Loading...
Concept Impact FeesCOPP-ELL P,O. Box 478 255 Parkway Blvd Coppell, TX 75019 Phone: (972)304-3681 Fax: (972)304-3570 ENGINEERING DEPARTMENT FAX CO FER SHEET To: Rodney Hitt From: Teresa Turner Fax: 817-467-7713 Date: 6/23/03 Phone: Pages: 5 (including cover sheet) Re: Concept Impact Fees - S,H. 121/MacArthur CC: [] Urgent []For Review [] Please Comment [] Please Reply [] As Requested If you have any questions, please contact me at 972-304-3681. IF YOU DO NOTRECEIFE ALL OF THE PAGES PLEASE CALL (972) 304-3679 C t) oj Coppell Engineering- Iixtelleme By Des gn DEVELOPMENT FEE WORKSHEET PROJECT: DATE: Concept CommercialS. H. 121~MacArthur 6/23/03 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 2 - 2 inch 16 ESU's 2 . I 1/2 inch 10 ESU's 0 0 ESU's 2 - 8 inch 2.5 ESU's Total #: 28.5 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 6 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 2 Domestic Meter(s) @ $205.28 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 2 Irrigation Meter(s)@ Total #: 0 Additional Irrigation Meter(s) @ Total #: 2 Fireline Meter(s) @ (100% due prior to issuance of water meters) $142.10 $0.00 $2,092.44 Domestic Water Meter Deposit Fee: Total #: 2 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 16 (Due prior to issuance of building permit) @ $280.00 ea. Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 2 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $7,980.00 $300.00 $410.56 $284.20 $0.00 $4,184.88 $60.00 $120.00 $4,480.00 $100.00 $100.00 $o.oo $0.00 Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 0 0 Single-famity @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) Page 1 DEVELOPMENT FEE WORKSHEET (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of.way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $28,560.00 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 Project: Date: DEVELOPMENT FEE TABLE Concept Commercial S.H. 121 ~ MacArthur 6/23/03 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $7,980.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $410.56 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $4,469.08 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $60.00 ( 100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $120.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,480.00. (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $28,560.00 $28,560.00 '(100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) l[ Construction Inspection Fee Information not Available (100% due prior to Start of Construction) II TOTAL $46,579.64 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $28,560.00 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Concept Commercial S.H. 121 ~ MacArthur 6/23/03 ROADWAY IMPACT FEE: Service Area * 2 Eategory ** Commercial Land Use ** Commercial Others Not Specified Building Area (sO 20,000 Development Units ** 20.00 Vehicle Miles per Development Unit ** 4.76 Fee per Vehicle Mile *** Roadway Impact Fee due - (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) - $300 $28,560.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)