Proiect 10
SPA-06-0068
Address Freeport Pkwy
Proiect Name Gateway Business Park No.3, Lots 1 and 2 Block
Proiect Tvpe Site Plan Approval
Application Date 11/21/2006
Case Manaaer Marcie Diamond
Proiect Description To allow the construction of an 114,81 O-square-foot, two story office building on Lot 1, containing 9.49 acres of
property and an 11 0,560-square-foot, two-story office building on Lot 2, containing 8.60 acres of land
Agency
Building Inspection
Electric and Gas
Engineering
Fire Administration
Reviewed By
Greg Jones
Jeff Curry
Ken Griffin
Tim Oates
1 of 2
Review Date
11/29/2006
11/30/2006
11/29/2006
11/23/2006
Parks and Recreation
John Elias
11/28/2006
Planning Department
Marcie Diamond
11/28/2006
Comments
1. No comments
No Comments Received
See comments under Replat.
1. FDC underground line required to be 6". See Eng.
Standards for buildings over 100,OOOsqft.
2. No floor plan submitted. Fire/Life Safety room shall
be a minmum of 96sqft, with a minimum dimension of
8ft.
3. Any plans for an emergency generator for either
building?
1. Tree survey should show protected trees only, no
crape myrtles or trees under 6"DBH.
2. Tree calculations on plan LS-3 are incorrect.
3. Tree Removal Permit will be required prior to start
of construction.
There are discrepancies between the site plan and the
landscape plan which need to be resolved, the deficits
on the landscape plan need to be addressed which
will require revisions to the site plan, including:
1. Parking islands, serving two rows of parking, are
required to be a minimum of 300 square feet, with a
minimum width of 9 feet. Most of the parking islands
appear to be significantly smaller than that.
2. A 10' landscape buffer is required along the north
property line, none is shown.
3. The Landscaped/Entry Feature area along the
mutual lot lines is different on the site plan and the
landscape plan., which is correct?
Other deficiencies in the Landscape Plan:
A. When an island serves two rows of parking, then a
tree is required PER ROW, only one tree has been
provided.
B. The one tree per 50 linear feet is not being
provided, on-site, along LBJ... as shown all trees are
within the public right-of-way.
D. Only indicate trees to be preserved on these two
lots.
E. Include Plat LisUScheduled Table as described on
the Landscape Plan Checklist.
F. Provide an elevation of the proposed decorative
light standards, and resolve the discrepancies in the
location of the light standards on the site and
THE.CITY.OF
COPPELL
!t"* """
" .
Agency
Reviewed By
THE.CITY.OF
CITY OF COPPELL
ORC REPORT
COPPELL
..~"*..
~ ~
~ ..t J'\ S . \ & q
Review Date
Comments
landscape plan.
G. Indicate the location of the proposed monument
sign.. is there a conflict with the proposed
landscaping?
H. The Fire lane needs to shaded and/or indicated
with a heavier line.
I. Need to provide a landscape screen around existing
transformer along 1-635
J. What is the "Vertical Element?" Also show on site
plan.
Site Plan:
A. The proposed monument sign exceeds maximum
required (60 sq. ft.).. needs to be redesigned an
provide additional details.
B. Show EXISTING monument sign on Lot 1.
C. QUESTION FOR STAFF: Will additional monument
sign be permitted on Lot 2?
D. The deficits on the landscape plan need to be
addressed which will require revisions to the site plan,
including:
1. Parking islands, serving two rows of parking, are
required to be a minimum of 300 square feet, with a
minimum width of 9 feet. Most of the parking islands
appear to be significantly smaller than that.
2. A 10' landscape buffer is required along the north
property line, none is shown.
3. The Landscaped/Entry Feature area along the
mutual lot lines is different on the site plan and the
landscape plan., which is correct?
E. Relocate the proposed dumpster from 1-635
frontage.
F. Enhanced paving is required on private property on
all driveways along Freeport Parkway.
G. Correct the spelling of Proposed on Site Data Table
Elevation:
Color rendering would be helpful
THE.CITY.OF
THE.CITY.OF
COPPELL
!l * -'" .
CITY OF COPPELL
2nd ORC REPORT
COPPELL
...~~ * fi~...
~ ~~~
c! ...t <'\.5 . \ e. q
Proiect 10
SPA-06-0068
Proiect Name
Gateway Business Park No.3, Lots 1 and 2 Block
Address Freeport Pkwy
Proiect Type Site Plan Approval
Application Date 11/21/2006
Case Manaaer Marcie Diamond
Proiect Description To allow the construction of an 114,81 O-square-foot, two story office building on Lot 1, containing 9.49 acres of
property and an 110,560-square-foot, two-story office building on Lot 2, containing 8.60 acres of land
of
Aqency
Engineering
Comments
No Comments