Development Fee WorksheetPROJECT:
DATE: 1/0/1900
D~,om~e s tic Meter(s):
Irrigation Meter(s):
DEVELOPMENT FEE WORKS!EET
0
0
0
Fireline Meter(s): 0 =
Total #: 0 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
0
= 0
= 0
0
mit)
~eter)
;0.00
mit)
leter)
;0.00
;0.00
;0.00
~0.00 ea.
Water Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea.
(Single family due prior to issuance of building pe
(All other developments due prior to issuance of
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @
(Single family due prior to issuance of building-~
(All other developments due prior to issuance of
Irrigation/Fireline Water Meter Fee:
Total 0: 0 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
~"~ (, T~fal Domestic Meters ESU's: 0 @ $2
~ ~ (Due prior to issuance of building'permit)
Wastewater Tap Inspection Fee:
Total 0: 0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total 0: 0 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page 1
Park Fee (For Residential Developments Only):
ESU's
ESU's
ESU's
ESU's
$0.00
$o.oo
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
DEVELOPMENT FEE WORKSH!ET
* Preliminary plat approved:
0 Single-family @ $0.00 per lot
0 Multi-family @ $0.00 per un
(100% paid prior to Council approval of final plat)
~act Fee:
(See attached fee calculations)
Street Li~ing Fees:
? - Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assesse
(100% due prior to final acceptance of development)
Street S~ Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for ass(
The contracts should indicate the cost to construct the improve
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
nent.
nents
$0.00
$0.00
$0.00
Information not Available
Information not Available
Information not Available