Loading...
PG-208R-LI, CTC-CS 06 0721 c.. \ -. "'t C> F corrELL ..-~__ ~".,.' 1..:....., L", , -'G ""i;',,,,;,~. "';!,/k~_ _.I <-,p~' _,:"'41<~,'r;"h, ,~:~ -'I' {J ;:.4/~~'~'-- '-f ,-~'>l.;;5...~ '''!/ >~ -1- "~',L~ ...:-'.:>~'-...? \'l I '" ~'fr' >i~ '"r 1.\ q .~ ,', \ e July 21, 2006 Mr. Brian Degravelle Merriman Associates/Architects 300 N. Field Street Dallas, Texas 75202 RE: Case No. PD-208R-LI, Coppell Trade Center Dear Brian: This letter is to inform you that PD-208R-LL Coppell Trade Center. zoning change request from PD-208-LI (Planned Development-208-Light Industrial) to PD-208R-LI (Planned Development- 208 Revised-Light Industrial) to approve Detail Plans for three office/warehouse buildings (Buildings A and B each containing approximately 150,500-square-feet and Building D containing approximately 117,737 square-feet) on approximately 27.8 acres of property located along the north side of Sandy Lake Road, between Northpoint Drive (extended) and the extension of Freeport Parkway, was recommended for approval by the Coppell Planning and Zoning Commission on Thursday, July 20, 2006, subject to the following conditions: 1) Include additional fenestration or window treatments along the south elevation of Buildmg 0 and the north end of Building B, and remove alternate elevations. 2) Comply with the attached Departmental Comment Sheet. 3) Tree Mitigation Fee in the amount of $120,000 was agreed to be paid in two phases of $60,000 each, payable prior to the issuance of e.0. for each phase, or in full within five years. Phase one tree mitigation was paid on 2/15/06. 4) On the Site Plan, Reference detail of monument sign as "See elevations Building D" in place of"RE: ll1A1.02." 5) Revise the floor area ratio to reflect the floor area of the building per same unit of si te area. 6) Revise inconsistencies in eastern fire lane easement shown on the plat and all other plans. /' ~~, P ~\ h' f-': 'l'v A Y' * f~ ;_) D () X q 4 70 * C () P PEL L T X 750 1 9 * TEL 972/462 0022 * FAX 972 I 3 0 4 3673 7) Rectify inconsistencies between what is shown in the landscape tabulations and the plant list (quantities and size). 8) Revise .perimeter landscaping note to read that one tree is required per 40 linear feet along Sandy Lake. The date scheduled for consideration by the Coppell City Council is Tuesday, August 8, 2006, at 7:00 p.m. A representative for this case must be present at this meeting, which will be held in Council Chambers at City Hall. Failure to represent this item may result in the denial of this application. City Council has instructed staff to include in its agenda packets only those items that accurately reflect conditions as recommended by the Planning and Zoning Commission. Therefore, please submit to the Planning Department two (2) folded copies of all revised plans, reflecting the above-mentioned conditions, on or before July 26, 2006. Also, please submit one ( 1) 8 V2 x II-paper reduction. along with one jpg, tiff, pdf or similar electronic file. If you have any questions, please contact the Planning Department at 972.304.3678. Sincerely, j C,.\C \. Z Marcie D(iamond, AICP Assistant Director of Planning c: Kenneth Newman, Holt Lunsford Commercial Building Inspection File