Loading...
CC approval on 4/12/05AGENDA REQUEST FORM COPPELL DEPT1 Planning DATE~ April 12, 2005 ITEM ~: 14 ITEM CAPTION: Consider approval of the Beltline Trade Center, Lot 1, Block 1, Site Plan, t~ allow the development of an approximate 375,000-square-foot warehouse distribution building on 27.075 acres of property located along the north side of Beltline Road, approximately 1,000 feet east of North Lake Drive. GOAL(S): APPROVED BY CITY COUNCIL ON ABOVE DATE Motiori to Approve subject to conditions 1, 3 & 6 below M - Sqhy S - Fa0ght Vote -i6-0 York a~bsent EXECUTIVE SUMMARY: Date of P&Z Meeting: March 17, 2005 Decision of P&Z Commission: Approval (6-0) with Commissioners Foreman, Kittrell and Reese voting in favor. None opposed. Commissi Approval is recommended, subject to the following conditions: 1) 3) 6) Borchgardt, Hall, McCaffrey, oner Milosevich was absent. Show and label all fire hydrants on Site Plan and reconfigure Fire Department connection locations to the satisfaction of the Fire Department. r~; ....; ..... ;ink ~c-~.~.; .......... c;,~ m~- (CONDITION MET) Beltline Road median alterations must be approved by the City of Dallas. ~ (CONDITION MIT) Compliance with Engineering comments (attached). Staff recommends approval. Agenda Request Form - Revised 09/04 Document Name: ~6BLTC, SP 1-AR CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: Beltline Trade Center, Lot 1, Blk. 1, Site Plan P & Z HEARING DATE: C.C. HEARING DATE: March 17, 2005 April 12, 2005 STAFF REP.: Gary L. Sieb, Planning Director LOCATION: North side of Beltline Road, approximately 1,000' east of North Lake Drive. SIZE OF AREA: 27.072 acres of property CURRENT ZONING: REQUEST: LI (Light Industrial) Site Plan approval to allow the deqelopment of a 375,000-square- foot warehouse distribution building,i APPLICANT: Owner: Industrial Dev. Intemational 5420 LBJ Freeway Suite 1275 Dallas, TX 75240 (972) 546-2640 Fax: (972) 546-2650 Engineer: Goodwin/Marshall, Inc. Edward Eckart, P.E. 2405 Mustang Dr. Grapevine, TX 76051 (817) 329-4373 Fax: (817) 329-4453 HISTORY: In October of 2000, City Council al~Proved a Preliminary Plat and a zoning change from LI (Light Indgstrial) to PD-189 to allow the development of an indoor basketball/recreational facility (referred to as "Hoop Town") on 17 acres of fids 27-acre site. In December of that same year, Council approvec~ an amendment to the PD to enlarge the recreational site by approximately .7 of an acre to better address tree mitigation issues. 3?he zoning was never legally Item # 11 Page 1 of 3 changed, the plat was never filed, ~d the project was never built. Today, the property retains its Light Industrial zoning classification. TRANSPORTATION: Beltline Road is a P6D, six-lane Idivided thoroughfare built to standard within a 120-foot right-of-'qay. SURROUNDING LAND USE & ZONING: North -Railroad, Creekview Add.. LI (Ligh~ Industrial) and PD-104- SF-9 South - North Lake, City of Dallas ~ East - TXU Electric and Gas right-of-way; ILl (Light Industrial) West - Vacant; LI (Light Industrial) COMPREHENSIVE PLAN: The Comprehensive Plan o4 May 1996 shows the property as suitable for light industri~ uses. DISCUSSION: Page 2 of 3 As outlined in the HISTORY section of th recreational use activity planned for this I half years ago. For a variety of reasons, ~ and the property is still vacant. It ret~ classification and the current applicant is p~ the Comprehensive Plan. One 375,000-sr requested by Industrial Development Iuten has constructed a number of similar build project in the City is the DFW Trade Cente and shared with the City of Grapevine. s report, there was a proposed roperty roughly four and one- ~ose plans failed to materialize, tins a Light Industrial zoning oposing a use recommended by aare-foot warehouse building is ational (IDI), a company which ngs in Coppell. Their biggest located northwest of S.H. 121 This particular building is typical of our {urrent inventory of warehouse buildings and appears to meet most provis}ons of our ordinances. Where discrepancies have been found, appropriatelcorrective comments have been made, as reflected in the conditions for approval section of this report. The proposal retains a number of trees on provides a detention pond to control water at code. The design of the building is structures, and the elevations approach t Ordinance. The Landscape Plan meets om Item # 11 the northern portion of the site, runoff and is providing parking ypical of our large warehouse ~e requirements of the Zoning standards. Plan discrepancies include a need to show ~nd label fire hydrant locations on the Site Plan, as well as fire depart~aent connections. Also, the applicant needs to dkmension the width of @arking spaces. Beltline Road median alterations must be approved by the City of Dallas. The Site Plan and Landscape Plan need to reflect a builOing footprint identical to the building's design, including the articulated l~ortions of the structure. With regard to articulation, it appears that the ~rchitect has added articulation elements along Beltline Road, but there is some question whether the 100- foot maximum spacing has been met. Fu~'ther discussion at the public hearing will clarify staff concern regarding this point. The Engineering Department has some concerns with this proposal but feels additional conversations will resolve those concerns. A condition of approval is compliance with Engineering comments. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends APPROVAL of this request, subject to the following conditions: 1. Show and label all fire hydrants on Site Plan and reconfigure Fire Department connection locations to lthe' satisfaction of the Fire Department. 2. Dimension width of parking spaces o~ Site Plan. 3. Beltline Road median alterations mu~t be approved by the City of Dallas. 4. Site Plan and Landscape Plan need t~ reflect a building footprint in compliance with the building design. 5. Clarify building articulation design dimensions. 6. Compliance with Engineering comme,ts (attached). ALTERNATIVES 1) 2) 3) 4) Recommend approval of the request Recommend disapproval of the request Recommend modification of the request Take under advisement for reconsideration at a late~ date. ATTACHMENTS: 1) Site Plan, Landscape Plan, Tree Survey/Plan, Perspective Drawings 2) Departmental comments (Fire Administration & Engineering) Item # 11 Page 3 of 3 COPPELL Proiect ID SPA-05 0007 Address E Bell Line Rd CITY OF COPPELL 2nd DRC REPORT Project N~me COPPELL eeltline Trade Center, Lot 1, Block 1 Proiect Type Application Date Case Manaqer Proiect Description Site Plan Approval 2/15/2005 Gary Sieb To allow the development of an approximate 375,000~square-foot warehouse dis~bufion building on 27.072 acres of properb/. Agency Fire Admin Engineering 1 of 1 Comments 1. FDC configuration is not correct. Install in accordance with NFPA and City of Coppell standards Preliminary Utility Layout: 1. Additional fire hydrants are needed to meet minimum S{pacing (300' min. along fire lane). 2. Overall design of water will be reviewed in greater detail during plan review~ 3. You will need permission from DART to work within their easement to install the 8" sanitary sewer. - Additional requirements may be identified during full engineering plan review. :/ "I~ ~., z ~Oo<x~L~ o~, o~ lid Ii! tti!, ~i ti il!, !I, lillli lliill lib Iil !t ;: ! I Ld