CC approval on 2/14/06AGENDA REQUEST FORM
COPPELL
DEPI~: Planning
DATE: February 14, 2006
ITEM#: 12
ITEM CAPTION:
PUBLIC HEARING:
Consider approval of the Northlake 635 Business Park, Lot 2R, Block C (Coppell Business Center III), Replat, to
allow the construction ora 14,545-square-foot office building on 1.51 acres of property located along the west side
of Lakeshore Drive, approximately 677 feet south of Wrangler Drive.
M~)tion to close Public Hearing &
Al~prove subject to condition 1
below
APPROVED BY
CITY COUNCIL
ON ABOVE DATE
GOAL(S):
York
Peters
V<~te - 7-0
· Libby Ball
EXECUTIVE SUMMARY: -o~.oo.
Date of P&Z Meetina: January 19, 2006
Decision of P&Z Commission: Approval (7-0) with CommissionersiBorchgardt, Hall, McCaffrey,
Foreman, Haas, Kittrell and Reese voting in favor. None opposed.
Approval is recommended, subject to the following condition:
1) Comply with attached Engineering comment sheet.
Staff recommends APPROVAL.
Agenda Request Form - Revised 09/04 DOcument Name: ~6NL635BP Replat I-AR
CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE: Northlake 635 Business Park~ l~ot 2R~ Block C~
(Coppell Business Center III) Replat
P & Z HEARING DATE:
C.C. HEAR1NG DATE:
January 19, 2006
Febmary 14, 2006
STAFF REP.:
Matt Steer, City Planner
LOCATION:
Along the west side of Lakeshore Drive, approximately 677 feet
south of Wrangler Drive.
SIZE OF AREA:
CURRENT ZONING:
REQUEST:
APPLICANT: Architect
HISTORY:
1.51 acres of property
LI (Light Industrial)
Replat approval to allow the constr
office building.
Carroll Architects
17770 Preston Rd., Suite 200
Dallas, Texas 75252
Phone: (972) 732-6085
Fax: (972) 732-8058
The plat for this property (Lots 1
April 2000. A Site Plan was also
been developed. There has been no
action of a 14,545-square-foot
Engineer
Pacheco Koch Consulting Engineers
8350 N. Central Expressway, Suite 1000
Dallas, Texas 175206
Phone: (972) ~ 35-3031
Fax: (972) 231 -9544
2, Block C) was approved in
proved for Lot 1 and has since
evelopment activity on Lot 2.
Page 1 of 2
Item # 10
TRANSPORTATION:
Lakeshore Drive is a C2U, two-lan{
right-of-way.
undivided road built in a 60'
SURROUNDiNG LAND USE & ZONiNG:
North - Office/Warehouse facility; LI (LighI Industrial)
South - Office/Warehouse facility; LI (Light[Industrial)
East - Office/Warehouse facility; LI (Light I~dustrial)
West - Office/Warehouse facility; LI (Light Industrial)
COMPREHENSIVE PLAN: The Comprehensive Plan of May
suitable for light industrial and sho~
DISCUSSION:
This is the companion request to the Site
Easement along Lakeshore, a 24' Fire Lan,
in front of and to the side of the propose,
Easement along the west property line are p
plat. The existing 7.5' Drainage Easem
Easement along the northern property line
1996 shows the property as
room type uses.
'lan just heard. A 20' Utility
and Mutual Access Easement
structure and a 20' Drainage
· oposed to be dedicated by this
mt and 10' Sanitary Sewer
will remain. All and all, the
Replat is in good order and appears suital~le for staff support, provided
certain conditions elaborated on below are t~llowed.
RECOMMENDATION TO THE PLANNiNG AND ZONING COl
Staff is recommending APPROVAL of the Replat for NoJ
2R, Block C, (Coppell Business Center III), subject to the
4MISSION:
thlake 635 Business Park, Lot
following conditions:
1) Contact Larry Redick at (972) 323-8917 to discuss easement requirements.
2) Change reference to plat within signature b~ocks to read "Northlake 635
Business Park, Lot 2R, Block C (Coppell Business Center III).
3) Comply with attached Engineering comment sh
ALTERNATIVES 1) Recommend approval of the request
2) Recommend disapproval of the request
3) Recommend modification of the request
ATTACHMENTS: 1) Plat
2) Engineering Corrnnent Sheet
Page 2 of 2
Item # 10
:et.
COPPELL
Proiect ID RP-05-0065
Address
Project Type
Application Date
Case Manager
Project Descriotion
Agency
Engineering
CITY OF COPPELL;
2nd DRC REPORT
Project N; me
Replat
12/20/2005
Matt Steer
To allow the construction of a 14,545-square*foot office building
1 of 1
Comments
Grading and Drainage Plan ~
1. The surface drainage from drainage area 1 shot~ld
flow and convey it to the storm drain system on sit~.
Landscape Planting Plan, LPI.1 ~
1. Trees should not interfere with the sanitary sewer.
Additional comments may be generated upon deta
COPPELL
No~hlake 635 Business Park (CBC III 2R)
not sheet flow to the street. Pick up this
led engineering review.
=~AIBO 3~OHS~V7