Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
SP attached to 10/11/05 CC pckt
!8' Existing Zoning: Proposed Zoning: Covered Bldg Area: Proposed Use: Max. Students Lot Area; Lot Coverage: Bldg Ht AFF CC_ Mid-Span Bldg Ht AFF @ Ridge C - Commercial C- S,U.P. 11,702 sf ,' max. Montessori School 120 1.680 Acres 15,99% 21'-10" 33'-0" Parking required: (1/10 Students) Parking Provided: Standard Handicap 'Total Stacking required: (1/10 Students) Stacking Provided: Standard As Parking Spaces Total 12 spaces 28 spaces 2 spaces 30 spaces 12 spaces 10 spaces 2 spaces 12 spaces Half Day 18 +/- Full Day 42 +/- Extended Day 60 8:15 AM - 8:45 AM 8:15 AM - 8:46 AM 7:00 AM - 8:00 AM 11:30 AM - 11:45 AM 2:45 PM - 3:00 PM 5:00 PM - 6:30 PM Note: Two attendants will always assist with Drop-Off to expedite traffic flow. No cars will be allowed to park in stacking lane during Drop-Off times, Existing Student Capacity 120 Parking required: 20 spaces Expansion Student Capacity 72 (1/10 Students) Total Student Capacity Building Area: Proposed Use' Parking Provided' Standard Handicap Total Lot Area: Lot Coverage' Bldg Ht AFF @ Mid-Span Bldg Ht AFF @ Ridge 192 15,020 sf Montessori School 1.680 Acres 20.52% 21'-10" 33'-0" Stacking required: (1/10 Students) Stacking Provided: Standard As Parking Spaces Total 28 spaces 2 spaces 30 spaces 20 spaces 10 spaces 10 spaces 20 spaces "OLD NOTE: '"!ONb~EN' b MONTESSORI Academy 136 Fitness Court CA.~TSTC,N_ MON~,'~_NT ,SIGN ,//'- ~CCENT ~ET/&IL -- SO,ALE: N 'T.,~. II E_ 0 Q 6 NO.TN ~A E NT,., 4<;2 xiO ,:.~r~.~ -9_ b Ld LL lit 1 / Z '~ '-- = 20 -G = :0.20 ADD lION ~ ~~- ~ 1 Iz ARKI ~, /' , ARCHITECTURE P~NNINO CONSTRUCTION ZOZ0 LBJ FRWY, STE 700 DALES, TEX~S 75234 214-722-75~5 REVISIONS P~. No. ~INT P~N D~ ~: CHECKED ~UE SHEET Ho.