DRC commentsCOPPELL
Proiect ID ~D-0§-000~
Address State Highway t2t
CITY OF COPPELL
DRC REPORT
Proiect N~me
COPPELL
PD-199-HCR2, Vista Point II (Bank of Texas)
ProlectType
Appllca~on Date
Case Manaaer
ProiectDescHotion
Re-Zoning PD
2/15/2005
Marcie Diamond
Zoning change request from PD-199-HC (Planned Development-199-Highway C~mmercial to PD-199-HC-R2 (Planned
Development-199-Highway Commercial-Revision 2) to allow the development of~an'~l~- approximate 5,585 square foot bank
facility, with drive through lanes.
Agency
Building Inspection
1 of 1
Reviewed By Review Date
Greg Jones 2/22/2005
Electric and Gas Jeff Curry 2/24/2005
Engineering Ken Griffin 2/24/2005
Fire Administration Tim Oates 2/24/2005
Parks and Recreation
Planning Department
John Elias 2/22/2005
Marcie Diamond 2/23/2005
1. No floc~r plan information submitted for review.
Unable to!make comments.
Zoning Cl~ange Acceptable.
See comr~ents under Replat / Project ID# RP-05-0002.
1, Fire hy(~rants shall be located every 300'.
2. Proposed FDC line shall not run under building.
3. Proposed Fire Hydrant along Mac. to be relocated to
S. drive.
4. Proposed Fire Hydrant and FDC must be 3'-6' from
back of c~rb.
5. Fire sprinkler room shall be directly accessible from
the exterior.
No comm
SITE PLA
1. Delete
all easem
2. The
are typic;
3. The ligl
coordinat,
4. Indical
5. Drivew
be appro~
6. Includ~
side of IV
;nts
he utility lines from the site plan, but retain
.~nts, as applicable.
LJ transformer, needs to be screened. Shrubs
Ily used as a screening devise.
~t standards (parking lot lights) need to be
~for all developments of within this PD.
~ R.O.W. for Lake Vista Drive.
~y location and deceleration lane needs to
ed by the City of Lewisville.
the existing zoning designations on the east
)cArthur Blvd.
LANDSCAPE PLAN
1. The TX~.J transformer, needs to be screened. Shrubs
are typically used as a screening devise.
2. Revise~the Landscape Planting Schedule, under
descriptioN to indicate existing trees as existing instead
of proposed.
ELEVATIONS
1. The m~terials and colors of the exterior finishes and
the standing seam metal roof need to be in
complian(~e with the color board and materials
approvedlfor this PD.
2. Cedar ~rellis not appropriate.
COPPELL
~roioct ID R~-0§-0002
Address State Hi0hw*¥ 12~
CITY OF COPPELL
DRC REPORT
Project Nqme
COPPELL
Vista Point II (Bank of Texas)
Proiect TvDe
Aoolication Date
Case Maoaoer
Prolect Descriotion
Replat
2/15~2005
Marcie Diamond
to revise the location of the fire lanes to allow the development of an approximate 5,585 square foot bank facility, with
ddve through lanes.
Building Inspection
Electric and Gas
1 of 2
Reviewed By Review Date
Greg Jones 212212005
Jeff Curry 2/24/2005
Engineering Ken Griffin 2/24/2005
1. No comments made on replat.
Plat Unacceptable, please contact Larry Redick at
972-323-8917 to discuss easement requirements. Also,
please change the signature block to read TXU
Electric Delivery Company.
Plat:
1. If the 12" water line along MacArthur is as shown on
the site plan, a 20' utility easement centered on the
water line in needed.
2. Show the Coppell/LewisviIle City Limits on this
sheet.
Site Plan:
1. The monument sign must be moved out of the
proposed 20' utility easement required for the 12"
water line,
2. New sidewalk shall be 5'-0" wide instead of 4'-0".
3. Show tlhe curb line for Lake Vista Drive on this
drawing. Does the proposed south driveway align with
Lake vista?
