Loading...
Departmental comments THE.CiTY-OF THE.CITY.OF' COPPELL CITY OF COPPELL ORe REPORT COPPELL ..~*.. ~ 0 e )( . \ & q ~ 8 . ^ 8 Proiect 10 SPA-06-0074 Proiect Name Coppell/121 Office Park, Lot 3, Block 1 Address SH 121 Proiect Tvpe Site Plan Approval Application Date 12/19/2006 Case Manaaer Matt Steer Proiect Description To allow the development of an approximate 8,290 square-foot one-story office building 1 of 2 Agency Reviewed By Review Date Comments Building Inspection Greg Jones 12/28/2006 No Comments Received. Electric and Gas Jeff Curry 12/28/2006 No Comments Received. Engineering Ken Grffin 12/28/2006 1. Extend 8" waterline about 860' west of this lot and connect to existing 12" waterline. Fire Administration Tim Oates 12/27/2006 Utility Site Plan 1. Will the water line be a 'dead-end' at this property or looped to an existing line? Dead-end water lines not to exceed 150'. 2 Show double detector check valve vault and the 6-inch underground automatic fire sprinkler line from the main to the building. Parks and Recreation John Elias 12/28/2006 No Comments THE.CiTY.OF COPPELL ~ 8 Agency Planning Department Reviewed By Matt Steer THE.CITY.OF CITY OF COPPELL ORe REPORT Review Date 12/21/2006 COPPELL .~.. ~ ~ e Jt . \ & q ~ 8 . Comments Site Plan: 1. Delete the 4 shared parking spaces from the parking calculations on the Site Data Table. 2. Include the masonry wall, FDC and fire hydrant symbol in the legend. 3. Ensure calculations for impervious area and landscaping area calculations don't conflict. Landscape Plan/Tree Survey: 1. Provide exhibit depicting the three landscape areas with a different hatching for each area. 2. Sidewalks directly abutting a parking area should count in the square feet of parking area. 3. The 10' area shown directly abutting the shared drive with parking area is considered perimeter landscaping. 4. A tree is required at the end of each parking row. An additional tree is required at the end of each corner island. 5. Include legend showing symbol and tree type. 6. Ensure each category shows area required and area provided (perimeter, interior, nonvehicular). Elevations: 1. Include all building materials with colors and specifications (brick, awnings. quoins, etc.). 2. Sign areas should total 90 square feet for the entire building. Include dimensions of sign areas with sign materials and color. 3. Provide a color board with materials and color elevation at the Development Review Committee Meeting. 4. Show screening wall and dumpster enclosure details on elevations.