Memo re changes to planMEMORANDUM
HARDY McCULLAH/MLM ARCHITECTS, INC.
· To Gary Sieb
· Project Parkwest
· Re: Drawing Changes
· From Kyle McCullah
· Date:
March 8, 2005
File
· Distribution:
1. Moved North screen walt per request of Ken Griffia, 15' o/c line away from easement.
The easement is a total 30'-0".
2. Confirm height of screen wall for both buildings at 10'-0" f.f. height. This will screen
the dock doors from adjacent property.
The north screening wall will match £.f. height of Building "A" at 519'. The height of
screen wall will be 10'-0" above this finished floor height to match screen wall height
for continuity with the north elevation.
4. Removed right hand turn lanes from Beltline Road~
Kyle McCullah
· 12221 Merit Drive
Suite 280
Dallas, TX 75251
Phone: 972-885-1900
Fax: 972-385-1937
hardy [ ~airmail net
· Fort Worth Office
Metro: 817-577-1270
F \WPDOCS O5hMAJES [ 1C/250503/SIEB3 SM