Loading...
CC approval on 12/14/04AGENDA REQUEST FORM COPPELL DEPT: Planning DATE: December 14, 2004 ITEM #: 15 ITEM CAPTION: PUBLIC HEARING: Consider approval of Case No. PD-208-LI, Coppell Trade Center, zoning change request from LI (Light Industrial) to PD-208-LI (Planned Development-208-Light Industrial) to approve a Concept Plan to allow the construction of approximately 645,000-square-feet of office warehouse uses on 40.6 acres of property, and approval ora Detail Plan for Phase 1 on 12.87 acres of property, containing a 195,845-square-foot building located along the north side of Sandy Lake Road, between Northpoint Drive (extended) and the extension of Freeport Parkway. GOAL(S): APPROVED BY CITY COUNCIL EXECUTIVE SUMMARY:°N ABOVE DATE Date of P&Z Meetino: November 18 Motion to close Public Hearing & Approve subject to conditions 1 & 7 below and tree retribution in the amount of $120,000 to be paid in two phases of $60,000 each, payable prior to the issuance of the CO i~or each phase or in full within 5 years. M - York Vote - 6-1 - Peters Tunnell voted against 2004 Decision of P&Z Commission: Approval (6-0) with Commissioners Borchgardt, Hall, Foreman, Milosevich, Kittrell and Reese voting in favor. None opposed. Approval is recommended, subject to the following conditions: 1) Change address of Sandy Lake Industrial to "Addison" from "Dallas" on all exhibits. 2) Tree mitigation fees of $500,000 shall be spread over five years with equal amounts ($100,000/year) being paid annually (January lst). If, however, the Economic Development Committee and City Council can determine a more equitable fee arrangement, we would support their findings. ,j ....................................... ~, ...... d). (CON.MET) ~ ......~, ................................. t' ....... (CONDITION MET) 7) Abide by the departmental comments (Parks). (CONDITION MET) Staff recommends approval. Agenda Request Form - Revised 09/04 Document Name: ~ 3PD-208-LI I-AR CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE NO.: PD-208-LI Coppell Trade Center P & Z HEARING DATE: C.C. HEARING DATE: November 18, 2004 December 14, 2004 STAFF REP.: Gary L. Sieb, Director of Planning LOCATION: Along the north side of Sandy Lake Road, between Northpoint Drive and the extension of Freeport Parkway. SIZE OF AREA: 40.6 acres of property. CURRENT ZONING: LI (Light Industrial) REQUEST: Approval of a Concept Plan allowing the construction of approximately 645,000-square feet of office/warehouse uses on 40.6 acres of land and approval of a Detail Plan on 12.87 acres of Phase 1 development, containing a 195,845 square-foot building. APPLICANT: Coppell Sandy Lake Industrial LP or assigns A1 Sorrells, The Holt Companies 5055 Keller Springs Road Suite 300 Addison, Texas, 75001 (972) 280-8355 Fax: (972) 241-7955 HISTORY: Page 1 of 4 There has been no recent development history on the subject tract. Item #7 TRANSPORTATION: Sandy Lake Road is shown as a C4D/6, four-lane divided roadway in a ll0-foot right-of-way with construction to begin in early 2005. SURROUNDING LAND USE & ZONING: North - vacant; LI (Light Industrial) South - vacant; PD-194-LI (Planned Development for industrial uses) East - vacant; LI (Light Industrial) West - vacant: LI (Light Industrial) COMPREHENSIVE PLAN: The Comprehensive Plan of May 1996 shows the property as suitable for light industrial and showroom uses. DISCUSSION: Page 2 of 4 This is a proposed 40-acre warehousing project which will eventually house approximately 645,000-square feet of floor space in four buildings. As currently presented, this development will occur in three phases. Phase One is a detailed plan, Phases Two and Three are conceptual at the present time, hence, the request for both Concept approval and Detail Plan approval. The Concept Plan is in conformance with the Comprehensive Master Plan and, as stated above, is a three-phase development. Phase Two outlines two buildings with a total square footage of 300,000 feet being built in the northwest quadrant of the site. Phase Three shows one additional building of roughly 150,000-square feet being constructed just west of the Detail Plan submitted here. Phase One Detail Plan proposes a 195,800-square-foot warehouse being built on approximately 13 acres of ground at the eastern end of this parcel. Issues to be dealt with include drainage and tree mitigation. Open drainage is proposed to traverse the site, and we can support that concept here as we have done elsewhere in the industrial sections of Coppell. Tree mitigation is substantial on this site because the parcel is covered with trees. Taking into consideration the recently passed ordinance eliminating from retribution the calculation of the number of trees under the building, a substantial mitigation to the tune of $500,000 still exists. Item#7 If mitigation were to be figured only on the Phase One development, this figure would be substantially lower. However, because drainage issues must be dealt with at the outset of the project (and the vast majority of trees are in the proposed drainage channel; read: remove all trees), Phase One development must absorb this cost. We can support spreading the cost over a number of years, and one of our conditions statements addresses this issue with an arbitrarily suggested specific time period in which to pay this fee. Our Economic Development Committee is also working with this applicant exploring ways the mitigation figure might be reduced. If the Committee develops a more attractive retribution resolution, we would support their recommendation. The applicant is anxious to begin construction of this project, but a complicating factor is the fact that the Committee cannot consider this issue until its December 1 meeting. That date is two weeks after our Planning Commission meeting, and not knowing their final recommendation, the only position we can take is the fee payback option as expressed in the staff recommendation. We have purposefully written the mitigation condition subject to the EDC's findings. