Loading...
PD-208R-LI, CTC - DRC 06 0622 (2) COPPELL CITY OF COPPELL ORC REPORT Proiect 10 Address PO-06-0027 THE.CITY.OF COPPELL Proiect Name Pd-208r-li, Coppell Trade Center Proiect Type Application Date Case Manaaer Proiect Description Re-Zoning PO 6/22/2006 Matt Steer Zoning change request from PD-208-L1 (Planned Oevelopment-208-Light Industrial) to PD-208R-L1 (Planned Oevelopment-208 Revised-Light Industrial) to approve a Detail Plans for three office/warehouse buildings Agency Building Inspection Electric and Gas Engineering Fire Administration Reviewed By Greg Jones Jeff Curry Charlene La Mattina Tim Oates 1 of 2 Review Date 6/28/2006 6/29/2006 6/29/2006 6/29/2006 Parks and Recreation John Elias 6/29/2006 Comments 1. No Building Inspection comments made (shells). Zoning change acceptable. No Comments. 1. Fire lane turning radii 30' inside, 54' outside. 2. Show all fire hydrants and fire department connections (FOC) on site plan. Fire hydrants to be spaced a max. of every 300' and must be within 3' to 6' of a fire lane. 3. FOC's must be within 50' of a fire hydrant and on the same side of the fire lane. 4. Show FOC locations on Utility plan. 5. Building "0" showing 8" FOC line tied into water line. FOC line not to exceed 6" and are not tied into water lines, they are dry pipe arranged for fire dept. use. 6. Automatic fire sprinkler rooms (fire pumps) shall be equipped with personnel doors with direct access to exterior of the buildings. 1. Tree Removal Permit is already in place for this project. 2. Per City Council Agreement: The Tree Mitigation Fee in the amount of $120,000 shall be paid in two phases of $60,000 each, payable prior to the issuance of C.O. for each phase, or in full within five years. Phase one Tree Mitigation was paid on 2/15/06. THE.e\TY Or:' COPPELL ~../."'.-. ~ .' *' ~ ? ~ ~ . q .t '" oS t 'lI Agency Planning Oepartment Reyiewed By Matt Steer THE.C:'TY.OF COPPE~L CITY OF COPPELL ORC REPORT Reyiew Date 6/29/2006 s Comments Site Plan: 1. Include land use and zoning information of adjacent properties. 2. Include symbols within legend. 3. Provide detail of monument sign on the Building "0" Elevation Sheet. 4. Include dimensions and extent of dimensions on Site Plan. 5. Show existing/proposed fire lane easements (don't include easements to be abandoned as indicated on plat). 6. Replace "Lot 1, Block 1" with "Lot 1 R, Block 1." 7. Site Plan title block should read- "Oetail Site Plan: Buildings "A, B & 0", Phases "II & III". 8. Revise the floor area ratio. 9. Include vicinity map and north arrow. 10. Revise inconsistencies in eastern fire lane easement shown on plat and on site plan. Landscape Plan: 1. Landscape Site Plan title block should read: Oetail Landscape Plan: Buildings "A, B & 0", Phases "II & III", and should be broken out the same way on the individual sheets. 2. Ensure all dimensions and labels are legible. 3. Include tree/shrub symbols within legend on each sheet. 4. Rectify inconsistencies between what is shown in the landscape tabulations and the plant list. 5. Reflect the correct perimeter tree requirement along Sandy Lake, which is one overstory tree every 40 linear feet, as this is a primary image zone. Elevation Sheets: 1. Recommend additional architectural details between entries on south elevation of Building "0". 2. Include monument sign details on Building "0" Sheet. 3. Include description of paint color in legend. 4. Remove labels indicative of tilt wall from the "Alternate East Elevation Entry". 5. On Building "B" elevations- change "West Elevation Entry" to "East Elevation Entry". 6. Provide color board with materials and rendering (or colored elevation) at ORC Meeting.