DRC commentsCOPPELL
Project ID RP-05-0065
Address
CITY OF COPPELL
DRC REPORT
Project N{ame
COPPELL
Northlake 635 Business Park (CBC Ill 2R)
ProjectTvpe
Application Date
Case ManaAer
Project DescHpfion
Replat
12/2012005
Matt Steer
To allow the construction of a 14,545-square-foot office building
Agency
Building Inspection
Electric and Gas
Engineering
1 of 1
Reviewed By Review Date
Jeff Curry 12/29/2005
Charlene La Mattina 12/29/2005
Plat unaCCeptable. Please contact Larry Redick at
972-323-1~917 to discuss easement requirements.
Plat
1. A 20' d~'ainage easement should be provided for the
drainageistructure along the western edge of the
property.
2, Provid~ a 20' easement for the fire hydrant nearest
to Lakesllore Drive.
Grading ~nd Drainage Plan
1. The su~ace drainage from drainage area 1 should
not sheetiflow to the street. Pick up this flow and
convey itlto the storm drain system on site.
Water an~ Sanitary Sewer Plan
1. Show t~e fire lane on this sheet.
2. The fir~ hydrant located in the parking island on the
south si(~e of the building is private and should be
served a~er the DDC. (The fire hydrant nearest to
Lakeshor~ Drive is public and should be within an
easemen[)
Landscal~e Planting Plan, LP1.1
1. Trees J~hould not be planted in the sanitary sewer
easemeni.
Fire Administration Tim Oates 12/30/2005
Parks and Recreation John Elias 12/22/2005
Planning Department Matt Steer 12/29/2005
Additional comments may be generated upon detailed
engineering review.
Fire lane~turn radii to be 30' inside, 54' outside.
No comn~ents
1. Renar~e all plans to "Northlake 635 Business Park
(Coppell ~usiness Center III, Lot 2R, Block C)."
2. Remo~e Volume and Page label.
3. Remo'~e old building setback lines and include alt
new required setbacks (60' front yard setback with
parking and 10' side and rear).