Loading...
CC approvall on 4/12/05AGENDA REQUEST FORM COl'FELL DEPT: Planning DATEi April 12, 2005 ITEM fi: 9 ITEM CAPTION: PUBLIC HEARING: Consider approval of Case No. PD-199R2-HC, Vista Point Ii, Lot 5R, Block A (Bank of Texas), zoning change request from PD-199-HC (Planned Development-199-Highway Commercial) to PD-I99R2-HC (Planned Development-199 Revision 2-Highway Commercial) to allow the development of an approximate 5,585-square- foot bank facility, with drive-through lanes, on 1.25 acres of property locate~ along the west side of MacArthur Blvd., south of S.H. 121. Motion tO close Public Hearing & Approve subject to condilJons 2 & 4 below and direct staffto write to the Mayer & Counc~ & anyone else with the City of Lewisvilla to notify them of concerns regarding the GOAL(S): deceleration lane M- Faught * Libby Ball S - Suhy ~_j[ 200s.o4 20 o5'00' EXECUTIVE SUMMARY: Vote - 5-0 York absent Date of P&Z Meeting: March 17, 2005 Raines 13ot present for this item Decision of P&Z Commission: Approval (6-0) with Commissioners ~orchgardt, Hall, McCaffrey, Foreman, Kittrell and Reese voting in favor. None opposed. Commissiener Milosevich was absent. APPROVED BY CITY COUNCIL ON ABOVE DATE Approval is recommended, subject to the following conditions: Red Tip.r~u~';-:..v_...a. (CONDITION MET) 2) Prior to the issuance of a Certificate of Occupancy for this bank, either the fire lane on Lot 2, adjacent to this site, or a hammerhead (mm-around) on the northern fire lane shall be constructed, as approved by the Fire Marshal. 4) Submission of a letter from the City of Lewisville approving the deceleration lanes adjacent to this site and/or related issues. MET) Staff recommends approval. Agenda Request Form - Revised 09/04 Document Name: ~IPD-199R2-HC, BofrX i-AR CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE NO.: PD-199R2-HC, Vista Point ~I~ Lot 5R~ Blk. A (Bank of Texas_) P & Z HEARING DATE: C.C. HEARING DATE: March 17, 2005 April 12, 2005 STAFF REP.: Marcie Diamond, Assistant Planning Director LOCATION: West side of MacArthur Blvd., south of S.H. 121 SIZE OF AREA: 1.25 acres of property CURRENT ZON1NG: PD- 199-HC (Planned Development- li99-Highway Commercial) REQUEST: PD-199R2-HC (Planned Development-199 Revision 2-Highway Commercial) to allow the development of a 5,500 square foot bank facility, with 5 drive-through lanes. APPLICANT: HISTORY: Ples E. Schnitz Jr. Schnitz & Sewell 333 West Campbell Rd., #355 Richardson, Texas 75229 (972) 437-9844 FAX: (972) 907-9975 Neil Brennan, VP Bank of Texas 2650 Royal Lane Dallas, Texas 75080 (972) 443-2878 (972) 443-2845 The subject property is part of Lot 3, Block G, a 49.20-acre tract within the Vista Ridge Addition. Ttle property lies within Denton County and was originally part of the City of Lewisville when recorded in September of 1986. :Since that time, the City of Coppell has annexed this and other portions of the Vista Ridge Business Park. Page 1 of 5 Item # 4 TRANSPORTATION: In September 1999, a request for a PD for a gas station, convenience store and car wash on 1.5 acres at the southwest corner of S.H. 121 and MacArthur! Boulevard was recommended for denial by staff. Due to this ~ecommendation, the applicant requested a postponement until December of that year to allow for a redesign of the site plan and elevations to address staff design concerns, but staff still strongly opposed the use at this location. On December 16, 1999, the Planning and Zoning Commission recommended denial of this request, and it was not appealed to Council. In September 2001, Council approved a Site Plan and Final Plat to allow for the construction of a one-~tory, 71,000-square-foot office building on seven acres of this 26~acre parcel of land. The Site Plan would have expired on September 11, 2003; however, on September 9, 2003, Council approved a six-month extension. The approved Site Plan expired in March 2004. On April 13, 2004, Council overrul~d staff's and the Planning and Zoning Commission's recommendation for denial and approved a Concept Planned Development tO allow the construction of 210,000-square feet of office/war0house/assembly buildings and five retail pad sites. In August 200g, Council approved the Detail Plan for the first phase of this development, consisting of three