Loading...
Letter of postponementD5/13/2005 09:41 8172513205 BLAKE ARCHITECTS PAGE ~1/01 May 12, 2005 Matt Steer, City Planner City of Coppell 255 Park-way Boulevard Coppell, T~.as 75019 Ref: HistOric Coppell Properties (formerly 6fled "Bethel Historical Dear Matt; The Owner's Group of Tony and Laura Swaldi and Kym Harley ha to Table this Project to the next meeting Schedule. It is felt that the: brought forth by the City and its Stat'fin the DRC Review that need properly resolve. These issues are as follows: 1, Giving enough time to the City's Surveyor and our Surveyor to the actual Property Line and it's metes and bounds along Bethel 2. The requested Driveway to Old Coppell Road. Can we create offBethel Road with in the Phase two Lot? The Cost of this Dr the curb-cut Fees for the Drive approach? Does this create any Properties") re decided to request · 81'o som~ iSSUeS more rime to ~roperly coordinate Road. second access point veway? Who pays mpactfces?Etc. 3. The use of Cedar in Lieu of Painted steel with-in the Truss wot[ at Entries Design? Thank yon so much for all your help with this Project. These are all[minor issues and I know will be resolved to everyone's satisfaction, giving a little mor~ time will make this conclude much more smoothly. ' Sincerely, Blake cc. Laura Swaldi, Kym Harley