DRC commentsCOFFELL
Proiect ID PD*05-0024
Address 286 Vista Ridge Blvd
CITY OF COPPELL
DRC REPORT
Project N~me
COFFELL
PD-205R-HC, Vista Ridge Addition, LtslBR*Sx,BII
Project Type
Application Date
Case Manager
Proiect Description
Re-Zoning PD
5/18/2005
Gary Sieb
from PD-205-HC to PD-205R-HC, to revise the Detail Site Plan to allow: a decrease in the
zoning
change
request
number of buildings from 6 to 5; an increase the size of the total square footag~from approximately 62,600-square feet
to 74,238-square feet, and revised elevations, for the proposed one- and two-s~ory general and medical office buildings
Agency
Building Inspection
Electric and Gas
Engineering
Fire Administration
Parks and Recreation
1 of 2
Reviewed By Review Date Comment.,
Grig Jones 5/26/2005 1. No col
Jeff Curry 5/26/2005 Zoning Cl
Charlene La Martini 5/26/2005 Commenl
engineeri
Tim Oates 5/26/2005 1. Fire hy
Required
both devi~
2. Fire lar
54-foot o~
John Elias 5/24/2005
~ments made.
~ange Acceptable
may be generated upon detailed
ig review.
Jrant and FDC for Lot 3/4 may be a tight fit?
~o have a minimum of 3' clearance around
turning radii minimums are 30-foot inside,
tside.
No comments.
COFFELL
Agency
Planning Department
Reviewed By
Gary Sieb
CITY OF COPPELL
DRC REPORT
Review Date Comment.,
5125/2005 SITE PL,~
1. Revis(
2. Identif
elevationl
3. Recou
count ant
are diffen
4. Re-fig~
5. Elevat
footprints
6. Three
two eleva
building e
needs to
updated.
7. Note
8. Zonin
9. Altho~
dumpster
walls.
10. Secti~
section d,
11. NOT[
can begir
12. Pleas
required I
spaces.
ELEVATI
1. Need
2. Show
height).
3. Clearl
material ~
4. Label
5. Pleas~
board an
glass, et
these bui
COFFELL
color board needed for this application.
' buildings on Site Plan and relate to
included with this request.
~t lots 5 and 6 parking spaces--numerical
actual parking spaces shown on Site Plan
~re Lot 5 coverage.
on labeled "Building #1" and Site Plan
do not match
3uildings are shown on Site Plan yet only
:ions are included--where's the third
;evation(s)? If same as building #1, still
)e shown and footprints
rick paver bands on Site Plan.
is "PD" not "HC". Please make corrections.
;Ih difficult to determine from Plan, all
must be screened with masonry screening
1 A-A and Site Plan dimensions of this
not match.
Replat will be required before construction
on Lot3/4.
indicate on Site Plan accurate number of
~arking spaces, number of provided parking
3NS
;levations of ail three buildings
all dimensions of buildings (width, length,
~ show roof pitch dimensions; note roofing
nd include sample on color board.
)uilding #1, #2, #3.
~ label all formal building materials on color
I elevations to include bdck, shingle, mullion,
~. color/manufacturer, to be used to construct
dings.