buildings, totaling 93,550-square feet. This first phase of development is currently under construction. Also approved in April of last year was S-1211 for a gas station and car repair on Lot 4 of this I~D. This Special Use Permit expired in October of last year, and resubmission of this SUP is expected to be considered by the planning and Zoning Commission next month. S.H. 121 is under construction to freeway standards with access roads, within 450 feet of right-of-way. MacArthur Blvd., adjacent to this property, is a six-lane divided thoroughfare in the City of Lewisville. SURROUNDING LAND USE & ZONING: North - S.H. 121, City of Lewisvill¢ South - PD-132-SF-9, The Peninsulhs of Coppell, and PD-149-SF- 7, Vistas of Coppell Item # 4 Page 2 of 5 East - PD-202-TH-1 (Villas of Lake Vista) and office park; LI (Light Industrial), City of Le~isville West - Vistas of Coppell, PD-149-SF-7 (Single-Family) DISCUSSION: As discussed in the HISTORY section, this property was zoned in April of last year as part of a PD for Highway Commercial uses. This request is to amend the PD to attach a Detail Site Plan to allow the construction of a 5,580-square~foot bank facility with five drive-through lanes, with sufficient service/queuing area for a total of 30 cars. There will be 27 parking spaces, which exceeds the office ratio of one space per 300-square feet of floor area by eight spaces. The bnilding is oriented at an angle toward the northeast corner of the site, providing for an aesthetic entry feature with plaza, stone wall, planter and flhgpole. The Landscape Plan is in compliance with the provisions of the PD, which allows, in part, for variances to the 10 feet 6f perimeter landscape required adjacent to the internal lot lines. This plan, however, exceeds the expectations of the Concept Plan in terms Of exceeding all other levels of landscaping, as well as preserving matUre trees along MacArthur Boulevard. The Concept Plan indicated ~at all but three of the trees would be removed from this site. This proposed Landscape Plan includes a 40+ foot-wide landscape buffer along MacArthur Blvd., allowing for the preservation of seven trees (a total of 72-caliper inches of Live Oak and Cedar Elm trees), while only removing two Cedar Elms to allow for driveways into the property. One minor revision is needed to the Landscape Plan, that being the screening of a 10'xl0' power transformer pad proposed along the western property line. The applicant revised the plans to indicate large shrubs; however, the plant material selected (Red Tip Photinla) is not on our Plant Palette. A shrub from our plant list will need to be substituted. This property will be accessed from two mt~tual access (shared) driveways from MacArthur Blvd. The Coppell/LewiSville mutual city limit line is located along the western right-of-way li~e of MacArthur Blvd.; and therefore, the City of Lewisville has fma! authority on the design and location of the deceleration lanes within their rights-of-way. It is staff's understanding that the City of Lewisville haS yet to approve these designs. (This is actually an outstanding condition frOm the original PD approved a year ago). A related issue is the location of the southern driveway in relation to Lake Vista Drive, which is also in the City of Lewisville. As noted in the aUached comments from the Engineering Department, this proposed Item # 4 Page 3 of 5 driveway is slightly offset from Lake Vista Drive. Because of safety considerations, it is recommended that this driveway align with Lake Vista Drive. A companion request is the replatting of thhs lot to relocate the north/south fire lane from behind the building to the front of the building to allow for the drive-through facility in the rear. TO assure that all parts of the building, including the drive-through lanes, are within 150 feet of a fire lane, either the fire lane proposed (and platted) on Lot 2, adjacent to this site, needs to be constructed, or a hammer-head (mm-mound) will be required on the northern fire lane into the Service Star lot, as shown on the Site Plan. Given that both of these fire lalaes have been included as fire lane easements on the Final Plat for this property, the paving of either, prior to the Certificate of Occupancy being issued for the bank, will