Loading...
Elevations att. to CC 12/14 pckCONCRETE FORM LINER PAINTED P1 _~T.O. PARAPET 52'-6" REVEALS CONCRETE PAINTED Pl ,~.T.O. WINDOW ~9'-2" ALUMINUM STOREFRONT ~ WINDOW CONCRETE TILT PANEL PAINTED P2 PROPOSED FUTURE PTD. MTL. SCREEN 6' MAX ABOVE T.O. PARAPET (N.I.C.) CONCRETE TILT PANEL JOINT WALL PACK-- LIGHT FIXTURE (-rfP.) (~NORT.H ELEVATION CONCRETE ~-- CONCRETE TILT PANEL TILT PANEL PAINTED P1 PAINTED P2 // T.o. PARAPET 52'-0' ~ SQUARE FOOTAGE TABLE ELEVATION MATERIAL SQ. FT. PERCENTAGE NORTH CONCRETE 7,029 S.F. 96% GLAZING & STOREFRONT 254 S.F. 4% TOTAL SURFACE AREA 7,283 S.F. EAST CONCRETE 27,249 S.F. 93% GLAZING & STOREFRONT 2,154 S.F. 7% TOTAL SURFACE AREA 29,403 S.F. SOUTH CONCRETE 7,029 SF. 96% GLAZING & STOREFRONT 254 SF. 4% TOTAL SURFACE AREA 7,283 S.F. WEST CONCRETE 29,403S F. 100% GLAZING & STOREFRONT 0 S.F. 0% TOTALSURFACEAREA 29,403 S.F. WALL L:GHT (~p.) PACK --~ FIXTURE CONCRETE 'TILT PANEL JOINT WEST ELEVATION ~SCALE: 1/32' = iLO" _(~T.O. SCREEN WALL 16'-0" REVEALS -- CONCRETE TILT PANEL PAINTED P2 _~ T.O. PARAPET WALL 32'-6'~_ ~J~ T.O. PARAPET WALL 52'-0" -- CONCRETE TILT PANEL PAINTED P1 WALL PACK L[OHT F!XTURE CONCRETE FORM LINER PAINTED Pl (~ENLARGED CONCRETE TILT PANEL PAINTED P2 ? / SOUTH ELEVA T/ON ~SCALE: 1/16"= 1'-0' 4A PROPOSED FUTURE PTD. MTL. SCREEN 6' MAX ABOVE T.O. PARAPET (N.I.C.) EAST ELEVATION ~SCALE: 1/32'= REVEALS // CONCRETE NTED P1 T.O. PARAPET ~_ 50'-0' T.O. OPENING ~_ 12'-0" -~T.O. WINDOW ~ 9'-2" WALL PACK LIGHT FIXTURE CONCRETE--~ TILT PANEL ~ PAINTED P1 ~ONCRETE --,,-- TILT PANEL JOINT CONCRETE TiLT PAN PAINTED P2 REVEALS PACK LIGHT F!XTURE (TVP.) CONCRETE TILT PANEL PAINTED P1 6' MAX ABOVE T.O. PARAPET --CONCRETE TILT PANEL PAINTED P2 T.O. PARAPET A REVEALS 52'-6" q¢ ETE PAINTED Pl T.O. OPENING~ 12'_0' h ---% ~.o. w,,oo~ 9'-2" -- ALUMINUM STOREFRONT WINDOW CONCRETE FORM DNER PAINTED P1 ~:1t1-tl il l.l-tI~,,,J b - PROPOSED FUTURE PTD. MTL. SCREEN 6' MAX ABOVE T.O. PARAPET (N.I.C.) -- ALUMINUM STOREFRONT -- ALUMINUM EAST ELEVATION WINDOW WINDOW --LINE OF PARAPET BEYOND OVERFLOW SCUPPER (wP.) CONCRETE -- · TILT PANEL JOINT CONCRETE TILT PANEL PAINTED CONCRETE TILT PANEL PAINTED P1 P2-- CALF'_ 1/16 = ~-0 PACK LIGHT 9' 0"xl0' 0" DOCK FIXTURE (WP.) DZC~R (TV;.) CONCRETE TILT 7'-6"x10'-0 METAL,/ PANEL JOINT LOUVER WEST ELEVATION 4C T.O. FINISI- TRUCK DO( CONCRETE PAINTED Pl WALL PACK LIGHT FIXTURE T.0. PARAPET ~_ 30'-0" CONCRETE-- TILT PANEL JOINT ioPRCPOSED FUTURE PTD. MTL. SCREEN / / (_ CONCRETE TILT PANEL PAINTED P1 CONCRETE TILT PANEL PAINTED P2 T,O. PARAPET 52'-6" REVEALS NCRETE PAINTED P1 T.O. OPENING 1 2'-0" STOREFRON7 -'~T.O. WINDOW 9'-2' REVEALS REVEALS CRETE TILT PANEL PAINTED P2 T.O. OPENING ~_ 12'-0" ~ T.O. WINDOW 9'-2" ~ 4~ENLA, RGED EAST ELEVATION ~sENLARGED EAST ELEVATION -- ALUMINUM STOREFRONT WINDOW CONCRETE FORM LINER OWNER APPUcANT ~- ENGINEER ...... - .... merriman associates COPPELL TRADE CENTER - PHASE I OR ASSIGNS MERRIMAN ASSOCIATES/ARCHITECTS MACATEE ENC;INEERING EXTERIO ~ ~o~ o,~o ~ o,~.oN ,~c~r~ ELEVATIO SAND Y LAKE ROAD A T NORTHPoINT DRIVE ~.~,,,,~,o.o ~o,,.~,~~ COPPELL, DECEMBER1 , 2004 . . A1 . C