Concept Impact FeesCOPP-ELL
P,O. Box 478
255 Parkway Blvd
Coppell, TX 75019
Phone: (972)304-3681
Fax: (972)304-3570
ENGINEERING DEPARTMENT
FAX CO FER SHEET
To: Rodney Hitt From: Teresa Turner
Fax: 817-467-7713 Date: 6/23/03
Phone: Pages: 5 (including cover sheet)
Re: Concept Impact Fees - S,H. 121/MacArthur CC:
[] Urgent []For Review [] Please Comment [] Please Reply [] As Requested
If you have any questions, please contact me at 972-304-3681.
IF YOU DO NOTRECEIFE ALL OF THE PAGES PLEASE CALL (972) 304-3679
C t) oj Coppell Engineering- Iixtelleme By Des gn
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE:
Concept CommercialS. H. 121~MacArthur
6/23/03
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
2 - 2 inch 16 ESU's
2 . I 1/2 inch 10 ESU's
0 0 ESU's
2 - 8 inch 2.5 ESU's
Total #: 28.5 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #:
6 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #:
2 Domestic Meter(s) @ $205.28
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 2 Irrigation Meter(s)@
Total #: 0 Additional Irrigation Meter(s) @
Total #: 2 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$142.10
$0.00
$2,092.44
Domestic Water Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 4 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 16
(Due prior to issuance of building permit)
@ $280.00 ea.
Wastewater Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 2 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$7,980.00
$300.00
$410.56
$284.20
$0.00
$4,184.88
$60.00
$120.00
$4,480.00
$100.00
$100.00
$o.oo
$0.00
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
0
0
Single-famity @ $0.00 per lot
Multi-family @ $0.00 per unit
(50% paid prior to Council approval of final plat)
Page 1
DEVELOPMENT FEE WORKSHEET
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of.way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$28,560.00
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
Project:
Date:
DEVELOPMENT FEE TABLE
Concept Commercial S.H. 121 ~ MacArthur
6/23/03
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $7,980.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $300.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $410.56
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $4,469.08
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $60.00
( 100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $120.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $4,480.00.
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $28,560.00 $28,560.00
'(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) l[
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction) II
TOTAL $46,579.64
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $28,560.00
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Concept Commercial S.H. 121 ~ MacArthur
6/23/03
ROADWAY IMPACT FEE:
Service Area * 2
Eategory ** Commercial
Land Use ** Commercial Others Not Specified
Building Area (sO 20,000
Development Units ** 20.00
Vehicle Miles per Development Unit ** 4.76
Fee per Vehicle Mile ***
Roadway Impact Fee due - (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) -
$300
$28,560.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)