P&Z letter of approval 4/21/05Mr. Jim Gaspard
Transwestem Commercial Services
5001 Spring Valley Road, Suite 600W
Dallas, TX 75244
RE: PD-194R3-LI~ Amberpoint Business Park~ Lot 2R~ Block A
Dear Jim:
This letter is to inform you that Case No. PD-194R3-LI, Amberpoint Bt
change request from PD-194R2~LI, (Planned Development-194 Revisio
(Planned Development-194 Revision 3-Light Industrial) to amend the Plato
Plan to allow the development of three office/warehouse buildings, totaling
64.3 acres of property located along the south side of Sandy Lake Road, bel
Drive, was recorranended for approval by the Coppell Planning and Zoni~
2005, subject to the following conditions:
1) Revise Elevations to show the screen walls located on the we
the east elevation for Building 6 as shown on the Site Plan.
2) Enhance the north elevation for Building 6 to include articul~
requirement of the Zoning Ordinance.
3)
Note on plans that the southeastern drive will not be used un
improved. Submit proposed barricade, and indicate that a he
upon tie-in. This headache bar can be removed upon the con
Parkway extension from Sandy Lake Road to S.H. 121.
4) Revise perimeter landscape numbers to read 1,872' in place
frontage.
5) Revise the Sandy Lake perimeter landscaping to read 35 tree:
being a Primary Image Zone and it requiring one tree per 40'
6) Comply with the attached Engineering and Fire Department
April 22, 2005
siness Park, Lot 2R, Block A, zoning
~ 2-Light Industrial) to PD-194R3-LI
led Development to attach a Detail Site
approximately 714,010-square feet, on
ween Freeport Parkway and Northpoint
g Commission on Thursday, April 21,
st elevation for Building 5 and
[tion in the center to meet the
il Freeport Parkway is
~dache bar will be installed
fletion of the Freeport
' 11,872' for the east Freeport
This is due to Sandy Lake
)mments.
The date scheduled for consideration by the Coppell City Council is Tuesday, May 10, 2005, at 7 p.m. A
representative for this case must be present at this meeting, which will be held in Council Chambers at City Hall·
Failure to represent this item may result in the denial of this application. City Council has instructed staff to
include in its agenda packets only those items that accurately reflect conditions as reconunended by the Planning
and Zoning Commission. Therefore, please submit to the Planning Delmrtment three (3) folded copies of all
revised plans on or before 12 noon~ Wednesday~ April 27~h. Also, please submit one (1) 8 V2 x 1I paper
reduction, along with one jpg, tiff, pdf or similar electronic file.
If you have any questions, please contact the Planning Department at (972) 304-3678.
Sincerely,
Marcie Di~hnond
Assistant Director of Planning
Attachment
Cc JohnO'Brien, O'Brien & Associates
Mark McGraw, Halff Associates, Inc.
Building Inspection
O?PELL
Pr~oiect ID_ PO~:~Om ~
CITY OF COPPr:LLi
2nd DRC REPORT!
PrOfect
COPPELL
Pro~ect Type
Application Date
Case Manaqe~
Profe~t De.~cri~4Jon
Re-Zomng PD
3/23/20O5
Matt Stee~
To altow the developme~! of three offlceNcarehou~,e b~ildlngS, totaling apfxoxlmatety ~14,010-s~uare feel, ~ 643 acres
of property
A~qenc¥
Fire Administration
Engineering
I of 1
Comments
1. Fire hydrants must be located outside the collapseizone of the buildings (1.5 X building
height)
1. The driveways along NorthPO~nt Drive will be reviewed in further detail during the
Engineering plan review.
Additional comments may be generated upon detailed Engineering review.