DRC commentsDEVELOPMENT REVIEW COMMITTEE FIRE PREVENTION cOMMENTS ITEM: PSINET ADD1TION LOT1,BLK1 REPI~ T DRC DATE: January 27, 2000 CONTACT: TRAFIS CRUMP, FIRE MARSHAL 972.30~.3.503 COMMENT STA TUS: .~"~'~ ~' r ] PRELI~IlNAR Y.. . -, ..-. 1. Additional fire protection requirements may be required for[this project. However, the basic layout as submitted is acceptable. PSINet is aware of the possibility of additional fire requirements, which will be addressed during the permit review process. DEVEL OPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PSINet Addition, Lotl, Block 1, Replat and Site ~lan Review, request to replat Lot 2, Block B of Northlake 635 Business Park iand to amend the site plan to allow for the construction of a 20,120 square fo~t enclosed service yard to the ~risting building and reconfiguration of the par~ng spaces on property located at the southeast corner of Crestside and Lake 33hore Drives, at the request of Pacheco Koch Consulting Engineers. DRC DA TE: January 2 7, 2000 and February 3, 2000 CONTACT: Mike Martin, P.E., Assistant Ci{v Engineer (97~-304-3679) COMMENT STATU$: PREL!!.I!NAR Y No comments. City of Coppdl Development Review Committee Cotangents Planning Department HOSTING CENTER, SITE PLAN REVIEW! DRC Date: January 27, 2000 planning & Zoning Commission Meeting: February 17, 2000 City Council Meeting: March 14, 2000 Need to define the "data center" use for the property. All paving and landscaping was installed with initial development, however, the future parking spaces were not striped as such. Need to verify parking calculations site plan (i.e. wes~ side of building 54 spaces are drawn, but 52 are labeled). One space per 300 squ~re feet is the MIM1NUM required, it appears (subject to verification) that the ra~io being provided is approximately 1 space per 271 square feet for the dat~ center and 1 space per 300 square feet for the office. These calculations are net Of the additional building/service area. Verify that 5,510 square feet additional building with ~'oof (generators) and the remaining 14,610 "service yard" will not be a roofed ~tructure. Elevations indicated that the 20 foot wall will be of the same materials and colors as the existing building. It is recommended that the exterior ~rick veneer finish be extended to a portion of the south elevation, due to view from street and abutting property. What are the heights of the mechanical equipment wilhin the service yard area? Previous City Council action approved this site plan s~bject to the Board of Adjustment granting a variance reducing the number Of loading spaces from the required 4 to 2. This variance was never pursued because the building was never occupied..The current site plan indicates relocating ope loading space to the east side of the fire lane, across from the service yard, and~,adding two additional spaces, along the west side of the building, for a total 0f4 loading spaces. However, these spaces are not adjacent to the existing "loading doors" along the south side of the building. Landscaping Analysis: · Need analysis of the plant materials, landscaped a~d paving areas being removed for the service area, and specify where tl~e landscape materials are to be replaced. · Landscaping to remain appears to reflect approve~i landscape plan and currently exists. DEVELOPMENT REVIEW COMMITTEE FIRE PREVENTION COMMENTS ITEM: PSINET ADDITION LOT 1,BLK 1 REPI~AT DRC DA TE: January 27, 2000 CONTACT: TRA VIS CR UMP, FIRE MARSHAL 972.304.3503 COMMENT STATUS: PRELI~IINAR Y 1. These plans have not been checked to verify compliance with applicable codes regulating storage of hazardous, flammable or combustible liquids and solid*. Additional requirements such as access, spill control, fire protection and occupancy separations nay be required. In addition, the layout as shown may not be allowed under existing codes and ordiaances. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PSINet Addition, Lotl, Block 1, Replat and Site ~lan Review, request to replat Lot 2, Block B of Northlake 635 Business Park iand to amend the site plan to allow for the construction ora 20,120 square fo~t enclosed service yard to the existing building and reconfiguration of the parlding spaces on property located at the southeast corner of Crestside and Lake ~hore Drives, at the request of Pacheco Koch Consulting Engineers. DRC DA TE: January 27, 2000 and February 3, 2000 CONTACT: Mike Martin, P.E., Assistant City Engineer (97~-304-3679) COMMENT STATU$: /PRELIMfNARY ] ~ T~ IU T T T'~ IZ;' ID AFTER P&Z I. Depending on the use of the proposed addition, impact fees may be required. JAN DEVELOPMENT REVIEW COMMITTEE BUILDING INSPECTION COMMENTS DRC DATE: Jan 27, 2000 CONTACT: ~;,~ C OMMI~PI' S TA TUS: City of Coppdl Development Review Committee Comn~nts Planning Department PSINet ADDITION, LOT 1 BLOCK A REPLAT OF NORTHLAKE BUSINESS CENTER ADDITION, LOT 2 BLO(~K B (HOSTING CENTER}~ DRC Date: January 27, 2000 Planning & Zoning Commission Meeting: City Council Meeting: March 14, 2000 February 17, 2000 The purpose of the plat is to relocate a fire lane easen~ent to accommodate the building addition and service yard. All existing easements appear to be reflected on the replat. There are slight discrepancies in the total square foot~ge, and the distances and bearings in this replat and the original Lot 2, Block Blofthe Northlake 635 Business Center Addition Note: A. Co Please revise plats, site plans, landscape plans, and building elevations based on staff recommendations. Should applicant disagree with staff cotangents please provide reasons why staff recommendations should not be followed when you arterial the February 3rd Development Review Committee (DRC) meet'mg. Each applicant will bring one new set of revised plals a~d plans to the February 3rd DRC meeting. Applicants will be asked to show, explain and defend any revision. An Engineer for the project or other representative is urged to attend the meeting. Applicant will have till noon Tnesday, February 8th to resub~nit eighteen (18) folded copies of revised plans and three (3) reduced paper copies (8 1/2 X 11~ of each exhibit to the Planning Depa~ment TXU TXU Electric & Gas 4200 North Belt Line Irving, TX 75038 Comments for City of Coppell Development Review Committee January 27, 2000 PSINet Addition, Lot 1, Block 1, Replat and Site Plan Review TXU may need more easements added to plat. We are waiting for our planning department's recommendation on serving this property and other properties in the area. Please call Rick Fielding at 972-888-1344. DEVELOPMENT REVIEW COMMITTEE LEISURE SERVICES COMMENTS ITEM: PSINet Addition, Replat & Site Plan Review DRC DATE: January 27, 2000 and February 3, 2000 CONTACT: Brad Reid, Park Planning and Landscape Manager COMMENT STATUS: PRELIMINARY P~!~$ED No Comments JANI 2 e 2000 DRCO127m DE VEL OPMEN T RE VIEW COMMITTEE ENGINEERING COMMENTS ITEM: PSINet Addition, Lotl, Block 1, Replat and Site ~lan Review, request to replat Lot 2, Block B of Northlake 635 Business Park and to amend the site plan to allow for the construction of a 20,120 square fobt enclosed service yard to the existing building and reconfiguration of the parging spaces on property located at the southeast corner of Crestside and Lake 2~hore Drives, at the request of Pacheco Koch Consulting Engineers. DRC DA TE: January 27, 2000 and February 3, 2000 CONTACT: Mike Martin, P.E., Assistant City Engineer (97~-304-3679) COMMENT STATUS: .'"REVISED AFTER P&Z No comments.