DRC commentsCOPPELL ~roi~et ID Addmse fi B~lt tJn~ Rd CITY OF COPPELL DRC REPORT Project N~me COPPELL Beltline Trade Center, Lot 1, Block 1 Proiect TVDe Application Date Case Manaoer Prolect Descrloflon Site Plan Approval 2/15/2005 Gary Sieb To allow the development of an approximate 375,000-square-foot warehouse distribution building on 27.072 acres of property. Agency Building Inspection 1 of 3 Reviewed By Review Date Greg Jones 2/23/2005 Electric and Gas Jeff Curry 2/24/2005 Comments~ 1. 3 differient plan orientations have been submitted. Please standardize to make future review easier. Site Plan ~cceptable COFFELL Engineering Reviewed By Ken Griffin CITY OF COPPELL DRC REPORT Review Date 212412005 COFFELL Comment~ Preliminary Utility Layout: 1. Design!the private FL so there is no dead end. 2. Show k~cations of FDC. 3. Provid~ more detail of valves/connections. 4. Why is ~he 8" FL connecting to the building 3 times? 5. Why is ~he 10" FL going into then out of the pump room? 6. Meet a~equate distances between fire hydrants. 7. Is the cpnnection of the 24" and 10" water mains allowed, r~ecessary, preferred? Prelimina~ Storm Drain Layout 1. Include dra nage areas and pre minary drainage calculatio~hs including the retention pond. Prelimina~J Utility Layout 1. Loop th~ fire line around the building. 2. Show I¢cations of FDC. 3. Provid~ more detail of valves/connections. 4. Why is ~he 8" fire line connecting to the building 3 times? 5. Why is the 10" fire line going into then out of the pump roo~n? 6. Additional fire hydrants are needed to meet minimum t~pacing. 7. Overallidesign of water will be reviewed in greater detail durihg plan review. There may be another way to provideifire protection, etc. by tapping the 24" water line twice~in lieu of installing a parallel 10" water line. 8. You wil! need permission from DART to work within their ease~nent to install the 6" sanitary sewer. The northern s{ection of the 6" sanitary sewer should be an 8" sanita~ sewer so it could be used to provide service to the remiaining lot east of the railroad spur. Prelimina~ Storm Drain Layout 1. Includeldrainage areas and pre m nary dra nage calculations including the retention pond. . Additional requirements may be identified during full engineering plan review. Fire Administration Tim Oates 2/24/2005 1. Landscape plan shows 30' fire lane, other show 24'. 2. Indicatd fire lane turning radii (30' inside, 54' outside). 3. Show file hydrant and FDC locations on site plan. 4. FDC m~st be within 50' of a fire hydrant and on the same sidel of the fire lane. 5. Complete the loop of the fire line. 6. Buildin~ fire pump shall not pressurize the fire hydrant sybtem. COI 'I 'I LL Agency Parks and Recreation Planning Department Reviewed By John Elias Gary Sieb GITY OF GOPPELL DRC REPORT Review Date 2/22/2005 2/21/2005 COPPELL Comments 1, Tree mitigation calculations are incorrect. They are as follOWs: Total Prot(~cted Trees on site: 906"(DBH) Total Protected Trees Removed: 381"(DBH) Total Protected Trees Preserved: 525"(DBH) 58% Preservatipn Credit: 221" Landscap~ Credit: 217.5" No Retrib~jtion will be due. SITE PLAN 1. P easeld mens on monument sign. 2. Overall!sign cannot exceed 60 square feet (including !he end panel). 3. Does ybur "Provided Parking" total include "Future Parking" I~beled area? If so, indicate when future parking will be provided; no more than15 spaces w/o I.s. separ~ion. 4. DimenSion width and length of parking space, typically 17 by 9' or greater. 5. DimenSion space between fire lane and west property lifle. 6. Indicat.e acreage or square footage of open area behind bu~liding. 7. Provid~ spot elevations of railroad cross ties every 50 feet or ~so, where adjacent to Creekview Addition. 