Loading...
DRC commentsI DEVELOPMENT REVIEW COMMI~ ENGINEERING COMMENTS ITEM: S-1095, Baskin Robbins, zoning change from 12 (lig SUP (Light Industrial, Special Use Permit), to allow an ice-cream shop in the Valley Ranch Center located at the southeast comer of MacArthur Blvd. and Beitline Road, at the request of Gary Wells. DRC DATE: April 27, 1995 and May 4, 1995 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer 004-3679) COMMENT STATUS: ~' INITIAL ttI~FJ~tNAR4r FINAL I No Comments DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS S-1095. BasMn Robbins. zoning change from LI (light industrial) to LI- SUP (Light lndustria~ Special Use Permit), to allow an ice-cream shop in the Valley Ranch Center located at the sautheast corner of MacArthur Blvd. and Bel_t!!ne Road, at the request of Gary Wells. DRC DATE: April 27, 1995 and May 4, 1995 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer (304-3679) COMMENT STATUS: ~ ~MINARY I FtNA~ No Comments in the Valley Ranch Center located at the southeast comer of MacArthur Blvd. and Be!~i_~e Road, at the request of Gary Wells. DRC DATE: April 27, 1995 and May 4, 1995 CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer 00~-3679) COMMENT STATUS: IN!TLa..r~ ] PPegt~MtNAR-F ,/FINAL No Comments II,ELECTRIC Date Comments for the City of Coppell Development Review Committee Preliminary/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A/C / Heat Load) will be required from the developer before easements can be determined. / Other comments ~--~,~ ~ { ~' ~------ ./~/~ [ C.~,fd-~ ~,~ /~'7"- -~'/7'-,-~. Please call me at 214-888-1307 if you have any questions. Tim Brancheau 14400 Josey Lane Farmers Branch, Texas 75234 09:44 CITY OF COPPELL P.01 DEVELOPMENT REVIEW COMMFITEE DRC DATE: April27, 1995 CONTACT: JEFP 1. Any change in sprinkler system will require separate plan review by Fire Marshal. 2. Automatic fire sprinkler system will require hydrostatic test upon completion. 3. Provide fire extinguisher per NFPA standards. DEVELOPMENT REVIEW CO MITrEE BUILDING INSPECTION COMME~ BasMn - Robbins ' ~r~ DRC DATE: April 27, 1995 CONTACT: Greg Jones, Chief Building Official 004-3500) COMMENT STATUS: ~' INITIAL ppr'~_~.~?r~.~y 1. Sign exceeds 18 s. f. area allowed 2. Need current oarking tabulations - could exceed projected rmxinmm linfits of ~rking. drc4271 City of Coppell Development Review Committee Comments Planning Department S-1095, Baskin Robbins, Zoning Change from "LI" (Light Industrial) to "LI-S.U.P." (Light Industrial, Special Use Permit) DRC Date: April 27, 1995 Planning & Zoning Commission Meeting: City Council Meeting: June 13, 1995 May 18, 1995 (1) (2) Attached sign above the store front exceeds slightly the 18 sqnare feet maximum. (Sign Ordinance, Section 10-5-3: the sign area is limited to one square foot of sign area of each lineal foot of building frontage.) Show 13 designated parking spaces. There may be a shortage of available parking. Note: A. B. Staff written comments will be faxed to each applicant. Please revise plats, landscape plans, and utility plans based on staff recommendations provide reasons why our comments should not be followed when you attend the May 4, 1995 Development Review Committee (DRC) meeting. Each applicant will bring one new set of revised plats and plans to the May 4th DRC meeting. Applicants will be asked to show, explain and defend any revision. An Engineer for the project or other representative is urged to attend the meeting. Applicant will have till noon Tuesday, May 9th to resubmit twenty-eight (28) folded copies of revised plans, three (3) reduced paper copies and one (1) transparency of each exhibit to the Planning Department.