Loading...
Eng. letter-Tree Survey & MitigGraham Associates, Inc. CONSULTING ENGINEERS & PLANNERS November 20, 2001 Ms. Andrea L. Roy City of Coppell Planning Department 255 Parkway Coppell, Texas 76010 RE: Fellowship Church - Fellowship Lakes Tree Survey & Mitigation Dear Ms. Roy: Fellowship Church, through their representatives, Graham Assodiates, Inc., Beck Construction, Beck Architecture, and Mesa Design Group met with the City of Coppell, Planning Department to discuss construction of the above referenced project on Monday, November 19, 2001. The purpose of the meeting was to discuss City requirements of tree rn~tigation and land platting. A complete tree inventory survey has been accomplished for the construction site and was presented to staffduring this meeting. The inventory survey demonstrated the areas impacted by the construction activities. The areas that have been deternlined to be exempt from tree mitigation are the lakes, dam, spillway, and the proposed soccer fields on the north side of Cottonwood Branch. The area determined to not be exempt of tree mitigation is the spoil site on the south side of Cottonwood Branch, north of Bass Pro-Bethel School Road. This area was chosen to receive earth spoil from the lake excavation because of minimal impact tO the trees on site, and because it is the future location of baseball, football, soccer, tennis courts, and basketball court areas. The topsoil in this area will be striped in advance of the spoil operation, and replaced over the top of the spoil to facilitate re-vegetation of the site. Mesa Design Group has been authorized to proceed with formal submittal of the tree survey, tree mitigation, Developmental Plan, and Landscape Plan to be processed through Planning and Zoning Commission at their earliest convenience. Graham Associates, Inc. has been working with Public Works to obtain approval of engineering construction documents since early July of this year. Graham Associates, Inc. also has been authorized to proceed with platting of the property, as required, during construction. Summit Oi~ice Park 1300 Summit Ave, Suite 419 Ft Worth, Texas 76102 1817) 332-5756 FAX 18171 336 6909 Centerpoint Two 616 Six Flags Drive, Suite 400 Arlington, Texas 76011 [817/649 8530 · Metro [817) 640-8535 FAX (8~ 7] 633-5240 Bank One 111 S. Garland Ave., Suite 202 Garland, Texas 75040 1972) 272-4655 FAX 19721 272-4655 This letter, on behalf of Fellowship Church, Graham Associates, Inc., Beck Construction, Beck Architecture, and Mesa Design Group, shall serve as your staff and Departmemal release and hold harmless for responsibility of terms and conditions placed on the above stated parties by the Planning and Zoning Commission and the City Council pursuant tO their review and approval of this project. We understand, proceeding with construction without Planning and Zoning Commission approval of thc Tree Mitigation Plan, is solely at our own risk. Your Departments will not be held liable for conditions of approval placed o~ Fellowship Church or it's representatives by the Commission. Federal and State agencies will be notified of construction activitieg as required. Should you have any questions or comments, please advise. Respectfully, Project Manager CC: Scott A. Dyer - City of Grapevine Ron Stombaugh - City of Grapevine Andrea L. Roy - City of Coppell Craig Stovall - Fellowship Church Brandon White - Fellowship Church Kendra Howell Beck Construction Jeff Forbes - Beck Construction James Worsham - Beck Architecture Ramon Villalba - Beck Architecture Chip Impastaito - Mesa Design Group Brad Goodman - Mesa Design Group