings need masonry material (we
assume will be shown on elevations)
LANDSCAPE/WALL PLAN
1. Eliminating 59 of 76 trees seems excessive, Our
Landscape Ordinance encourages preservation of
existing tree stock not elimination
2, Why no landscaping of median island on east end of
project?
COPPELL
Reviewed By
CITY OF COPPELL
DRC REPORT
Review Date
COPPELL
Comments
3. Why no landscaping of Lot 4X, Block A?
4. Define "Amenity Center Site", what goes in there?
5. Does brick screening wall have soldier course with
weep holes at base?
6. Please provide landscape calculations as required
by Sec. 12-34-8 and 9 of the Comprehensive Zoning
Ordinance and show on Landscape Plan
7. State color of decorative fence
COLOR BOARD
1. Provide window framing sample with color
2. Provide paint color samples for all painted exterior
surfaces
3. Provide window glazing sample
4. Provide color of decorative metal fencing
NOTE: AFTER DETAILED REVIEW (SEE COMMENTS
ABOVE) THIS PROPOSAL IS NOT READY FOR
PROCESSING: DENSITY IS TOO GREAT,
DEVELOPMENT STANDARDS HAVE NOT BEEN MET,
REQUIRED INFORMATION WAS NOT PROVIDED, ETC.
APPLICANT WOULD BE WELL SERVED TO
POSTPONE THIS CASE TO A FUTURE DATE.
COFFELL
Croiect ID ~-04-0030
Address 500 Lake Vista Dr
CITY OF COPPELL
DRC REPORT
Project Name
COPPELL
Villas of Lake Vista
Project Type
Application Date
Case Manager
Project Description
Preliminary Plat
5/19/04
Gary Sieb
to allow the construction of 158 townhome lots and 13 common areas
Agency
Building Inspection
Electric and Gas
Engineering
Reviewed By
Greg Jones
Ken Griffin
1 of 2
Review Date
5/27/04
5/26/04
Comments
t. NO comments made.
No comments received
Preliminary Paving Plan -
1. Ensure all finish floor elevations are a minimum of 2
feet above the existing 100-year water surface or 1 foot
above the ultimate water surface, whichever is higher.
2. All parking shown within public right-of-way needs to
be located outside of ROW on adjacent HOA-owned and
maintained property.
3. All access to and from Lake Vista Drive needs to be
coordinated with the City of Lewisville, as it is a
Lewisville owned and maintained street.
Preliminary Water & Sewer Plan Sheet-
1. We need easements to cover the sewer line and
water line as it crosses through Lot 1X on the property,
General Note -
1. Provide utility easements on all lots where water &
sewer lines cross the lot.
2. Waterline needs to be sufficiently looped to provide
continuous service in the event of an outage in any
particular area.
Preliminary Drainage Plan -
1. You need permission from City of Lewisville to tie into
their storm sewer line in their street (Lake Vista Drive).
Also. permission must be obtained to discharge
surface flow into their street.
2. We need a letter for our file from the City of Lewisville
to the developer stating that permission is granted to
use storm sewer lines and drain to the street, and to cut
the street to access those storm sewer lines. Repair of
Lake Vista Drive will need to be done in accordance
with City of Lewisville standards.
Additional comments may be forthcoming during the full
engineering review.
NOTE: General Engineering Observations
These comments do not consfitute a detailed review of
any Engineering submittals, Detailed review will be
performed after approval by City Council.
COFFELL
Agency
Reviewed By
CITY OF COPPELL
DRC REPORT
Review Date Comments
COFFELL
Preliminary Paving Plan -
1. The visibility at the end of the alleys on the south side
needs to be taken into consideration with the common
area.
2. The alley section shown needs to have a minimum 6"
lime stabilized subgrade beneath it. The paving
section needs to be a minimum 6", not 4" as indicated.
3. Typical parking space is 9'x 19', not 9'x 18' as shown.
4. Build sidewalk adjacent to MacArthur and Lake Vista.
Preliminary Water & Sewer Plan Sheet-
1. The 8" waterline may not be adequate to
serve a property with this density as far as fire flow
requirements are concerned.
2. Verify the existence of or put in a valve between the
two feeds.
General Note -
1. End the 8" sanitary sewer line in a manhole.
2. Verify the location and elevation of the water & sewer
stub-outs to make sure they are able to serve the
property.
Preliminary Drainage Plan -
1. This plan should include a table of drainage areas.
Fire Administration
Parks and Recreation
Planning Department
Tim Oates
John Elias
Gary Sieb
5/26/04
5/26/04
5/25/04
1. Fire hydrant distance not to exceed 300-foot spacing
(depending on Building Official's classification of
occupancy)
2.Unit numbers do not match on Site Plan and Prelim.
Water & SS Plan
3. Parking shall not be allowed wihtin the "bulb" of the
cul-de-sac.
No comments.
1. Increase size of Plat exhibit
2. Decrease size of written statements so Plat and
statements fit on 24" by 36" sheet
3. Identify medians with lot and block numbers
4. Show line between Dallas and Denton counties
5. Place volumn and page number at bottom right of
plat document
6~ Mayor is Douglas N. Stover, not Candy Sheehan
7. This plat is located in Denton County, not Dallas
County
APPLICANT HAS OPTION OF WITHDRAWING THIS
PLAT; ZONING APPLICATION IS NOT COMPLETE.