DRC commentsDate
FUELEC TRIC
Comments for the City of Coppell
Development Review Committee
p~olim~ ..... ,w4~] Plat
Preliminary/Final Plat is not acceptable.
Easements will be required for proposed electric facilities.
A plat with easement requirements will be provided to the
developer.
Load information (size of structure, A/C / Heat Load) will
be required from the developer before easements can be
determined.
/Ot e comments
/
Please call me at ~888-1307 if you have
any
questions.
Tim Brancheau
14400 Josey Lane Farmers Branch, Texas 75234
DEVELOPMENT REVIEW COMMITTEE
LEISURE SERVICES DEPARTMENT COMMENTS
S-1127, AFE Oil& Gas Consultants
DR(~ DATE:
February 27, 1997 and March 6, 1997
CONTACT:
R.D. SLAYTON, SUPERINTENDENT OF LEISURE SERVICES
972/304-3554 FAX 972/304-3547
COMMENT STATUS:
Leisure services has no comment.
~NITIAL
DEVELOPMENT RF VIEW COMMITTEE
ITEM:
DRC DATE: February 27, 1997
CONTACT: TP. AVI$ CRUMP, ACTING FIRE MARSHAL.
$-1127, AFE Oil & Gas Con~P~s · ·
f214) 304-3503
PI~ FIN~
Fire Lane required to be within 150 feet of all portions of struatures.
Fire Lane required to be installed and accepted by the City of C0ppell before drilling equipment
is brought to site.
Fire Hydrant required.
Need details on retention system.
Fire Lane to be platted.
Need Tank details.
Install fixed fire suppression monitors.
Need compatible on-site foam and equipment.
Fire suppression systems to be reviewed and approved by Fire Department before any drilling
or construction begins.
Emergency preparedness plan required to be submitted before construction or drilling begins.
DEVELOPMENT REVIEW COMMIITEE
BUILDING INSPECTION
DRC DATE: February 27, 1997
CONTACT: Greg Jones, Chief Building Offwial (304-31~00)
COMMENT STATUS: I ,~ INITIAL pp~'t.~p,r.~.p.y
I.mn~?.L
1. No Commenls.
e
dr227975
DEVELOPMENT REVIEW COMMI EE
ENGINEERING COMMENTS
ITEM:
S-1127. AFl? Oil & Gas Consultants , a zoning change from LI
(Light Industrial) to LI-S. U.P. (Light Industrial, Special Use Permit),
to allow the drilling and production of og and gas minerals on 42.48
acres of property, located approximate~ 390' south of Corporate
Park Blvd., along the west side of Copl~ell Road, at the request of
Sanford and Jason D~orin.
DRC DATE: February 27, 1997 and March 6, 1997
CONTACT: Mike Marlin, P.E., Assistant City Engineer 004-3679)
COMMENT STATUS:
· /PRELIMINARY
1. Provide information regarding access to the site.
2. A variance needs to be requested for proposed gravel road.
3. Provide dimension to existing 12" water line.
4. Show the existing easement for the 12" water line.
City of Coppell
Development Review Committee Comments
Plnnnin~ Department
S-1127 AFE Oil and Gas Consultants,
Zoning Change from "LI" to "LI-$.U.P."
DRC Date: February 27, 1997
Planning & Zoning Commission Meeting:
City Council Meeting: April 8, 1997
March 20, 1997
Unless a variance is granted, pavement is required to be:concrete. Show location of the
driveway between land leased and Sandy ! ~ke Road.
Remove "HC" Highway Commercial and "SF-7" Single Family reference below the
metes and bound description. Retain the adjacent zoning references on the drawing.
Correct the tank battery drawing to show that the name of Thweatt Road has been
changed to Sandy Lake Road.
Photenia is no longer a hardy plant species. Please substitute with Nellie R. Stevens
Holly.
5. Staff will recommend that any approval be subject to the first well becoming operational.
A reminder that the applicant will be responsible for obtaining a zoning change request
sign from the Planning Department and placing the sign on the property I0 days prior to
the Planning Commission hearing. There is a $100.00 deposit fee for the sign. (Fill out
attached form and remm to the Planning Department no later than Friday, March 7,
1997.)
Note:
A. Staff wrillen comments will be faxed to each applicant.
Please revise plats, landscape plans, and utility plans based on staff recommendations. Should
applicant disagree with staff comments please provide reasona why staff recommendations should
not be followed when you attend the Mareh 6th Development Review Committee (DRC)
meeting.
Each applicant will bring one new set of revised plats and plans to the March 6th DRC meeting.
Applicants will be asked to show, explain and defend any revision. An Engineer for the project
or other representative is urged to attend the meeting.
Applicant will have till noon Tuesday, Msun:h llth to resubmit twenty-eight (28) folded copies
of revised plans and three (3) reduced paper copies (8 1/2 X 11) of each exhibit to the Planning
Department.
2-28-1997 11:02AM FROM LSQ LE~[SVILLE 9723179690
Lone Star Gas Company
Prclim~ary/Final Plat For S-1127, A~E Oil & Gas ConSultantS
Date Reviewed 2=26-97
Comments:. No Co~ents i
For questions concerning these comments and/or natural gas service call:
Kevin Page - Lone Star Gas Co. - (972) 317-4421