Loading...
Applic. memo re drawing changesMEMORANDUM HARDY McCULLAH/MLM ARCHITECTS, INC. · lo I Gary Sieb · Project [ Parkwest · Re Drawing Changes Kyle McCullah March 8. 2005 File Gary, 1. Moved North screen wall per request of Ken Griffin, 15' o/c line away from easement. The easement is a total 30'-0". 2. Confirm height of screen wall for both buildings at 10'-0" f.f. height. This will screen the dock doors from adjacent property. 3. The north screening wall will match f.f. height of B,~ilding "A" at 519'. The height of screen wall will be 10'-0" above this finished floor height to match screen wall hcight for continuity with the north elevation. 4. Removed right hand turn lanes from Beltline Road. Kyle McCullah Dallas IX 752>I Phone 972 385-t900 }:ax 972-385 1937