Departmental comments THE.CITY-OF COPPELL THE.CITY.O" CITY OF COPPELL ORC REPORT COPPELL .~- * ~~. r ;-~~ e ..t 4'\ 6 . \ ~ q .. s Proiect 10 SPA-06-0068 Address Freeport Pkwy Proiect Name Gateway Business Park No.3, Lots 1 and 2 Block Proiect Tvpe Site Plan Approval Application Date 11/21/2006 Case Manaaer Marcie Diamond Proiect Description To allow the construction of an 114,81 O-square-foot, two story office building on Lot 1, containing 9.49 acres of property and an 11 0,560-square-foot, two-story office building on Lot 2, containing 8.60 acres of land Agency Building Inspection Electric and Gas Engineering Fire Administration Reviewed By Greg Jones Jeff Curry Ken Griffin Tim Oates 1 of 2 Review Date 11/29/2006 11/30/2006 11/29/2006 11/23/2006 Parks and Recreation John Elias 11/28/2006 Planning Department Marcie Diamond 11/28/2006 Comments 1. No comments No Comments Received See comments under Replat. 1. FDC underground line required to be 6". See Eng. Standards for buildings over 100,OOOsqft. 2. No floor plan submitted. Fire/Life Safety room shall be a minmum of 96sqft, with a minimum dimension of 8ft. 3. Any plans for an emergency generator for either building? 1. Tree survey should show protected trees only, no crape myrtles or trees under 6"DBH. 2. Tree calculations on plan LS-3 are incorrect. 3. Tree Removal Permit will be required prior to start of construction. There are discrepancies between the site plan and the landscape plan which need to be resolved, the deficits on the landscape plan need to be addressed which will require revisions to the site plan, including: 1. Parking islands, serving two rows of parking, are required to be a minimum of 300 square feet, with a minimum width of 9 feet. Most of the parking islands appear to be significantly smaller than that. 2. A 10' landscape buffer is required along the north property line, none is shown. 3. The Landscaped/Entry Feature area along the mutual lot lines is different on the site plan and the landscape plan., which is correct? Other deficiencies in the Landscape Plan: A. When an island serves two rows of parking, then a tree is required PER ROW, only one tree has been provided. B. The one tree per 50 linear feet is not being provided, on-site, along LBJ... as shown all trees are within the public right-of-way. D. Only indicate trees to be preserved on these two lots. E. Include Plat LisUScheduled Table as described on the Landscape Plan Checklist. F. Provide an elevation of the proposed decorative light standards, and resolve the discrepancies in the location of the light standards on the site and THE.CITY.OF COPPELL !t"* """ " . Agency Reviewed By THE.CITY.OF CITY OF COPPELL ORC REPORT COPPELL ..~"*.. ~ ~ ~ ..t J'\ S . \ & q Review Date Comments landscape plan. G. Indicate the location of the proposed monument sign.. is there a conflict with the proposed landscaping? H. The Fire lane needs to shaded and/or indicated with a heavier line. I. Need to provide a landscape screen around existing transformer along 1-635 J. What is the "Vertical Element?" Also show on site plan. Site Plan: A. The proposed monument sign exceeds maximum required (60 sq. ft.).. needs to be redesigned an provide additional details. B. Show EXISTING monument sign on Lot 1. C. QUESTION FOR STAFF: Will additional monument sign be permitted on Lot 2? D. The deficits on the landscape plan need to be addressed which will require revisions to the site plan, including: 1. Parking islands, serving two rows of parking, are required to be a minimum of 300 square feet, with a minimum width of 9 feet. Most of the parking islands appear to be significantly smaller than that. 2. A 10' landscape buffer is required along the north property line, none is shown. 3. The Landscaped/Entry Feature area along the mutual lot lines is different on the site plan and the landscape plan., which is correct? E. Relocate the proposed dumpster from 1-635 frontage. F. Enhanced paving is required on private property on all driveways along Freeport Parkway. G. Correct the spelling of Proposed on Site Data Table Elevation: Color rendering would be helpful THE.CITY.OF THE.CITY.OF COPPELL !l * -'" . CITY OF COPPELL 2nd ORC REPORT COPPELL ...~~ * fi~... ~ ~~~ c! ...t <'\.5 . \ e. q Proiect 10 SPA-06-0068 Proiect Name Gateway Business Park No.3, Lots 1 and 2 Block Address Freeport Pkwy Proiect Type Site Plan Approval Application Date 11/21/2006 Case Manaaer Marcie Diamond Proiect Description To allow the construction of an 114,81 O-square-foot, two story office building on Lot 1, containing 9.49 acres of property and an 110,560-square-foot, two-story office building on Lot 2, containing 8.60 acres of land of Aqency Engineering Comments No Comments