Loading...
CC approval on 4/12/05AGENDA REQUEST FORM COPPELL DEPTf Planning DATl~: April 12, 2005 ITEMi#: 11 ITEM CAPTION: PUBLIC HEARING: Consider approval of Case No. PD-97R3-R, Comers of Coppell (Universal ~cademy), zoning change request from PD-97-R (Planned Development-97-Retail) to PD-97R3-R (Planned Devel~p_ment-97 Revision 3-Retail) to allow the occupancy of approximately 73,128-square-feet of the existing buildingi for Universal Academy (grades preK- 12th), and the occupancy of the remaining 41,475-square feet for college an~or retail uses, on 10.7 acres of property located at the southeast comer of Sandy Lake Road and Blvd. GOAL(S): APPROVED BY CITY COUNCIL ON ABOVE DATE EXECUTIVE SUMMARY: Date of P&Z Meeting: March 17, 2005 Decision of P&Z Commission: Approval (6-0) with Commi Foreman, Kittrell and Reese voting in favor. None opposed. Motio~ to close Public Hearing & subject to conditions 1, 6 below Jhy Vote ~ 5-0 York Sbsent Raine~ not in attendance for this item Borchgardt, Hall, McCaffrey, gent. Approval is 1) recommended, subject to the following conditions: Engineering Department review of the proposed circulation Patterns and directional signage prior to opening and during the operation of this school. thc .......... hal. (CONDITION MET) 3) The applicant re-evaluate the necessity of fencing in the future{ retail areas. 4) Provision of a letter from a registered structural engineer lproving the bridges/box culverts will support a vehicle weighing a minimum of 80,000 lbs. 6) Submission of details of the proposed attached signage, inc clarification that no monument sign is proposed for this tract. Staff recommends approval. uding color, font, size, location and a Agenda Request Form - Revised 09/04 Document Name: ~3PD-97R3-R CofC 1 -AR CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE NO.: PD-97R3-R, Corners of Coppell (Universal Academy) P & Z HEARING DATE: C.C. HEARING DATE: March 17, 2005 April 12, 2005 STAFF REP.: Marcie Diamond, Assistant Planni~lg Director LOCATION: Southeast corner Sandy Lake Road~ and MacArthur Blvd. SIZE OF AREA: 10.7 acres of property CURRENT ZONING: PD-97-R (Planned Development-97;Retail) REQUEST: PD-97R3-R (Planned Developmen~ 97 Revision 3-Retail) to allow the operation of a charter school anti college and/or retail uses within the existing 120,000 square foot unoccupied building. APPLICANT: HISTORY: Page 1 of 5 Karl Crawley Universal Academy Coppell, LLC Masterplan 700 /q. Pearl, Suite 1820 900 Jackson Street, Suite 640 DallaS, Texas 75201 Dallas, Texas 75202 (214) 397-0800 (214) 761-9197 FAX: (214) 397-0804 FAX: (214) 748-7114 In 1985, City Council approved a zoning change from a Multi- Family-2 district and a Retail district to PD-97 for retail uses on this property to allow the develol~ment of a 120,000-square-foot shopping center on 11.6 acres of land. The Final Plat for the Corners of Coppell Addition was approved in 1986, which encompasses the subject property as well as the out-lot (Lot 2) at the corner of Sandy Lake Road and! MacArthur Blvd. Item # 6 TRANSPORTATION: It appears that the shopping center changed ownership between 1986 and 1992. In 1992, the current owner, Blue Chip Partners, replatted the Corners of Coppell into three lots to allow for the marketing of the individual lots (b~tilding and parking) for office uses. Lot 2 was not included in this replatting activity. On January 13, 2003, the Planrdng and Zoning Commission recommended denial of a request to allow the construction of a 5,970-square-foot retail building with a dry cleaners on Lot 2 of the original PD. This request was denied due to lack of response from the applicant and issues relating to orientation, size, accessibility and design of the building. This recommendation for denial was not appealed to Council. Sandy Lake Road has recently been improved to a four-lane divided thoroughfare within 110 feet of right-of-way west of this property. The improvements to sandy Lake Road, adjacent to this property, are scheduled to start this quarter of 2005. MacArthur Boulevard is constructed as a four-lane divided thoroughfare with 110' of right-of-way which is sufficient to accommodate a six-lane divided roadway. SURROUNDING LAND USE & ZONING: North - Retail; C (Commercial) South -Wellington Place Apartments; MF-2 (Multi-Family-2) West -Single Family-Woodridge, Section ~5; PD-145 East- St. Joseph Village; PD-114-SF-'~ (Planned Development-ll4- Single Family-7) COMPREHENSIVE PLAN: The Comprehensive Plan slmws the property as suitable for neighborhood retail uses DISCUSSION: This property was developed almost 20 Years ago. The anchor grocery store tenant (Safeway) never occupied this building, and few retail leases that were entered into. Therefore, a majority of this property has remained unoccupied since its construction. This request is to allow Universal Academy, a Charter School, to occupy apl~roximately 64 % (73,128-square feet) of the exiting structure, including the anchor store area and lease spaces to the east. The remaining 41,475-square feet will be leased for retail uses and/or a college/university. There is sufficient parking to Item # 6 Page 2 of 5 Page 3 of 5 accommodate a variety of uses. Althoug~ the submitted Site/Landscape Plan does not meet all of the typical requirements for Site Plan approval, this is not new construction and the recoggition of existing conditions has been incorporated in this Site and Landscape Plan revision. Universal Academy Charter School will l~e relocating from the Town of Flower Mound to this location. This school is proposing to have an enrollment of approximately 700 -750 studgnts, and will provide: · 6 classrooms for Pre-K, · 24 classrooms for K-6~' · 6 classrooms for 7-9~ grades, · 6 classrooms for 10-12® grades, · gym/auditorium, · lunch room, and a · playground at the northeast corner of!the property. The hours of operation, will not exceed 6!:30 a.m. to 6:30 p.m. Monday through Friday and 6 a.m. until 7 p.m. og Saturdays. However, Saturday hours are rare