Loading...
P&Z letter-approval on 7/21/05COl'FELL July 22, 2005 Mr. Chad Jackson Pacheco Koch Consulting Engineers 8350 N. Central Expressway, Suite 1000 Dallas, TX 75206 RE: Crescent Additiont Lot It Block At Minor Plat and Rei~lat Dear Chad: : This letter is to inform you that the Crescent Addition, Lot 1, B~ock A, Minor Plat and Replat, being a partial Minor Plat of 0.99 of an acre tract and a Replat of l[,ot 5 of the Coppell Commerce Center, Phase 1, to allow the development of an approximate 14i205-square-foot restaurant and private club, with outdoor seating and cooking areas, on 1.9 acre, s of property located along the south side of Bethel Road, east of Freeport Parkway, was recc4mmended for approval by the Coppell Planning and Zoning Commission on Thursday, July 21i 2005, subject to the following condition: 1) Compliance with the attached Engineering comment~. The date scheduled for consideration by the Coppell City Council iR Tuesday, August 9, 2005, at 7 p.m. A representative for this case must be present at this meetinfl, which will be held in Council Chambers at City Hall. Failure to represent this item may result in the denial of this application. If you have any questions, please contact the Planning Departmen! at (972) 304-3678. Sincerely, Marcie Diamond Assistant Director of Planning Attachment Cc Building Inspection Andrea Roy file OPPELL Proiect ID RP-05-0029 Address CITY OF (;;OPPELiL Znd DRO REPOR I' Proiect I~lame CO?PELL Crescent Addition Lot l, BIock A, RP&Mp _Project Type Application Date _C~se Manaqer .Project Description Replat 6/22/2005 Matt Steer Being a partial Minor Plat of 0 99 of an acre tract and a Replat of Lot 5 of the C~ppell Commerce Center, Phase 1, to allow the development of an approximate 14,205-square-foo~ restaurant and pdlvate club, w~th oul0oor sealing and cooking areas Aqency Engineering 1 of 1 Comments Grading & Drainage Plan - 1 Show the proposed 5' x 10' box culverts to be constructed with the Bethel Rd reconstruction project Those boxes should be in I~lace before permanent paving is constructed over the top of where they wilr go Water & Sanitary Sewer Plan - 2 Provide a looped fire line with appropriately spaced fire hydrants throughout the site The size of the building requires it to be sprinkled Coc~rdinate that with the Fire Marshal 3 All crossings of Bethel Rd should be done by mjeans other than open cut. The 16" waterline in Bethel Rd rs concrete cylinder pipe You may ~4ant to only tap it once with a larger line s~ze.