Loading...
CC letter of approval on 11/14/2006 THE.CITY.OF COPPELL November 15, 2006 Mr. Richard Calvert Calvert & Col Architects, Inc. 1001 W. Main Street Carrollton, Texas 75006 RE: Coppell Hei!~hts Addition. Lot 98 and Lot 9C. Site Plan Dear Mr. Calvert: This letter is to inform you that the Coppell Heights Addition, Lot 9B and Lot 9C, Site Plan, to allow the construction of two retail buildings, totaling 17,000 square feet, on 3.1 acres of property located south and east of the intersection of S. Beltline Road and E. Beltline Road, was approved by the Coppell City Council on Tuesday, November 14,2006, subject to the following conditions: 1. Contact Larry Redick at 972-323-8917 to discuss electric easement requirements. 2. FDC required to be detached from the building within 50' of a fire hydrant on the same side of the fire lanes. 3. Comply with the attached Departmental Comment Sheet. Please submit to the Planning Department two (2) copies of the revised Site Plan, Landscape Plan/Tree Survey and Circulation Plan on or before 12 noon Wednesday, November 29, 2006. For your information, this Site Plan is valid for a period of two years and will expire November 14,2008. If you have any questions, please contact the Planning Department at 972.304.3678. cIfi'Y' \;k ,-' ': t . (., parYlL. Sleb, .. .P. ?irector of Planning \ c: Jugat Rathee, Rathee Investments Building Inspection File 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/46?- 0022 * FAX 972/304 3673 CUYYcLL .~~.."*" ..... ~ 0 ~ q ..\' <"I .~ \ b CITY OF COPPELL 2nd ORe REPORT COPPELL ~...,."'-.. . .... ... r . _.__ 0 ~ q .t 1\ .c; \ {I, Proiect ID SPA-06-0053 Proiect Name Coppell Heights Addition, Lot 9b and Lot 9c Address 920 S Belt Line Rd Proiect Tvpe Site Plan Approval Application Date 9/20/2006 Case ManaQer Matt Steer Proiect Description to allow the construction of two retail buildings, totaling 17,000 square feet 1 of Aqency Engineering Comments 1. The Engineering Department will work with the developer on the proposed median opening design during the detailed design