and are usually in conjunction with a school function, i.e. graduation, etc. As part of the site improvements, the sch(}ol intends to construct a 6-foot wrought iron fence around the proposed playground area (currently a parking lot). It appears that the fence extel~ds along the frontages of Sandy Lake Road and MacArthur Boulevard. St~ff needs additional clarification as to the exact location of the fence and if it is proposed to cross frre lanes and driveways. If so, appropriate gates an[1 opticom systems will need to be installed and approved by the Fire M~shal. Staff is also concerned that this fencing would not be appropriate i(or practical) when the balance of the shopping center is occupied with retail and/college uses. Staff would like to encourage the occupancy of retail uses, and, therefore, recommends that the applicant reevaluate ~is proposed fencing. As noted above, the applicant intends to provide a playground in front of the eastern wing of the school, in an ares which is currently a concrete parking lot. They are indicating that they v~ill install some type of artificial turf over the concrete. The City does not inspect or permit playground equipment; therefore, a Certified Playgrodnd Inspector/Installer will need to be engaged. Also, ADA requirements will need to be met for this playground, as well as the entire school faOility. Access to this property will be via one driveway on MacArthur Boulevard and three on Sandy Lake Road. SpecifiCally, the parent drop-off route will be to enter the site via the western driveway and exiting the site at the Item # 6 middle driveway along Sandy Lake Road. Buses will access the site from MacArthur Blvd. and exit onto Sandy ~ke via the middle driveway, which will be served by a median opening. The Engineering Department has requested to review the proposed circulation patterns, including directional signage, during the initial operations of this school, especially due to the construction of the improveme*ts to Sandy Lake Road, which are scheduled to start this month. For the past several years there has beeg a concern over the structural integrity of the bridges over the drainage area, especially the center one, which will be served by a median open~g and will carry most of the traffic. As commented on by the Fire Marshal, the applicant will be required to obtain a report from a registered structural engineer certifying that these bridges/box culverts can support, at a minimum, an 80,000-pound vehicle. Although this property has been essentially unoccupied since construction, the buildings and grounds have been fairlyi well maintained. This property does not meet current landscape requirements; however, it is assumed that the property was in compliance when it was constructed. There are a significant number of mature trees and landscaping that will remain; however, dead plant materials and trees will need to be replaced. As indicated on the Site/Landscape Plan, the applicant intends to provide hedges to screen the parking lots from MacArthur Blvd. and Sandy Lake Road. A preliminary submission noted that 7-gallon Burford Hollies would be planted 36" apart for this required screening, although the most recent submission did not include this level of specificity. If this is still the intent of the applicant, this information needs to be added to the Site/Landscape Plan. The applicant has not submitted any information on the attached signage, except that it will be constructed over the main entrance of the school. Staff needs more information about this signage; i.e., color, size, etc., to assure compliance with the Sign Ordinance. The applicant also has stated that no monument sign will be needed. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends APPROVAL of PDi97R3-R, Corners of Coppell (Universal Academy), subject to the follo~ving conditions: Page 4 of 5 Item # 6 Engineering Department review of th~ proposed circulation patterns and directional signage during the operation of this school. Provision of additional clarification as to the exact location of the fence. If it will be crossing fire lan~s and driveways, appropriate gates and opticom systems will need ~o be installed and approved by the Fire Marshal. The applicant re-evaluate the necessity of fencing in the future retail areas. Provision of a letter from a registered structural engineer proving the bridges/box culverts will support a vehicle weighing a minimum of 80,000 lbs. Specification of the type of plat materials proposed for the "evergreen hedge" Submission of details of the proposed attached signage, including color, font, size, location and a clarification that no monument sign is proposed for this tract. ALTERNATIVES 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) Departmental Comments (Engineer, Fire Administration, Electric and Gas) 2) Site and Landscape Plan Page 5 of 5 Item# 6 COl'FELL Project ID PD-05-0004 Address 1001 E Sandy Lake Rd CiTY OF COPPELI 2nd DRC REPOR'F Project N~me COFFELL PD-g7R3, Corners of Coppell, Project Type Application Date Case ManaRer Proiect Description Re-Zoning PD 2/15/2005 Msrcie Diamond Zoning change request from PD-97-R (Planned Development-97) to PD-97R3-F~ (Planned Development-97 Revision 3-Retail) to allow the occupancy of approximately 73,128-square-feet of the exiting building for Universal Academy (grades K-I 2th), and the occupancy of the remaining 41,475-square feet for college and/or retail uses. Aqency Fire Administration Engineering Electric and Gas 1 of 1 Comments 1. Provide a letter from a registered structural engineer proving the bridges/box culver[s will support a minimum of 80,000 lbs vehicle. 1. The City will need to review the traffic plan. , 2. Sidewalk adjacent to Sandy Lake Rd. and MacAr~hur Blvd. should be 5' in width. 3. FDC's needs to be 1.5 x height of building away f~'om the bud ng on the same side of fire lane as F.H. within 50' of F.H. Zoning Change acceptable, please contact Larry R4dick at 972-323-8917 to discuss easement requirements,