8. DimenSion trailer storage parking areas and show on Site Plan. 9. Beltlin~r Rd. is in Dallas at this location, any median all~erations must be approved by the City of Dallas. LANDSC,~PE PLAN 1. Orient ~_.S· Plan and Site Plan in same direction (Plan North is typically at top of drawing) 2. DimenSion minimum, average, and maximum height of ~.11 berms. 3. Previd~ section through berms showing how they screen pa~king. ELEVATI(~NS 1~ Any pa~rt of structure visible from public row must have artic(ulation every 100 feet or less, Please revise elevations~/perspectives to reflect this requirement· 2, Color ~oard is required for this project· 3. Pleaselprovide detailed floorplan of building as well as section showing screening of any mechanical equipment to be placed on roof· PERSPECTIVE DRAWING 1. Ind~cat? from where perspective drawings are taken. 2· See cojmment #1 ELEVATIONS, above. T tl £ ~ ~ I T T , g I~ COFFELL Proiect ID MP-05-0008 Address E Belt Line Rd CITY OF COPPELL DRC REPORT Prolect N~me COl'FELL Belffine Trade Center, Lot 1, Block 1 ProiectTvne Application Date Case Manaaer ProiectDescrintion Minor Plat 2/15/2005 Gary Sieb To allow the development of an approximate 375,000-square-foot warehouse distribution building on 27.072 acres of property. Agency Building Inspection Electric and Gas 1 of 1 Reviewed By Review Date Greg Jones 2/23/2005 Jeff Curry 2/24/2005 Engineering Ken Griffin 2/24/2005 Commentsi 1. No pla~ing comments made· Plat UnacCeptable, please contact Jeff Curry at 972-570-~126 to discuss easement requirements. 1. Coordir~ate easements to accommodate changes to the proposed water line. 2· Show C~ity of Coppell and City of Dallas city limits. 3. Will ne~d easement for the sanitary sewer when it leaves this site. Fire Administration Tim Oates 2/24/2005 Parks and Recreation John Elias 2/22/2005 Planning Department Gary Sieb 2/22/2005 · Additional requirements may be identified during full engineerihg plan review. 1. No conlment No comments. 1. Final Plat needs to change to Minor Plat throughou~ this document. 2. Note #~ change "tin" to "lie". 3· Please!review City of Coppell Subdivision Regulatior~s for signature statements needed for Plat approval. 4. Remoqe "Preliminary,.." comment from Surveyor's Certificate[ 5. Indicat~ row of railroad property. MEMORANDUM FEB 2 4 2005 To: Marcie Diamond From: Jeff Curry Date: l:ebraary 24, 2005 Subject: March DRC PD-199R2-HC, Vista Point II, Lot 5, Block A (Bank of Texas) - Zoning Change Acceptable Vista Point II, Lot 5, Block A Replat - Plat Unacceptable, please contact Larry Rcdick at 972-323-8917 to discuss electric easement requirements. Also, please change the signature block to read TXU Electric Delivery Company. S.1211R, Service Star - Zoning Change Acceptable, please contact Larry Redick at 972-323-8917 to discuss electric service requirements. PD-97R3-R, Corners of Coppell - Zoning Change Acceptable, please contact Larry Redick at 972-323-8917 to discnss electric service requirements. Wynnpage Plaza North, Lot 2, Block B, Site Plan - Site Plan Acceptable Wynnpage Plaza North, Lot 2, Block B, Final Plat - Plat Utlacceptable, please contact Larry Redick to discuss electric easement requirements. Also. please change the signature block to read TXU Electric Delivery Company and add a line for Atmos Energy. Beltline Trade Center, Lot 1, Block 1, Site Plan - Site Plan Acceptable Beltline Trade Center, Lot 1, Block 1, Minor Plat - Plat Unacceptable. please contact Jeff Curry at 972-570-4126 to discuss electric easement requirements. Park West Commerce Center, Lot 2R-3, Block 2, Site Plan - Site Plan Acceptable Park West Con~-nerce Center, Lot 2R-3, Block 2, Replat - plat Unacceptable. please contact left Curry at 972-570-4126 to discuss electric easement requirements.