AGENDA REQUEST FORM
DEPTi Planning
DAT[~: October 11, 2005
ITEMi#: ll/E
ITEM CAPTION:
Consider approval of a nine-month extension to the expiration date of the Beltline Trade Center, Lot 1, Block 1,
Minor Plat, to allow the development of an approximate 375,000-square-fo0t warehouse distribution building on
27.072 acres of property located along the north side of Beltline Road, approximately 1,000 feet east of North Lake
Drive.
GOAL(S):
APPROVED BY
CITY COUNCIL
ON ABOVE DATE
Motion to Approve
M - Tunnell
S - Peters
Vote - 7-0
EXECUTIVE SUMMARY:
Date of P&Z Meetine:
Decision of P&Z Commission:
N/A
N/A
On March 17, 2005, the Planning Commission unanimously recommended approval of this Minor Plat (6-0).
On April 12, 2005, Council unanimously approved this Minor Plat (6-0).
Please see IDI Vice President David Seaman's letter dated September 15, 2005, requesting a nine-month extension
of this Plat. The Planning Commission does not have the authority to grant extensions. If Council were to approve
this request, the Beltline Trade Center, Lot 1, Block i, Minor Plat, would eapire July 12, 2006.
Staff recommends approval.
Agenda Request Form - Revised 09/04 Document Name: ~BLTC, MPX I-AR (Con)
ill
z
September 15, 2005
Mr. Gary L. Sieb, AI.C.P.
Director of Planning
City of Coppell
P.O. Box 9478
Coppell, Texas 75019
Re: Beltline Trade Center, Lot 1, Block 1, Minor Plat
Dear Mr. Sieb:
IDI received City Council approval of the above referenced
This approval is set to expire on October 12, 2005. This lett
the City of Coppell's approval for a nine (9) month extensi
minor plat.
We have been moving forward with this project, but are currE
civil plans for review by Engineering, and therefore file the m
received approval from the City of Dallas for the required rr
Belt Line Road necessary to serve the project, as evidence
letter. We are also preparing a submittal for Building B, the;
east of Building A. We have been unable to complete all of ti'
this project forward within the six month approval period.
project on April 18, 2005.
;r is to respectfully request
)n on the approval of this
ntly not prepared to submit
nor plat. To date, we have
edian improvements along
:1 in the attached approval
'..996 acre out parcel to the
e steps necessary to move
Please feel free to call Eddie Eckart, P.E. with Goodwin and ~arshall, Inc. at (817) 329-
4373 or me at (972) 560-7003 should you have questions or require additional
information. Thank you for your consideration in this extensio~ request.
Sincerely,
IDI
Vice President Construction
Dallas Region
CC;
Barbara Jahoda - City of Coppell, Srl Administrative
Doug Johnson - IDI
Eddie Eckart - Goodwin & Marshall
IDI Two Lincoln Centre, 5420 LBJ Freeway, Suite 1275, Dallas, Texas 75240 972-56
;ecretary, Planning
1-7000 Fax: 972-560-7007 www. idi.com
August 8, 2005
CITY OF DALLAS
Goodwin and Marshall, Inc.
2405 Mustang Drive
Grapevine, Texas 76051
Re.'
Beitline Median Improvements
311T-7244
Gentlemen:
Your submitted plans for the proposed addition have been rewe
approved. The review of these plans by the Department of De~
nature. By approving these plans, the Department of Developme
liability for the engineering design nor does approval release th
for correcting errors and omissions in kis design both during and
Approval of these plans will automatically terminate if the pay
twelve months of the date of this letter.
Please furnish to Engineering Division, the electron/c copy on C
bound sets of final plans and updated plat to 320 E. Jefferso~
drainage improvements within the public Right-of-Way or ease~r
a copy of the appropriate locator sheet referencing the 311
development contract is executed. Copies of locator sheets are
Oak Cliff Municipal Center in Room 314.
A Private Development Contract for construction should be
reviewed by the Developer's engineer when work is needed wit
easement. The complete contract package consisting of all itc
should be submitted to Johnny Sudbury. Items will not be accep~
Please note that all construction acnvities must comply with TPE
Please contact Texas Commission on Environmental Quality
~.TCE .c_Q_.~.~). Prior to any construction, a copy of the Stc
Plan (SWPPP) must be submitted to this office.
~ved by this deparmaent and are
:lopment Services is cursory in
it Services does not assume any
design engineer l~om liability
rfter construction.
ng work has not begun within
~, one mylar and three complete
, Room 200. If there are any
ents, indicate these facilities on
r Number before the private
available at 320 East Jefferson
~ared by the Contractor and
fin the public Right-of-Way or
ms shown on the attached list
ed individually.
~S General Permit TxR150000.
(TCEQ) for all requirements
an Water Pollution Prevention
DEVELOPMENT SERVICES ENGINEERING DIVISION 320E. JEFFERSON BLVE).. ROOM 200 DALL~.$, TEXAS 75203 TELEPHONE214/948-4205
Goodwin and Marshall, Inc.
August 8, 2005
Page 2
The City performs periodic construction inspection. Howeve
the necessary construction inspection or the materials testing
nuprovements and proposed infi:astructures. These services
privately. Please include a description of the work to be 12
Right-of-Way and easements along with the price breakdow
contract package. An inspection fee must also be paid in adv
private development contract. The mount of this inspection
of the private development contract. (See attached)
· , the City does not perform
for the construction of the
will need to be contracted
,~rformed within the public
~ of various items with the
race of the execution of the
fee is based on the mount
Upon the approval of your contract package, a pre-conStruction meeting will be
scheduled for a mutually a,greeable date with Mr. Don Livergpod, Inspection Supervisor.
It will be the Developer s responsibility to see that the peveloper's Engineer, the
Materials Testing representative, the Construction Inspector, ~md the General Contractor
will be in attendance at the pre-construction meeting to discuss the materials testing,
construction inspection and project finalizing guidelines.
The Contractor and Developer/Owner will receive a contract a
pre-construction meeting. When a Dallas Water Utilitie
Contractor may not proceed with work on the paving contract
Interim Chief Engineer
Engineering Division
Department of Development Services
pproval letter following the
release is required, the
)rior to release.
Attachments
IDI
5420 LBJ Fwy.
Grapevine, Texas 76051
ins[~ection Fee
Amount of Private Develop_merit Contract $ Fee Amoun
The value of the proposed improvement
is $12,500 or less
$600.00
The value of the proposed improvement $1,000.00 i
Is from $12,501 to $25,000~
The value of the proposed improvement
Is from $25,001 to $100.000
The value of the proDosed improvement
Is from $100,001 to $500r00fl
The value of the proposed improvement
Is $500.001 to $1.000.000
The value of the ProPOSed improvement
Is $1.000.001 or more
$1,000.00, plu
by the value
In excess of
$0.035 multiplied
:he improvement
!5,001
$0.03 multiolied
:the improvements
[00r001
as $0.025 multiplied
the improvements
i00,001
$3.625~00, plu
ipy the value o
In excess of $
~I5,625.00, pi
by the value o
In excess of $
$28,125.0~. ol~s $0.02 multiolied
the value o~the improvements
excess of $~.000,001