DRC commentsCOPPELL
Project ID PD-05-0011
Address W Sandy Lake
C (T¥ O¢' CO(DP(ELL
DRC REPORT
Project N~me
COl'FELL
PD-194R3-Amberpoint Business Park
Project Type
Application Date
Case Mana,qer
Project Description
Agency
Building Inspection
Electric and Gas
Engineering
Re-Zoning PD
3/23/2005
Matt Steer
To allow the development of three office/warehouse buildings, totaling approxim
of properly
1 of 2
Reviewed By Review Date Cornmen~
Greg Jones 3/30/2005 1. No rio(
Marcie Diamond 4/1/2005 No corem
Ken Griffin 3/31/2005 1. Monurr
easemem
need to
itely 710,042-square feet, on 64 3 acres
plans furnished for review comments.
;nts received.
snt signs are shown to be in the utility
on some of the drawings. Monument signs
moved out of utility easements.
2. The prc~posed connections to Freeport Parkway are
allowed p~ovided headache bars (or equivalent
measures~ are installed to prevent !8-wheeler / truck
traffic fro~ accessing Freeport Pkwy.
3. The dri
Freeport
driveway
The drive
Sandy La
Road.
~eway at the corner of Sandy Lake Road and
)arkway is too close to Freeport Parkway. The
should be 125'-150' from the future road.
ray at the corner of Northpoint Drive and
:e Road is also too close to Sandy Lake
Fire Administration
Parks and Recreation
Tim Cares
John Elias
3/30/2005
3/30/2005
4. The dri
up or be '
Site Plan:
departme
2. Fire de
building,
fire lane.
3. Indicab
54' outsk
Water PI;
(measure
closer fha
2. Show f
1. No lan
2. All exi~
be dead,;
3. Existin
repaired.
4. Erosio
outlet at r
5. Need t
on slope~
reways along Northpoint Drive need to line
25' apart.
1. Show proposed fire hydrant and fire
~t connection locations.
)adment connections shall be detached from
vithin 50' of a fire hydrant, on same side of
fire lane curve radii on site plan; 30' inside,
n: 1. Fire hydrant maximum spacing of 300'
I along approved route). Some are much
~ 300', some too far.
'e department connection locations.
tscaping in the Hike & Bike Trail EasemenL
ting trees in the Detention Area appear to
md will need to be replaced.
irrigation at Detention Area needs to be
problems on slopes and at storm water
etention Area.
perform scheduled landscape maintenance
of Detention Area.
COPPELL
Agency
Planning Department
Reviewed By
Matt Steer
G{T¥ OF COPPI:LL
DRC REPORT
Review Date Comments
3/31/2005 1~ Show tt
easement
2. Revise
Park Lot ~
3. This is ~
Please re~
4 Locate
easement
5. Ensure
6. Place a
under the
COl'FELL
e end of the Hike and Bike and Utility
at Sandy Lake.
Fitle Block to read, Amberpoint Business
R, Block A Replat.
lot a replat of Northpoint Drive Extension.
ise.
;witchgears within TXU Electric Delivery
all bearings and distances are correct.
"Vol.__ Page__" for recording information
:itle block.