Loading...
Development Fee WorksheetPROJECT: DATE: 1/0/1900 D~,om~e s tic Meter(s): Irrigation Meter(s): DEVELOPMENT FEE WORKS!EET 0 0 0 Fireline Meter(s): 0 = Total #: 0 ESU's @ $280.00 ea. (Due prior to issuance of building permit) 0 = 0 = 0 0 mit) ~eter) ;0.00 mit) leter) ;0.00 ;0.00 ;0.00 ~0.00 ea. Water Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (Single family due prior to issuance of building pe (All other developments due prior to issuance of Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ (Single family due prior to issuance of building-~ (All other developments due prior to issuance of Irrigation/Fireline Water Meter Fee: Total 0: 0 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) ~"~ (, T~fal Domestic Meters ESU's: 0 @ $2 ~ ~ (Due prior to issuance of building'permit) Wastewater Tap Inspection Fee: Total 0: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 0: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) Page 1 Park Fee (For Residential Developments Only): ESU's ESU's ESU's ESU's $0.00 $o.oo $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 DEVELOPMENT FEE WORKSH!ET * Preliminary plat approved: 0 Single-family @ $0.00 per lot 0 Multi-family @ $0.00 per un (100% paid prior to Council approval of final plat) ~act Fee: (See attached fee calculations) Street Li~ing Fees: ? - Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assesse (100% due prior to final acceptance of development) Street S~ Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for ass( The contracts should indicate the cost to construct the improve that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 nent. nents $0.00 $0.00 $0.00 Information not Available Information not Available Information not Available