Loading...
DRC commentsCOPpELL Project ID PD-04-0068 Address 756 W Sandy Lake Rd ClW OF COPPELL COPPELL DRC REPORT * Project Name PD-208-LL Coppell Trade Center Proiect Type Application Date Case Manager ProiectDescription Re-Zoning PD 10/20/2004 Gary Sieb zoning change request from LI (Light Industrial) to PD-208-LI (Planned Development-208-Light Industrial) to approve a Concept Plan allow the construction of approximateiy 645,000-square-feet of office warehouse uses, and approval of a Detail Plan for Phase 1 containing a 195,845-square-foot building, on approximately 40.6 acres of property located Agency Building Inspection Electric and Gas Engineering 1 of 1 Reviewed By Review Date Greg Jones 10/27/2004 Jeff Cu try 10/25/2004 Ken Griffin 10/28/2004 Fire Administration Tim Oates 10/27/2004 Parks and Recreation Planning Department John Elias 10/27/2004 Gary Sieb 10/25/2004 1. No floor plan information submitted for comments. Zoning Change Acceptable 1. What portion of grading, utilities and drainage will be built under Phase I? 2. See additional comments under plat case. Site Plan: 1. Show fire hydrant locations. 2. Show Fire Departrment Connection location. 3. Indicate all turning radii for fire lane. 4. Building will be required to have a mechanical smoke exhaust system, will need to show 'louvers' and fans on elevations. Preliminary Water: 1. Show Fire Department Connection location 2. Show automatic fire sprinkler tap and 'lead-in' 3. Dead-end fire lines not to exceed 150 feet 4. Must be able to prove 'fire flow requirements' for the building if using 6-inch underground piping to fire hydrants. 5. Fire hydrants and FDC shall be in 'landscape islands' for servicing purposes. 1. Tree Removal Permit will be required prior to the start of construction. 2. Additional discussion is needed as to the timing of the proposed removal of 13,744 caliper inches of trees in Phase 1, and the retribution being spread out over 5 years. 1. Appears landscaping provided is short of requirements. 2. Verify that the trees proposed to be within the existing 30' TP&L easement, along Sandy Lake Road, will be allowed under the existing overhead Bines. 3. Need color board for proposed Phase I construction. 4. Since Phase I is a detailed plan, the Landscape Plan should so indicate for the same phase. 5. Clearly show boundary of Phase ] landscaping. 6. Drake Elm not on plant palette. 7. Botanical names as well as quantities of each plant specimen needs to be shown on landscape plan for Phase I development.