Applic. memo re drawing changesMEMORANDUM
HARDY McCULLAH/MLM ARCHITECTS, INC.
· lo I Gary Sieb
· Project [ Parkwest
· Re Drawing Changes
Kyle McCullah
March 8. 2005
File
Gary,
1. Moved North screen wall per request of Ken Griffin, 15' o/c line away from easement.
The easement is a total 30'-0".
2. Confirm height of screen wall for both buildings at 10'-0" f.f. height. This will screen
the dock doors from adjacent property.
3. The north screening wall will match f.f. height of B,~ilding "A" at 519'. The height of
screen wall will be 10'-0" above this finished floor height to match screen wall hcight
for continuity with the north elevation.
4. Removed right hand turn lanes from Beltline Road.