Loading...
DRC commentsCOPPELL Project ID RP-05-0065 Address CITY OF COPPELL DRC REPORT Project N{ame COPPELL Northlake 635 Business Park (CBC Ill 2R) ProjectTvpe Application Date Case ManaAer Project DescHpfion Replat 12/2012005 Matt Steer To allow the construction of a 14,545-square-foot office building Agency Building Inspection Electric and Gas Engineering 1 of 1 Reviewed By Review Date Jeff Curry 12/29/2005 Charlene La Mattina 12/29/2005 Plat unaCCeptable. Please contact Larry Redick at 972-323-1~917 to discuss easement requirements. Plat 1. A 20' d~'ainage easement should be provided for the drainageistructure along the western edge of the property. 2, Provid~ a 20' easement for the fire hydrant nearest to Lakesllore Drive. Grading ~nd Drainage Plan 1. The su~ace drainage from drainage area 1 should not sheetiflow to the street. Pick up this flow and convey itlto the storm drain system on site. Water an~ Sanitary Sewer Plan 1. Show t~e fire lane on this sheet. 2. The fir~ hydrant located in the parking island on the south si(~e of the building is private and should be served a~er the DDC. (The fire hydrant nearest to Lakeshor~ Drive is public and should be within an easemen[) Landscal~e Planting Plan, LP1.1 1. Trees J~hould not be planted in the sanitary sewer easemeni. Fire Administration Tim Oates 12/30/2005 Parks and Recreation John Elias 12/22/2005 Planning Department Matt Steer 12/29/2005 Additional comments may be generated upon detailed engineering review. Fire lane~turn radii to be 30' inside, 54' outside. No comn~ents 1. Renar~e all plans to "Northlake 635 Business Park (Coppell ~usiness Center III, Lot 2R, Block C)." 2. Remo~e Volume and Page label. 3. Remo'~e old building setback lines and include alt new required setbacks (60' front yard setback with parking and 10' side and rear).