Loading...
TU Electric comments'~'~ELECTRIC p~~y/Final Plat for Date Comments for the city of coppell Development Review Committee Preliminary/Final Plat is not acceptable. Easements will be required for proposed electric facilities. A plat with easement requirements will be provided to the developer. Load information (size of structure, A~C / Heat Load) will be required from the developer before easements can be determined. ~Other comments ~V 0~ ~- 6~O~{ ~ ~ ~ ~ ~"7 / Please call me at 214-888-1307 if you have any questions. Tim Brancheau 144{×) Josey Lane Fam~ers Branch, Texas 75234