Loading...
CC approval on 7/12/05AGENDA REQUEST FORM COPPELL DEPT: Planning DATE! July 12, 2005 ITEM g: 18 ITEM CAPTION: PUBLIC HEARING: Consider approval of Case No. PD-108R6-H, Historic Coppell Properties,[ Ltd., zoning change request from PD- 108-H and H (Planned Development-108-Historic and Historic) to PD~108R6-I-I (Planned Development-106 Revision 6-Historic), to amend the Planned Development and attach a Detall Site Plan to allow the development of two medical and office buildings totaling 33,108-square feet on approximately 3.3 acres of property located along the south side of Bethel Road, approximately 185 feet east of Coppell RoadI GOAL(S): APPROVED BY CITY COUNCIL ON ABOVE DATE EXECUTIVE SUMMARY: Date of P&Z Meeting: June 16, 2005 Decision of P&Z Commission: Approval (6-0) with CommissionersIBorchgardt, Hall, McCaffrey, Foreman, Milosevich and Kittrell voting in favor. None opposed. Approval is recommended, subject to the following conditions: I) A Tree Removal Permit is required at the time of construction 2) Include legend on Site Plan. 3) Re-evaluate trees to be preserved on Landscape Plan. 4) Recalculate landscape areas. 5) Remove vinyl windows (Typ.) and label all colors and materials on elevations. 6) Include chart on Tree Survey sheet. Staff recommends approval. Agenda Request Form - Revised 09/04 Motion to close F subject to conditi under PD Condit ard for Phase II ~on-vehicular lar to be greater tha - York - Brancheau ote - 6-0 Tunnell absent ublic Hearing and Approve )ns 1-6 and to include a note 3ns allowing parking in the front a reduction in perimeter and :lscaping and the structure size i 5,000 square feet. )ocument Name: ~7PD-108R6-H HCP I-AR CASE NO.: CITY OF COPPELL PLANNING DEPARTMENT ST~AF__F_F REPOR~T / PD-108R6-I-I Historic Coppell Properties Ltd. P & Z HEAR1NG DATE: C.C. HEARING DATE: June 16, 2005 July 12, 2005 STAFF REP.: Matt Steer, City Planner LOCATION: South side of Bethel Road, approxi] Road. SIZE OF AREA: 3.3 acres of property CURRENT ZONING: PD- 108-H (Planned Development- 1 ( REQUEST: PD- 108R6-H (Planned Developmenl attach a Detail Site Plan to allow the office buildings totaling 33,108-squa APPLICANT: Applicant: Roger (Skip) Blake, Architect Blake Architects 1202 S. White Chapel Rd., Ste. A Southlake, Texas 76092 Phone: (817) 488-9397 Fax: (817) 251-3205 HISTORY: In 1989, 115 acres were rezoned from PD-Recre~ as the Springs of Coppell) for institutional, offic industrial uses. This property was owned by the Concept Plan indicated a proposed university sit, Item # 10 Page 1 of 5 nately 185 feet east of Coppell 8-Historic) -108 Revision 6-Historic), to ]evelopment of two medical and 'e feet. tion Center to PD-108 (known ~, retail, commercial and light Baptist Foundation, and their east of Grapevine Creek. To the west of Grapevine Creek was a proposed pa envisioned for light industrial/tech uses, with ce proposed along Denton Tap Road. In 1995, this the development of The Summit at the Sprir subdivision on approximately 30 acres located rc Tap Road, south of Bethel Road. In 1998, this The Reserve, a 23-1ot residential subdivision on' west of The Summit at the Springs. In 1998 a re (which now includes the Service Center site) fro~ 102 single-family lots (to be known as Westchas~ This 37-acre tract was subsequently sold to the ( Recently, the base zoning of this area was re incorporates specific development standards and TRANSPORTATION: Bethel Road is two-lane asphalt road co right-of-way. Freese and Nichols has which are now 90% ,complete, showinl and approximately 28 of pavement north side, adjacent to this request. Coz late 2006. SURROUNDING LAND USE & ZONING: North-single-family residential: SF9 South - vacant; H (Historic) & PD-108-I East - vacant; PD-108-H West -single-family residence; H (Histor COMPREHENSIVE PLAN: The Comprehensive Plan sh for a use allowed in the His~ allowed). DISCUSSION: A Planned Development (PD) revision is already being included within a larger P approved Historic district that falls under Zoning Ordinance. The Site Plan packa guidelines and generated more comments t as the district regulations were being forz being designed. Staff has worked with Item # 10 Page 2 of 5 'k. The balance of the PD was ,mmercial and office buildings PD was amended to allow for gs, a 46-1ot SF-9 residential ughly 500 feet west of Denton PD was amended to allow for L7 acres of land located to the quest to rezone a 37-acre tract a PD-LI and R to PD-SF-9 for ~,) was denied by City Council. .ity of Coppell for future use. ,~oned to H (Historic), which se regulations. ~tained within a variable width epared the construction plans, variable right-of-way widths ith angled parking along the struction is scheduled to begin )ws the property as suitable oric district (office uses are aecessary due to this property 9. It is part of the recently the Design Guidelines of the ;e was evaluated under these ~an usual. This was expected, mlated when this project was he applicant for an extended The outstanding technical issues are outlined STAFF RECOMMENDATION section. as conditions within the Page 3 of 5 Site Plan This request is for a two-phased office ar Phases I & II encompass 16,687-square buildings (including porch areas). The p concrete, although asphalt is acceptable feels the greater life span of concrete fm asphalt construction. The first phase calculated at a ratio of 1 space per 175-s, are provided. The parking is shown a~ outlined in the Design Guidelines. There for the Phase II building, and the applica: One of the PD conditions being requested front of the building, which is a vari.· Historic district development standards. as a condition because the parking landscaping. There is a shared drive extending south i This is located along the mutual property A fire lane extending to Coppell Road within two years from completion of the P has an option to purchase the land for Pha. issuance of a Certificate of Occupancy: delayed construction of the fire lane will made. The fire lane will give the EMS a different road. It will also serve as construction of the proposed improvemem Victorian-style street lamps are proposed approximately 14' in height and will Historic district (already installed in development). Landscaping Plan and Tree Preservatio~ The interior landscaping, or parking lot with the requirements of the Historic requesting a PD condition allowing for perimeter landscaping along the south side this reduction as the adjacent property is Item # 10 d medical office development. foot- and 16,421-square-foot- irking area is proposed to be n this district. The applicant outweighs the less expensive requires 89 parking spaces, uare-feet of building area; 89 the rear of the building, as re 90 parking spaces required it is meeting this requirement. is to locate Phase II parking in ~ce to the recently approved :afl recommends including this irea will be screened with ~to the site from Bethel Road. line between Phases I and II. is required to be constructed ~ase I structure. The applicant ~e II within two years from the i>r Phase I. Therefore, the allow for this decision to be second point of access from a valuable access during the to Bethel Road. ~r the parking area. These are tatch those approved for the ~e Old Coppell Townhomes landscaping, is in compliance district. The applicant is a reduction to the required of Phase II. Staff can support urrently owned by the City of Coppell and is designated as green/open space with a trail system in the Old Coppell Master Plan. There are nine trees being removed withi inches. Tree mitigation fees of $11,530 of removal; however, some of this cost trees shown on the Landscape Plan ar minimum 3-caliper inches. The Tree Sur caliper inches, and the applicant is analyl the trees and also to reduce the cost by sizes. ~ Phase I, totaling 153-caliper .re required to be paid at time m be reduced if the proposed ,' increased in size over the ley for Phase II shows 1,007- ing ways to preserve some of increasing the proposed tree Elevations / Signage The structures exceed the 5,000-square-f~ot threshold specified in the Historic district that would require a SpeCial Use Permit; however, this variance can be included as a con~lition within this Planned Development. i Page 4 of 5 The proposed building materials are brick.. is the primary building material with natur at entry points. Cedar is used on the lintel accent on the dormers and building. The height of the proposed structures is ~ the maximum allowable height of 35'. Th street, with entries shown on both the no north elevation for this phase has sew multiple gable ends fronting the street. shown on the black and white elevations, more traditional bronze aluminum. The v with clear panes as outlined in the Desig: the roof break up the expanse. There is b~ of the buildings to meet the brick foundati letters of the sign are to be of bronze mate] The attached sign areas depicted are 12' will read "Historic Coppell Properties" a~ of the structure. The letters are black an, spotlight shining down on the sign, so surrounding properties. No monument sigr Item # 10 stone and cedar. Brown brick il stone used on the gables and above the windows and as an 6.5'and is in compliance with ~ first phase is oriented to the 'th and south elevations. The ..ral roof line variations and Although vinyl windows are he applicant has agreed to the 'indows are vertically oriented m Guidelines. The dormers on ick proposed along the bottom ~n requirement. The proposed iai, black in color. wide by 2.5' tall. The signs d will be located on each end I will be externally lit with a as not to spill over into the is permitted. RECOMMENDATION TO THE PLANNING AND ZONING CC MMISSION: Staff recommends APPROVAL of this request, subject t~ the following conditions: 1) A Tree Removal Permit is required at the tim~ of construction. 2) Label various materials on Elevations. 3) Show proposed sign area with dimensions andI total square footage. Sign shall be bronze material, black in color. 4) Show details of proposed on-site sidewalk (co or, paver type) as encouraged within the Old Coppell Design Guidelines. 5) All windows shall be bronze aluminum (not v nyl) with clear panes. 