4. Is a left!turn lane proposed for the south driveway?
5. Whether a car or truck can safely make a left turn
from the South proposed driveway is unclear due to the
northern median nose encroaching into the radius of
the driveWay.
6. It's my understanding that the City of Lewisville may
require deceleration lanes adjacent to this site. Has
the site plan been revised to reflect all of Lewisville's
concerns, issues and/or requirements?
Utility Plal~:
1. The water line stub out shown to end under the
dumpster must be extended outside the limits of
concrete.
2. Show existing storm sewer piping on the drawing.
3. Design:the private fire line so there is no dead end.
4. The proposed location of the fire vault is too close
to tree ET-8.
5. Tap the 12" water line only once and run both
irrigation and domestic water off that tap.
6. Provide proof of permission from adjacent property
owners to work offsite and to install water line stub outs
and fire hydrants.
COFFELL
Agency
Fire Administration
Parks and Recreation
Planning Department
Reviewed By
Tim Oates
John Elias
Marcie Diamond
CITY OF COPPELL
DRC REPORT
Review Date
COFFELL
Comments
7. Is the 8" Sanitary Sewer Line "SS-I" public?
8. Explain~the reasoning for the configuration of the
water line at the northwest corner of the property.
Grading I~lan:
1. Provide more elevation information along the
eastern pertion of the property so that flow may be
determined. All water must be picked up on site.
Erosion Control Plan:
1. Providq inlet protection at all inlets on the site.
2. Note that all erosion control notes and details shall
conform te TCEQ regulations.
Erosion COntrol Details:
1. StabilizEd Construction Entrance Detail shall match
corresponding Notes. (Is the minimum thickness 6" or
8"?)
- The offslte utility and paving work to support this
project needs to be submitted prior to receiving any
permits for the development.
2/24/2005
Utility: 1. Fire Hydrants required every 300' for
commerci~bl sites.
2. Relocate fire hydrant on Mac. to south driveway.
3. Fire hyarants and FDC must be 3'-6' from fire lane.
Plat: 1. Er~tire Fire Lane/Mutual Access easement must
be installed prior to building construction.
2/22/2005
2/23/2005
No comments
1. TXU's Current name is TXU Electric Delivery
Company~ revise proposed easements and signature
block accOrdingly.
2. Change the Title of the plat from Final Plat to
Replat.
MEMORANDUM
To: Marcie Diamond
From: Jeff Curry
Date: February 24, 2005
Subject: March DRC
PD-199R2-ttC, Vista Point II, Lot 5, Block A (Bank o! Texa~) - Zoning Change
Acceptable
Vista Point Il, Lot 5, Block A Replat - Plat Unacceptable, plqase contact Larry Redick
at 972-323-8917 to discuss electric easement requirements. Al~o, please change thc
signature block to read TXU Electric Delivery Company.
S,1211R, Service Star - Zoning Change Acceptable. please contact Larry Redick at
972-323-8917 to discuss electric service requirements.
PD-97R3-R, Corners of Coppell - Zoning Change Acceptable, please contact Larry
Redick at 972-323-8917 to discuss electric service requirementS.
Wynnpage Plaza North, Lot 2, Block B, Site Plan - Site Pla0 Acceptable
Wynnpage Plaza North, Lot 2, Block B, Final Plat - Plat Unacceptable, please contact
Larry Redick to discuss electric easement reqairements. Also,iplease change the
signature block to read TXU Electric Delivery Company and add a line for Atmos
Energy.
Beltline Trade Center, Lot 1, Block 1, Site Plan - Site Plan Acceptable
Beltline Trade Center, Lot l, Block 1, Minor Plat - plat Unacceptable, please contact
Jeff Curry at 972-570-4126 to discuss electric easement'requiflements.
Park West Commerce Center, Lot 2R-3, Block 2, Site Plat~ - Site Plan Acceptable
Park West Commerce Center, Lot 2R-3, Block 2, Replat'-!Plat Unacceptable. please
contact Jeff Curry at 972-570-4126 to discuss electric easement reqmtements.