be required. The Concept Plan for this PD also included concept elevations and preliminary building material selection for this entire 19-acre property. The intent was to utilize the same color and material palette on the entire project so that this property would appear to be a master planned area. However, the industrial nature of the developments on Lots 1 and 2 required approval of certain elements of the building (i.e., flat rooflines, metal canopies, light colored brick and stone to be compatible with the tilt-wall, etc.), which are normally not appropriate for retail developments. The building materials proposed for this bank are more retail in nature. There is a combination of two types of lime stone veneers, Leuders Limestone as the main building material, and a West Texas Limestone as an accent material for the columns. The slate gray standing seam metal roof will also be a predominate feature of this building and will be extended to cover the drive-through facility. These materials are darker in nature and are much more attractive than the "hot" colors of the warehouse buildings. It is expected that the remaining retail lots along MacArthur Blvd. will have similar materials and architectural characteristics of this first retail building, instead of the industrial materials of the buildings west of this project. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends APPROVAL of PD-199R2-HC, Vista Poim II, Lot 5R, Blk. A (Bank of Texas), subject to the following conditions: 1. The submission of revised the Landscape Plan substituting a plato from the City's Plant Palette for the Red Tip Photinia. Item # 4 Page 4 of 5 Prior to the issuance of a Certificate of Occupancy for this bank, either the fire lane on Lot 2, adjacent to this site, or a hammer-head (turn-around) on the northern fire lane shall be constructed, as approved by the Fire Marshal. The submission of a revised Site Plan and Landscape Plan, indicating the realignment of the southern driveway to align witll Lake Vista Drive. Submission of a letter from the City of Lewisville approving the deceleration lanes adjacent to this site and/or related issues. Correction of the City Limit Line between Coppell and Lewisville on the Site Plan. ALTERNATIVES 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later ~late. ATTACHMENTS: 1) Departmental Comments 2) Site Plan 3) Landscape Plan 4) Elevations Page 5 of 5 Item # 4 COPPELL Project ID RP-05-0002 Address State Highway 12f CITY OF COPPEL[ 2nd DRC REPORT COPPELL Vista Point II (Bank of Texas) Project Type Application Date Case Manager Project Description Replat 2/15/2005 Marcie Diamond to revise the location of the fire lanes to allow the development of an approxim ~te 5,585 square foot bank facility, with drive through lanes Aqency Engineering Electric and Gas 1 of 1 Comments Plat: 1. There is not an offset in the City Limits between oppell and the northeast corner. LewJsville as you show aIong Site Plan: 1. The proposed access on the south side of the pr Because of safety considerations please align this 2. It's my understanding that the City of Lewisville this site. Has the site plan been revised to reflect requirements? Utility Plan: 1. Be sure utilities shown on these plans coordinat~ 2. Provide proof of permission from adjacent prope water line stub outs and fire hydrants. 3. Need to provide proof of a property owners asso drainage systems. They cross several property line association, then most of these utilities will need to 4. Explain the reasoning for the configuration of th, property. · The offsite utility and paving work to support this receiving any permits for the development. )perty is not aligned with Lake Vista Drive· tccess with Lake Vista Drive. tay require deceleration lanes adjacent to of Lewisville's concerns, issues and/or with proposed utilities by Pacheco Koch / owners to work offsite and to install ation to maintain the water, sewer and ~. If there is not proof of property owners be in a 20' utility easement. water line at the northwest corner of the roject needs to be submitted prior to Plat Unacceptable, please contact Larry Redick requirements. Also, please change the signature b at ! ~72-323-8917 to discuss easement ock to read TXU Electric Delivery Company '$VX31:10 ~NVB ~f