Loading...
DRC commentsCOFFELL Proiect ID PD*05-0024 Address 286 Vista Ridge Blvd CITY OF COPPELL DRC REPORT Project N~me COFFELL PD-205R-HC, Vista Ridge Addition, LtslBR*Sx,BII Project Type Application Date Case Manager Proiect Description Re-Zoning PD 5/18/2005 Gary Sieb from PD-205-HC to PD-205R-HC, to revise the Detail Site Plan to allow: a decrease in the zoning change request number of buildings from 6 to 5; an increase the size of the total square footag~from approximately 62,600-square feet to 74,238-square feet, and revised elevations, for the proposed one- and two-s~ory general and medical office buildings Agency Building Inspection Electric and Gas Engineering Fire Administration Parks and Recreation 1 of 2 Reviewed By Review Date Comment., Grig Jones 5/26/2005 1. No col Jeff Curry 5/26/2005 Zoning Cl Charlene La Martini 5/26/2005 Commenl engineeri Tim Oates 5/26/2005 1. Fire hy Required both devi~ 2. Fire lar 54-foot o~ John Elias 5/24/2005 ~ments made. ~ange Acceptable may be generated upon detailed ig review. Jrant and FDC for Lot 3/4 may be a tight fit? ~o have a minimum of 3' clearance around turning radii minimums are 30-foot inside, tside. No comments. COFFELL Agency Planning Department Reviewed By Gary Sieb CITY OF COPPELL DRC REPORT Review Date Comment., 5125/2005 SITE PL,~ 1. Revis( 2. Identif elevationl 3. Recou count ant are diffen 4. Re-fig~ 5. Elevat footprints 6. Three two eleva building e needs to updated. 7. Note 8. Zonin 9. Altho~ dumpster walls. 10. Secti~ section d, 11. NOT[ can begir 12. Pleas required I spaces. ELEVATI 1. Need 2. Show height). 3. Clearl material ~ 4. Label 5. Pleas~ board an glass, et these bui COFFELL color board needed for this application. ' buildings on Site Plan and relate to included with this request. ~t lots 5 and 6 parking spaces--numerical actual parking spaces shown on Site Plan ~re Lot 5 coverage. on labeled "Building #1" and Site Plan do not match 3uildings are shown on Site Plan yet only :ions are included--where's the third ;evation(s)? If same as building #1, still )e shown and footprints rick paver bands on Site Plan. is "PD" not "HC". Please make corrections. ;Ih difficult to determine from Plan, all must be screened with masonry screening 1 A-A and Site Plan dimensions of this not match. Replat will be required before construction on Lot3/4. indicate on Site Plan accurate number of ~arking spaces, number of provided parking 3NS ;levations of ail three buildings all dimensions of buildings (width, length, ~ show roof pitch dimensions; note roofing nd include sample on color board. )uilding #1, #2, #3. ~ label all formal building materials on color I elevations to include bdck, shingle, mullion, ~. color/manufacturer, to be used to construct dings.