CC approval on 4/12/05AGENDA REQUEST FORM
COPPELL
DEPT! Planning
DATE: April 12, 2005
ITEM #: 15
ITEM CAPTION:
Consider approval of the Beltline Trade Center, Lot 1, Block 1, Minor Plat, to allow the development of an
approximate 375,000-square-foot warehouse distribution building on 27.072 acres of property located along the
north side of Beltline Road, approximately 1,000 feet east of North Lake Drive.
GOAL(S):
APPROVED BY
CITY COUNCIL
ON ABOVE DATE
Motion to Approve subject to
conditions I & 2 below
M - Suhy
S - Faught
Vote - 6-0 · ~,,.
York absent '~'~'
EXECUTIVE SUMMARY:
Date of P&Z Meeting: March 17, 2005
Decision of P&Z Commission: Approval (6-0) with Commissioners Borchgardt, Hall, McCaffrey,
Foreman, Kittrell and Reese voting in favor. None opposed. CommissiDner Milosevich was absent.
Approval is recommended, subject to the following conditions:
1) Contact JeffCurry at (972) 570-4126 to discuss easement requirements.
2) Engineering easement comments (attached)
Staff recommends approval.
Agenda Request Form - Revised 09/04 Document Name: ~7BLTC, MP !-AR
CITY OF COPPELL
PLANN1NG DEPARTMENT
STAFF REPORT
CASE: Beltline Trade Center, Lot Blk. Minor Plat
P & Z HEARING DATE:
C.C. HEARING DATE:
March 17, 2005
April 12, 2005
STAFF REP.:
Gary L. Sieb, Planning Director
LOCATION:
North side of Beltline Road, approximately 1,000 feet east of
North Lake Drive.
SIZE OF AREA:
27.072 acres of property
CURRENT ZONING:
LI (Light Industrial)
REQUEST:
Minor Plat approval to allow the development of a 375,000-square-
foot warehouse distribution building.
APPLICANT:
HISTORY:
Owner:
Industrial Dev. Intemational
5420 LBJ Freeway
Suite 1275
Dallas, TX 75240
(972) 546-2640
Fax: (972) 546-2650
Engineer:
Goodwin/Marshall, Inc.
Edward Eckart, P.E.
2405 Mustang Dr.
Grapevine, TX 76051
(817) 329-4373
Fax: (817) 329-4453
In October of 2000, City Council approved a Preliminary Plat and
a zoning change from LI (Light IndUstrial) to PD-189 to allow the
development of an indoor basketball/recreational facility (referred
to as "Hoop Town") on 17 acres of~is 27 acre site. In December
of that same year, Council approved an amendment to the PD to
enlarge the recreational site by allproximately .7 of an acre to
better address tree mitigation issues. The zoning was never legally
changed, the plat was never filed, and the project was never built.
Item # 12
Page 1 of 3
TRANSPORTATION:
Today, the property retains its Light Industrial zoning
classification.
Beltline Road is a P6D, six-lane divided thoroughfare built to
standard within a 120 foot right-of-O/ay.
SURROUNDING LAND USE & ZONING:
North - Railroad; Creekview Add.; LI (Light Industrial) & SF-9-PD-104
South - North Lake, City of Dallas
East - TXU Electric and Gas right-of-wa3~; LI (Light Industrial)
West - Vacant; LI (Light Industrial)
COMPREHENSIVE PLAN:
The Comprehensive Plan o4 May 1996 shows the property
as suitable for light industri~ll uses.
DISCUSSION:
This is a companion piece to the Site Plan r~view of Beltline Trade Center,
a 375,000-square-foot industrial building iproposal. By approving this
Minor Plat, development of the warehouse structure can proceed. Staff
can support this request with two conditions, one from TXU, one from
Engineering.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff recommends APPROVAL of this request, subject to the following
conditions:
1.
2.
Please contact Jeff Curry at (972) 570-4126 to discuss easement
requirements.
Engineering easement comments (attached)
ALTERNATIVES 1) Reconunend approval of the request
2) Recommend disapproval of the request
3) Recommend modification of the request
Page 2 of 3
Item # 12
ATTACHMENTS: 1) Minor Plat document
2) Departmental comments (Engineering)
Page 3 of 3
Item # 12
COl'FELL
Proiect ID MP-05-0008
Address E Belt Line Rd
CITY OF COPPELL
2nd DRC REPORT
Project N~ame
COl'FELL
Beltline Trade Center, Lot 1, Block 1
Proiect Type
Application Date
Case ManaRer
Proiect Description
Minor Plat
2/15/2005
Gary Sieb
To allow the development of an approximate 375,000-square-foot warehouse distribution building on 27.072 acres of
property.
Agency
Engineering
1 of 1
Comments
1. Coordinate easements to accommodate changes to tile proposed water line.
2. Will need easement for the sanitary sewer when it lea~es this site.
. Additional requirements may be identified during full engineering plan review.