6) Enlarge the PD Conditions Note. 7) Include legend on Site Plan. 8) Remove hatching from Site Plan. 9) A registered Landscape Architect is required ) seal Landscape Plans. 10) Show trees to be preserved on the Landscape tlan. 11) Recalculate landscape areas. 12) Remove the majority of the random informati4n from the proposed Bethel Road improvements (Leave proposed pavemeqt, proposed sidewalk, existing fire hydrants). I ALTERNATIVES 1) Recommend approval of the request 2) Recommend disapproval of the request I 3) Recommend modification of the request / 4) Take under advisement for reconsideration at a later ~tate. ATTACHMENTS: 1) Site Plan 2) Elevations 3) Tree Survey 4) Landscape Plan Item # 10 Page 5 of 5 ~lO,~y e~lelB !1 I I ,~' d , , ~ ~, ~,~ ~, o L ~.~.~<~ ,~,~/'""~',~, --~,,' I" , ' " ~ ~ -i~ ~ 'r, Area Surveying, Inc. TREE CHART ISTORIC COPPELL PRO!PERTIES Tree No. ~ DBH-Species Canopy C~own % Live Points C ass Crown 401 151N-~EDAR 15-10-16-14 D 60 402 161N-C~DAR _ 15-15-12-12 LD_ .... 60 403 301N-PE~AN 30-45-42-40 ID 95 405 17~N-PEC^~ 18-27-a1-12 ~c oo 406 14,N-P,::CA~ a1-15-27-18 C 00 4oz ,a~-~ols ~'~c ~-~o-~4-,~~ ~o 4o. ~o,.-.ACX..~v ~o-~-4-~o ic 4o 4o~ ~.-~.SQU,~ ~0-0-0-0 iC ~0 4~ ~-~O~S YArC ~ ~-~-~-~0 'C S0 412 91N-CEDAR ~ 12-12-14-10D 50 413 101N-HACKBERRY ~ 10-18-12-15 C 50 416 201N-TREE 1~-10-8-12D 30 4~z ~4~N-PEC~N 22~-~0-a0 iD 00 4~ ~S~N-PECAN ~4-~-~-~ ~C Z0 419 131N-HACKBERRY 21-0-~-18 IS 80 420 ~0~N-,ACKBERRY ~4-a-~-&o ID Z0 42~ ~a~N-UESQU~TE 20-20-~ rD 50 422 131N-MESQUITE 12-0-0-3 ~ ~ 40 423 121N-BOlS D'ARC 20-15-10-1~ 50 424 81N-PECAN 15-10-0-8 ~C 80 426 81N-CEDAR 5-12-10-8 ~'X~~IU 50 427 181N-PECAN 20-18-22-25 ~ 80 428 101N-PECAN 8-8-10-12r~,,,, 60 429 101N-MESQUITE 20-3-0-6 30 ~430 151N-CEDAR 18-7-10-10 ~D '"', 70 43t 191N-MESQUITE 20-22-12-10 ~D ~ 50 432 81N-ELM 6-10-15-10 ~D ~ 60 433 101N-MESQUITE 0-0-20-15 ~ ~ 30 I 434 61N-CEDAR 10-10-8-12C ~0 ~435 141N-MESQUITE 24-4-0-0 ~C~5~ ~436 91N-CEDAR 10-8-10-12 ~C I 437 101N-TREE 10-20-15-0 [C 60 ~ Area Surveying, Inc. REGISTERFI) PROFESSIONAL LAND SURVEYORS 135 Sheffield Dnve Fort Worth, TX 76134 438 ~ 71N-ELM 20-0-0-0 C 30 439 '~ 71N-CEDAR 8-10-8-6 C 30 440~, 141N-HACKBERRY 12-9-15-20 C 90 441 x 121N-HACKBERRY 27-15-12-9 C 80 442 "t,71N-PECAN 18-15-15-21 D 95 443 1 ~N-HACKBERRY 10-15-14-10 D 75 444 22IN, PECAN 24-21-18-24 C 90 445 221N-'PkECAN 15-14-18-15 iD 90 446 201N-PExCAN 21-18-18-15 lC 90 447 181N-PE(3~AN 24-15-24-27 C 90 448 301N-PECA~ 25-26-21-18CC 90 449 181N-PECAN~ 27-15-16-15 95 450 201N-PECAN \ 30-25-18-24 C 95 451 181N-PECAN ~ 27-21-12-15 C 90 452 201N-TREE ~\ 20-24-18-18 C 95 453 191N-TREE ~ 20-22-18-16 D 80 454 241N-PECAN x\ 35-30-32-30 D 80 455 141N-PECAN ~ 21-15-24-18 C 90 456 261N-PECAN \ 22-20-24-22 C 85 457 201N-PECAN ~_4-21-22-18 C 95 458 161 N-PECAN L~-18-24-15 C 90 459 121N-PECAN 24~_1-18-20 iC 80 460 161 N-PECAN 15-:L~- 18-18 C 50 461 61N-CEDAR 12-10-~12-8 S 60 462 241N-PECAN 24-21 - 1'8,- 18 D 80 463 161N-PECAN 18-15-18;'1~2 D 80 464 201N-MESQUITE 10-20-16-8 ~ D 60 467 161N-CEDAR 12-10-14-18 ~ D 60 468 141N-MESQUITE 12-18-15-14 ~ D 60 469 141N-MESQUITE 6-15-12-0 , C 50 470 101N-HACKBERRY 14-12-10-12 ,D 70 471 221N-MESQUITE 0-0-20-10 ~ 50 472 141N-MESQU ITE 25-12-10-15D% 50 473 101N-MESQUITE 25-16-0-12 D ~ 50 474 241N-PECAN 35-34-30-38 D ~80 475 351N-PECAN 30-35-32-30 D ~ 70 476 201N-PECAN 30-20-15-20 D ~, 70 477 101N-HACKBERRY 22-16-25-20 / '~80 478 161N-MESQUITE 18-15-14-15D 9{) Crown Class: I=lntermediate; S=Supressed; C=CoDominal Page 2 of 2