Loading...
DRC commentsCOPPELL Project ID PD-05-0031 Address CITY OF COPPELL DRC REPORT Proiect fl Proiegt Type ADDliCation Date Case Manaeer Pr0iect Descrietion Re-Zoning PD 7119/2005 Gary Sieb Zoning change request from PD-186R2-LI (Planned Developrnent-186 Revisior (Planned Development-186 Revision 7-Light Industrial), to attach a Detail Site F construction of a 142,247-square-foot building on Lot 8 and a 93,345-square-fo Agency Building Inspection Electric and Gas Engineering Fire Administration Parks and Recreation 1 of 2 Reviewed By Review Date Commenl Greg Jones 712712005 1~ No ca Jeff Curry 7/27/2005 Zoning £ Ken Griffin 7/28/2005 Detailed 1. Show along Be the stare turn bay,' 2. Show Pkwy. 3. No m( shown) t you requ 4. Ensur 5. Ensur constru~ construc escrow ~ Hike & E Tim Oates 7/26/2005 1. Fire h relocate, collapse 2. Show and Wa1 3. FDC ~ side of ti 4. Indic~ outside ~ 5. FD wi Bethel, I betweer John Elias 7/22/2005 No com~ COl'FELL PD-186R7-LI, Duke-Freeport 2-Light Industrial) to PD-186R7-LI lan to Lots 8 and 9, to allow the )t building on Lot 9, totaling lments ~ange acceptable ~ite Plan he bands of stamped concrete at entryways :hel Road and Freeport Parkway, as well as )ed concrete in the median noses in the left on Freeport Pkwy. 'elocation of the light standards on Freeport dian openings are currently proposed (or ) serve any of the drives on Bethel Rd. Are ~sting any? ~ the proposed sidewalks are ADA compliant. : that adequate right-of-way is provided for the tion of the 8' Hike & Bike trail. Cost of ion of a 5' sidewalk should be placed in ,ith the City and will be used to construct the ike trail. ,drant along west fire lane needs to be I to the west side of the fire lane, out of the zone. Fire Department Connection (FDC) on Site .=r plans. ~ust be within 50' of fire hydrant and on same le fire lane. ~e turning radii in fire lane. 30' inside, 54' equired. I need at least one median opening on ,refer middle one that leads to fire lane the buildings. nents. COPPELL Agency Planning Department Reviewed By Gary Sieb CITY OF COPPELL DRC REPORT Review Date 7/22/2005 SITE PL/~N 1. Verify other 16.! 2. Dimer drives. 3. Add s, building f 4. Label corner of 5. Indica and dish 6. Show somethi~ 7. Too n Site Pla~ 8. Zonin 9. Consi building ~ 10. Char 11. Nee( yard lot I COP'FELL ~creage. One plan shows 15.51 acres, the , acres. sion widths of Bethel and Freeport access luare footage of each builidng within )otprint. and dimension (I,w,h) screen wall at NE 93,000 sq. ft. building. e building setbacks from Freeport and Bethel nce between buildings. future parking with dashed lines, grey tone, or similar. uch info. shown on Bethel Road; emphasize data, not Bethel Road. I is PD 186-R7-LI. ~er repeating SEcorner design of 93,000 NE end facing Freeport. ge lots to 2 R1 and 2 R2. ten foot landscape area between two side riss. EXISTIN~ TREE PLAN 1. Any nped for tree relocaion legend? 2. Need for note #7 seems redundant if no trees on this plan iare relocated. LANDS( 1. All need to LANDS( 1. Tabu shows 4 APE SITE PLAN sn space dimensions (widths, lengths, etc.) )e CLEARLY shown. :APE PLAN ations list show 3" caliper trees; Plant List ' trees--which is right? 2. PleaSe remove from second sheet shading of median ~nd NE corner of Freeport. 3. Indicate species of trees along N boundary line on second,beet. 4. Nee(~ ten foot landscape area between two side yard lot lines. ELEVA' 1. How of them' 2. Mor~ fenestr; 3. Inve: 93,000 4. Wel althoug 5. Ren' 'IONS do dock doors work if parking is located in front detail is needed on building, i.e. accents, [ions, indentations, reveals, etc. ~tigate possibility of repeating SE corner of ~q. ft building at NE corner. ,resume buildings are "clones" of each other, ~ not clear from exhibits. ember color boards, materials list, etc. will be require~. COPPELL Proiect ID PD-05-0031 Address CITY OF COPPELL 2nd DRC REPORT Project Na~me COPPELL PD-186R7-LI, Duke-Freeport Proiect Type Application Date Case ManaRer Project Description Re-Zoning PD 7/19/2005 Gary Sieb i Zoning change request from PD-186R2-LI (Planned Development-186 Revisionl 2-Light Industrial) to PD-186R7-LI Planned Development-186 Revision 7-Light Industrial), to attach a Detail Site l~lan to Lots 8 and 9, to allow the construction of a 142,247-square-foot building on Lot 8 and a 93,345-square-fo~t building on Lot 9, tota ng Agency Engineering 1 of 1 Comments 1. The cost of construction of the 8' sidewalk shoul( be used to construct the Hike & Bike trail. be placed in escrow with the City and will