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends APPROVAL of this request subject to the following conditions: 1. Change address of Sandy Lake Industrial to "Addison" from "Dallas" on all exhibits. 2. Tree mitigation fees of $500,000 shall be spread over five years with equal amounts ($100,000/year) being paid annually (January lst). If, however, the Economic Development Committee can determine a more equitable fee arrangement, we would support their findings. 3. Do not include exhibits PD L0.01, .02, L1.01 in future submittals. 4. Provide REVISED exhibit L0.00 with mitigation changes (see John Elias e-mail attached). 5. Change Exhibit L1.01 to "Detailed" Landscape Plan. 6. Indicate Monument Sign letter materials on plan. 7. Abide by Departmental comments (Parks). 8. It appears Monument Sign colors have been reversed, please clarify. 9. Eliminate the Fire Department connection closest to Sandy Lake Road. Page 3 of 4 Item #7 ALTERNATIVES l) 2) 3) 4) Recommend approval of the request Recommend disapproval of the request Recommend modification of the request Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) 2) 3) 4) 5) 6) 7) Site Plan Exterior Elevations (Sheet A1.01) Series of Trade Center Drawings (Sheets PDL0.00, .01,.02, L1.01, .02, .03, PDL1.01) Tree Survey Field Data Perspective Drawing 8 ½" by 11" Overall Concept Plan Departmental comments (Parks) Page 4 of 4 Item#7 Z ~ i'T 0~ ~FIIN3D 3(]¥I~1 ll3ddOD ~]IN3D 30¥~1 llgddOD TREE SURVEY FIELD DATA TO ACCOMPANY SHEET L0.00 DATED 10.20.04 COPPELL TRADE CENTER SANDY LAKE ROAD AT NORTHPOINT DRIVE COPPELL, TEXAS PREPARED FOR: COPPELL SANDY LAKE INDUSTRIAL, L.P. OR ASSIGNS 09 NOVEMBER 2004 Survey data by: PACHECO KOCH CONSULTING ENGINEERS Mitigation Analysi~s by: SMR LANDSCAPE ARCHITECTS, INC. December 6, 2004 C OPi ELL Mr. A1 Sorrels The Holt Companies 5055 Keller Springs Rd., Suite 300 Addison, TX 75001 Dear Al: This letter is to inform you that on December l, 2004, the Coppell Economic Development Committee, an advisol~ group to the City Council, approved your request for an economic development incentive package and real property tax abatement for the approximately 645,000 square-foot office/warehouse project known as Coppell Trade Center. The City Attorney will be apprised of the Economic Development Committee's recommendations and will contact you and/or your counsel when the agreements are ready for your review. The following incentives were recommended by the Economic Development Committee: · A five-year seventy-five percent (75%) real property tax abatement for Bldgs. A-D. The commencement date will be January I of the calendar year immediately following the issuance of the first Certificate of Occupancy; any buildings that are not substantially under construction within five years of the commencement date will not be eligible for the tax abatement and the owner/developer will have to seek re-approval. · 50% Credit to the City of Coppell Reforestation and Natural Areas Fund in the mount of $184,650. The Economic Development ComaUttee recommended the retribution fee be paid in (3) phases of $61,550 each, to be paid prior to the issuance of the Certificate of Occupancy for each Phase, or in full within 5 years. Gross Rethbution (trees removed DBH) (Excludes trees located within the drainage channel) Preservation Credit (23%) Landscape Credit Net Retribution 50% Credit Balance due to the Reforestation & Natural Areas Fund 6,780" DBH -1,560" -I,527" 3,693" x $100 $369,300 -$184,650 $184,650 · 50% Waiver of Building Permit Fees for shell construction of Bldgs. A-D (Estimated savings of $42,084). All building permits must be obtained within five years. · 50% Waiver of Roadway impact Fees (Estimated savings of $93,810) The above incentives are contingent upon final approval by City Council and execution of the agreements. If you have any questions or comments relative to the economic development incentive and tax abatement agreement process, please contact me at 972-304-3677 or Chad Beach, Asst. Finance Director at 972-304-3692. Sincerely, Andrea L. Roy O' Economic Development Coordinator Chad Beach, Coppell Asst. Finance Director Gary Sieb, Dir. Planning & Economic Development John Elias, Park Operation Manager Ken Griffin, City Engineer Greg Jones, Chief Building Official December 2, 2004 Revised mitigation numbers for the Coppell Trade Center: Gross Retribution (trees removed DBH) DBH Preservation Credit (23%) Landscape Credit Net Retribution 6780" -1560" -1527" 3,693" x $100.00 $369,300.00 Economic Developmentcommi~eeisrecommending a 50% cmdit $184,650.00 $184,650.00 A contribution to the City of Coppell Reforestation and Natural Areas Fund in the amount of $184,650. The Economic Development committee is recommending the retribution fee to be paid in (3) phases of $61,550 each, to be paid in full in 5 years. Thank You John Elias Park Ope~tion Manager