CC approval on 11/8/05AGENDA REQUEST FORM
COPPELL
DEPTt Planning
DATE: November 8, 2005
ITEM//: 15
ITEM CAPTION:
Consider approval of the Natches Trace Addition, Lot 1, Block C, (Town Center Bank) Site Plan Revision, to
allow the construction ofa dumpster enclosure to serve the existing 8,867-square-foot bank facility on 1.550 acres
of property located along the east side of Denton Tap Road, approximately 300~feet south of S.H. 121.
GOAL(S):
APPROVED BY
CITY COUNCIL
ON ABOVE DATE
Motion to Approve
M - Peters
S - Hinojosa-Flores
Vote - 6-0 · u~,
Suhy absent ~'~
EXECUTIVE SUMMARY:
Date of P&Z Meeting: October 20, 2005
Decision of P&Z Commission: Approval (6-0-1) with Commissioners Borchgardt, McCaffrey, Foreman,
Haas, Kittrell and Reese voting in favor. Commissioner Hall abstained after filing an Affidavit of Conflict
of Interest statement with the secretary.
Approval is recommended with no conditions~
Staff recommends approval.
Agenda Request Form - Revised 09/04 Dacumcnt Name: ~4Natches Trace SPRv I-AR
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE: Natches Trace Addi.tion, Lotll, B. l.ock C
(Town center Bank), Site Plan $evls~on
P & Z HEAR1NG DATE:
C.C. HEARING DATE:
October 20, 2005
November 8, 2005
STAFF REP.:
Matt Steer, City Planner
LOCATION:
Along the east side of Denton Tap R4ad, approximately 300' south
of S.H. 121.
SIZE OF AREA:
1.550 acres of property
CURRENT ZONING:
HC (Highway Commercial)
REQUEST:
Site Plan revision to allow the constrUction of a dumpster enclosure
at the northeast comer of the properg4.
APPLICANT:
SLI Group, Inc.
Craig Garcia
10200 Old Katy Rd.
Houston, TX 77043
PHONE: (713) 465-4650
FAX: (713) 465-0077
Page 1 of 3
Item # 9
HISTORY:
A bank facility, containing 8,846-sqt~are feet and three drive-through
lanes, was approved by City Council September 14, 2004, and has
since been constructed.
TRANSPORTATION:
Along the front of the subject property, Denton Tap Road is a P6D,
six-lane divided roadway, within aniapproximate 130' fight-of-way,
with a varied width along the length bfthe roadway.
SURROUNDING LAND USE & ZONING:
North- retail center; HC (Highway Commercial)
South - vacant; HC (Highway Commercial)
East - Coppell Middle School North & Denton Cj~eek Elementary; SF-7 (Single-
Family)
West -Magnolia Village retail center; PD-133-H~C (Planned Development-133,
Highway Commercial)
COMPREHENSIVE PLAN:
The Comprehensive Plan sh~ws the property as suitable for
regional retail, which includes banking facilities.
DISCUSSION: This is a simple request for a dumpster endlosure to be constructed on the
northeast comer of the lot, which was no~ included within the Site Plan
previously approved in September 2004. ?he 105-square-foot dumpster
pad will remove some of the previously approved 3,926-square feet of
interior landscaping, reducing this figure tO 3,821-square feet, which still
exceeds the minimum required of 3,649!square feet. The applicant is
installing bollards around the fire hydrant ~md fire department connection
(FDC) located across the drive from the dtlmpster in order to prevent any
damage from a track backing into them. The 6' 11" brick enclosure and
metal-panel gate will match the brick color Of the building.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff recommends APPROVAL of the Natches T~ace Addition, Lot 1, Block C,
Site Plan Revision, with no conditions.
Page 2 of 3
Item # 9
ALTERNATIVES
I)
2)
3)
4)
Recommend approval of the request
Recommend disapproval of the request
Recommend modification of the request
Take under advisement for reconsideration at a later
ATTACHMENTS:
1)
2)
3)
Site Plan Revision
Landscape Plan Revision
Dumpster Plan
Page 3 of 3
Item # 9
date.
I
REVISIqNS
ZONE I REVI DESCRIPTION I DATE APPROVED
SERV1CE PROV1DER CITY OF COPPELL: WASTE MANAGE~4ENT 972-3~5-5400
I
(2) 4" DIAl BOLLARDS 0
-- - )' 18"X24"DEEP PERIME1ER BEAM WIT~I #3'S 0 56' O.C.
.......... ~ 2 LA'~RS OF
4×B×~6
CMU
PAINTED
TO
~ BRICK TO MATCH MATCH S1]JCCO
.~ BUiLDiNG24.. NO BRICK LEDGE
L ] TIES 0 O.C.F-- _ 6" ~HICK 5000 PSI
............ HOR,ZO.,AL'Y A.B
EVERY OTHER COURSE
-- - F ' VERI~CALLY
NO BRICK LEDGE (TYP)
__ 6" THICK 3000PS~ CONCRETE
WITH #4'S e 12" OC EA. WAY (TYP) ~
'~ . ~ #4% W/#2 I~ES ~ 24" O.C.
[ 1 BRICK SHALL BE:
I 'I LAKEWOOD BRICK COMPANY ''
TO MATCH BUILDING 18"
J METALS PAINTED: SW. 2066
NANTUCKET DUNE (TO MATCH
PR(VIOE #3 VER~ICAL~ 56" O.C MAX.
%x : I C.C. PACKET
~,,, '!~/,",. ,~ 'TOWN CENTER '
Revised ~,
~Y ~,'
:; ,~;/ DUMPSTER ENCLOSURE
SLI DESIG~-~-~ SIZE FSC~ NO. BW6 NO.
REVISI+S
SERVICE PROVIDER CITY OF COPPELL: WASTE MANAGEI~IENT
9721315-5¢00
PAIR OF PREFINIS~iED METAL PANEL
DOORS
COLOR TO MATCH!SIMILAR TO BRICK ON
BUILDING
~ PAINT POST-UPS iAND HINGES TO MATCH
EXISTING STUCCO ~
SUPPORT AS REO~JIRED
BRICK SHALL BE:
LAKEWOOD BRICK COMPANY
RED GRAIN KING SIZE
ELEVATION TO MATCH BUILDING
METALS PAINTED: SW.2066
NANTUCKET DUNE (TO MATCF
-- END BRICK WITH PARGIN~ AT CAP BUILDING
BRICK TO MATCH BUILDII~G ON 5-5/8" CMU BACKER
50 COURSES MODULAR ~-- LIMESTONE WI~H WHIT ~AND
BRICK MORTAR MIX
(011COURSE ENO BRICK
COURSES CMU BACKER) 5" DIA POST-UP FOR D~TE
SUPPORT. PAINTED TOM~ATCH
-- STUCCO ON BUILDING '
ELEVATION
END BRICK WITH PARGING AT CAP ~ 50 COURSES MODULAR
BRICK
1 COURSE ENO BRICK
(10 COURSES CMU BACKER)
30 COURSES MODULAR
BRICK ELEVATION
1 COURSE END BRICK
(10 COURSES CMU BACKER)
PROVIDE ~5 VERTICALO 56' O.C MAX.
PROVIDE HORIZONTAL MESH AT EVERY OTHER
lCA, ,C°URSE' ,NTERLOC 7 : E5
'~ -~ TOWN CENTER ANK L
" DUMPSTER ENCI~OSURE
SIZE FSCM NO. DWG INO. REV
SLI DESIGN, INC