Loading...
Staff review comments-Concpt Pl T H E · C: I T Y · O F COPP-ELL Planning Department 255 Parkway Blvd Coppell, Texas 75019 Phone: 9721304-3678 Fax: 972-304-7092 PROJECT: COURTESY REVIEW OF CONCEPT PLAN FOR S.H. 121 AND MAC ARTHUR PLANNING DEPARTMENT CONTACT: Marcie Diamond DIRECT DIAL: 972-304-3676 FAX COVER SHEET DATE: May 29, 2003 TO: Stacy Standridge PAGES: 3 (including cover) FAX: 214-363-1997 Items Transmitted: Staff review comments on the Concept Plan for the southwest corner S.H. 121 and MacArthur Blvd. Remarks: Stacy, as we discussed, this is a preliminary/concept review of the plan submitted. This does not constitute approval of this site plan or any of the uses indicated. As we also discussed, all restaurants require SUP's and retail uses that are permitted by right, will still require site plan approval by Planning and Zoning Commission and the City Council. Strict adherence to the sign and architectural regulations of the Coppell Zoning and Subdivision Ordinances will be required. If you have any questions or would like additional information, please contact me at 972-304- 3676 or e-mail at mdiamond~cLcopp¢ll.tx.us. COURTESY REVTEW OF CONCEPT PLAN FOR S.H. 121 AND MAC ARTHUR Engineering Comments: · An EB right turn lane from SH 121 into the site may be required (this will need to be permitted by TxDOT - as will the driveway location). · A NB left turn lane at the intersection of Lake Vista and MacArthur will be required. Depending on visibility, alterations to the median landscaping may be necessary. The developer/owner is responsible for the construction of all required turn lanes into their site. · A corner clip visibility easement at the intersection of Forest Hill and lVlacArthur will be required (if not already existing). · Show the existing EB right turn lane from SH 121 to HacArthur. · Show the existing SB left turn lane from Mac, Arthur to Lake Vista Drive. · Maintain fire lane requirements (24' width, 54' outside radius, 30' inside radius). · The City of Lewisville will need to approve any tie-ins to the storm sewer in MacArthur Blvd. · Show the rights-of-way limits for all adjacent roadways. · Show all existing utilities and easements. · Sidewalk along MacArthur and SH 121 will be required. · Stamped concrete paver bands and ADA ramps will be required in all of the driveways which may also necessitate the dedication of sidewalk easements. It is highly recommend that a copy of our Subdivision Ordinance be reviewed (available in the Engineering Department for $25) prior to designing for this site. Fire Department Comments · A Loop water system will be required · All buildings 5,000 square feet or larger will be required to be sprinkled. Page 1 of 2 Planning Department Comments · It appears that a majority of the non-vehicular landscaping is being met through the provision of 40 to 50 foot wide buffers, which is permissible. The HC District requires 30' side yard building setbacks, the setbacks for parcels 3 and 4 are not in compliance with this provision of the ordinance. Section 12-22-4 states that "No more than 50% of the required parking is allowed in the front yard" Several of the parcels have greater than 50% of the required parking in the front yard. As we discussed all restaurants require SUP's and retail uses that are permitted by right will still require site plan approval by Planning and Zoning Commission and the City Council. Strict adherence to the sign and architectural regulations of the Zoning Ordinance will be required. Page 2 of 2