DRC commentsCOl'FELL
Project ID RP-05-0035
Address 1199 S Belt Line Rd
CITY OF COPPELL
DRC REPORT
Project N;~me
COFFELL
Parkwest Commerce Center, Lots 2r & 3, Block 5
Project Type
Application Date
Case Manaoer
Proiect Description
Replat
7/22/2005
Marcie Diamond
Being a replat of Lot 2, Block 5, to allow the sale of the undeveloped portion of this lot.
Agency
Building Inspection
Electric and Gas
1 of 2
Reviewed By Review Date
Greg Jones 7/27/2005
Jeff Curry 7/27/2005
Engineering Ken Griffin 7/28/2005
Fire Administration Tim Oates 7/26/2005
Parks and Recreation
John Elias 7/22/2005
Comment~
1. No cor~ments have been made
Replat unbcceptable, contact Jeff Curry at
972-570-4125 to discuss easement requirements.
Replat
1. In the e~/ent that City Council waives the condition
to requireiadditional site plan review, Impact Fees will
be payabl~ prior to filing the plat.
2. How is Ithe issue of utility ownership and
maintenar~ce going to be resolved?
3. Not enough information provided to thoroughly
review.
1. Currenl drive openings to S. BeltLine and Wrangler
for Lot 2R shall be designated Fire Lane/Mutual
Access e~sements. Fire Department requires a
minimum pf two entry points.
2. When ~'ill the 63'x75' mutual access easement at
the NE corner be completed?
No comments.
COFFELL
Plannin~ Department
Reviewed By
Marcie Diamond
CITY OF COPPELL
DRC REPORT
Review Date Comments
7/27/2005 1. Approv;
of the revi
site plan ~
size). A nl
plan notin
prior to dE
any easer
2. Chang(
Site Plan
3. This rel
both side,'
over stor~
total of 13
13 trees c
months ol
4. Once p
revised tc
mutual ac
Belt Line
and prop(
5. Revise
Lot 2, Bio
6. Revise
utility sigr
T H E · I= I T Y · 0 F
COFFELL
fl of this replat does not constitute approval
;ed site plan {which is essentially the same
pproved in 19981 except for a reduction in
,te needs to be placed on the replat and site
~ that "Site Plan approval will be required
velopment on Lot 3, Replat may required if
lents need to be relocated."
the title of the Site Plan sheet to Concept
or Tract 3.
~lat is creating 10-foot landscape buffers on
of the common property line, therefore one
tree is required evep/50 linear feet, for a
trees on each side of the property line. The
n Lot 2R need to be installed within 6
Council approval of the Replat.
atted into two lots, all fire lanes need to be
be mutual access and fire lanes. These
;ess/fire lane easements need to extend to
~oad and Wrangler Drive via the existing
sed driveways.
the title block to include "Being a replat of
;k 5 of the Park West Commerce Addition"
TXU Gas to Atmos Energy in the franchise
ature block.