P&Z letter of denial 3/17/05March 18, 2005
T H £ C I T Y 0 F
COl'FELL
Mr. James Gaddy
Majestic Realty Co.
5000 Quorum Drive
Suite 100
Dallas, TX 75254
RE: Park West Commerce Center~ Lot 2R-3~ Block 2~ Replu~
Dear Mr. Gaddy:
This letter is to inform you that the Park West Commerce Center, lqot 2R-3, Block 2, Replat, being
a replat of Park West Commerce Center, Lot 2R-2, Block 2, to allow the development of t~'o office
warehouse buildings (13T00-square-feet and 153,000-square-feet, respectively), on 16.8 acres of
property located at the northwest comer of Beltline and Airline Ro~ds, was denied by the Coppell
Planning and Zoning Commission on Thursday, March 17, 2005. Twelve copies of this Replat,
addressing the tbllowing conditions, may be resubmitted by 12 noon, Tuesday, April 12m, for
consideration by the Commission on April 21, 2005; no additional f~e will be required.
1) Delete "proposed" from the easement note connecting this property to
property to the north.
2) Abide by Engineering's comments including those relative to a 30-foot
utility/drainage easement (see attached Engineering comment).
If you have any questions, please contact the Planning Department at (972) 304-3678.
Sincerely,
Assistant Director of Planning
Cc Kyle McCullah, Hardy McCullah/MLM
Building Inspection
file ~
CiTY OF COPP 'LL
2nd DRC REPORT
CO1P?ELE
Proiect ID RP-05-O0!0
Address Arlne Dr
Project Name
Project Type
~plication Date
Case Manager
Proiect Description
Replat
2 16,20C5
Gary S~eb
To allow the decelopment of two office warehouse buildings 137.00 squaredeet;and 153 000-square feet on 16 8 acres
of property
Engir eerlr, g
1 of
Comments
1 Provide a "mutual access easement", not a "Proposed" MAE.
2 Only 10 foot of the 20 foot Utility and Drainage Easement dedicated by Volume 90218, page
3264 can be abandoned There still must be a min~mum ;~0 foot Utility and Drainage Easement
centered over the existing 72"RCP The 30 foot easement is shown on SheetA-10and
should be shown on the plat
3 Is easement for fire hydrant lead on noflh side of properly? Also, fire hydrant is too dose to
building