Loading...
DRC commentsCOl'FELL Project ID RP-05-0035 Address 1199 S Belt Line Rd CITY OF COPPELL DRC REPORT Project N;~me COFFELL Parkwest Commerce Center, Lots 2r & 3, Block 5 Project Type Application Date Case Manaoer Proiect Description Replat 7/22/2005 Marcie Diamond Being a replat of Lot 2, Block 5, to allow the sale of the undeveloped portion of this lot. Agency Building Inspection Electric and Gas 1 of 2 Reviewed By Review Date Greg Jones 7/27/2005 Jeff Curry 7/27/2005 Engineering Ken Griffin 7/28/2005 Fire Administration Tim Oates 7/26/2005 Parks and Recreation John Elias 7/22/2005 Comment~ 1. No cor~ments have been made Replat unbcceptable, contact Jeff Curry at 972-570-4125 to discuss easement requirements. Replat 1. In the e~/ent that City Council waives the condition to requireiadditional site plan review, Impact Fees will be payabl~ prior to filing the plat. 2. How is Ithe issue of utility ownership and maintenar~ce going to be resolved? 3. Not enough information provided to thoroughly review. 1. Currenl drive openings to S. BeltLine and Wrangler for Lot 2R shall be designated Fire Lane/Mutual Access e~sements. Fire Department requires a minimum pf two entry points. 2. When ~'ill the 63'x75' mutual access easement at the NE corner be completed? No comments. COFFELL Plannin~ Department Reviewed By Marcie Diamond CITY OF COPPELL DRC REPORT Review Date Comments 7/27/2005 1. Approv; of the revi site plan ~ size). A nl plan notin prior to dE any easer 2. Chang( Site Plan 3. This rel both side,' over stor~ total of 13 13 trees c months ol 4. Once p revised tc mutual ac Belt Line and prop( 5. Revise Lot 2, Bio 6. Revise utility sigr T H E · I= I T Y · 0 F COFFELL fl of this replat does not constitute approval ;ed site plan {which is essentially the same pproved in 19981 except for a reduction in ,te needs to be placed on the replat and site ~ that "Site Plan approval will be required velopment on Lot 3, Replat may required if lents need to be relocated." the title of the Site Plan sheet to Concept or Tract 3. ~lat is creating 10-foot landscape buffers on of the common property line, therefore one tree is required evep/50 linear feet, for a trees on each side of the property line. The n Lot 2R need to be installed within 6 Council approval of the Replat. atted into two lots, all fire lanes need to be be mutual access and fire lanes. These ;ess/fire lane easements need to extend to ~oad and Wrangler Drive via the existing sed driveways. the title block to include "Being a replat of ;k 5 of the Park West Commerce Addition" TXU Gas to Atmos Energy in the franchise ature block.