DRC commentsCOPPELL Project ID PD-05-0011 Address W Sandy Lake C (T¥ O¢' CO(DP(ELL DRC REPORT Project N~me COl'FELL PD-194R3-Amberpoint Business Park Project Type Application Date Case Mana,qer Project Description Agency Building Inspection Electric and Gas Engineering Re-Zoning PD 3/23/2005 Matt Steer To allow the development of three office/warehouse buildings, totaling approxim of properly 1 of 2 Reviewed By Review Date Cornmen~ Greg Jones 3/30/2005 1. No rio( Marcie Diamond 4/1/2005 No corem Ken Griffin 3/31/2005 1. Monurr easemem need to itely 710,042-square feet, on 64 3 acres plans furnished for review comments. ;nts received. snt signs are shown to be in the utility on some of the drawings. Monument signs moved out of utility easements. 2. The prc~posed connections to Freeport Parkway are allowed p~ovided headache bars (or equivalent measures~ are installed to prevent !8-wheeler / truck traffic fro~ accessing Freeport Pkwy. 3. The dri Freeport driveway The drive Sandy La Road. ~eway at the corner of Sandy Lake Road and )arkway is too close to Freeport Parkway. The should be 125'-150' from the future road. ray at the corner of Northpoint Drive and :e Road is also too close to Sandy Lake Fire Administration Parks and Recreation Tim Cares John Elias 3/30/2005 3/30/2005 4. The dri up or be ' Site Plan: departme 2. Fire de building, fire lane. 3. Indicab 54' outsk Water PI; (measure closer fha 2. Show f 1. No lan 2. All exi~ be dead,; 3. Existin repaired. 4. Erosio outlet at r 5. Need t on slope~ reways along Northpoint Drive need to line 25' apart. 1. Show proposed fire hydrant and fire ~t connection locations. )adment connections shall be detached from vithin 50' of a fire hydrant, on same side of fire lane curve radii on site plan; 30' inside, n: 1. Fire hydrant maximum spacing of 300' I along approved route). Some are much ~ 300', some too far. 'e department connection locations. tscaping in the Hike & Bike Trail EasemenL ting trees in the Detention Area appear to md will need to be replaced. irrigation at Detention Area needs to be problems on slopes and at storm water etention Area. perform scheduled landscape maintenance of Detention Area. COPPELL Agency Planning Department Reviewed By Matt Steer G{T¥ OF COPPI:LL DRC REPORT Review Date Comments 3/31/2005 1~ Show tt easement 2. Revise Park Lot ~ 3. This is ~ Please re~ 4 Locate easement 5. Ensure 6. Place a under the COl'FELL e end of the Hike and Bike and Utility at Sandy Lake. Fitle Block to read, Amberpoint Business R, Block A Replat. lot a replat of Northpoint Drive Extension. ise. ;witchgears within TXU Electric Delivery all bearings and distances are correct. "Vol.__ Page__" for recording information :itle block.