Loading...
P&Z letter of approval on 4/20/2006 ~ I THE'CITY.OF COPPELL 4L~;~~.,~. * ~~w~+ 1" ~~,."K ~'."'.~ ~.~...~ \) E:;~~'q -r AS,' \ II April 21, 2006 Mr. Robert McCann ProLogis 2310 LBI Frwy., Suite 200 Dallas, Texas 75234 RE: CASE: Gatewav Business Park, Lot 38, Block 2, Site Plan Dear Mr. McCann: This letter is to inform you that Gateway Business Park, Lot 3B, Block 2, Site Plan, to allow the construction of an approximate 142, 120-square-foot office/warehouse building on 11.62 acres of property located at the northwest corner of Freeport Parkway and Gateway Blvd., was recommended for approval by the Coppell Planning and Zoning Commission on Thursday, April 20, 2006, subject to the following conditions: 1. Show Fire Department Connection (FDC) location on Site Plan and Water Plan. FDC must be within 50' of a fire hydrant and on the same side of the fire lane. 2. Correct the dimension of the northern property line of this property, and add the dimension of the northern line of the "limits of worlC' on the Site Plan and the Landscape Plan. 3. Need to show location of the Monument Sign on Landscape Plan. 4. Correct the size of the proposed Crape Myrtle trees from 3" caliper to either 8-10 feet in height or 45 gallon. 5. Replace the 17 Texas Mowltain Laurels with an overstory tree on the Plant Palette. 6. Add the following note to the Landscape Plan "Trees within the hike and bike trail easement are subject to being removed in the event that the 8-12 foot wide trail, parallel to Freeport Parkway, is constructed in the future" 7. Resolve all discrepancies in the tree counts in the Landscape Calculations (i.e. in the plant list, summary, and tabulations) 8. Add the grasscrete detail to site plan sheet with a note stating that "the grasscrete area shall be maintained in good repair at all times." 9. The protrusion of the entry features shall be increased from 3 to 5 feet and the vertical architectural elements shall be increased from 8 to a minimum of 12 inches. 1 O. Correct discrepancy between the exterior colors specified on the elevations and those on the color board (Jaguar or Liquorice Tint?). 11. Compliance with the attached departmental comments. 255 PARKVv'AY * P.O BOX 9478 * COPPELL TX 75019 * TEL 972/462 C'022 * FAX 972/304 3673 The date scheduled for consideration by the Coppell City Council is Tuesday, May 9, 2006, at 7 p.m. A representative for this case must be present at this meeting, which will be held in Council Chambers at City Hall. Failure to represent this item may result in the denial of this application. City Council has instructed staff to include in its agenda packets only those items that accurately reflect conditions as recommended by the Planning and Zoning Commission. Therefore, please submit to the Planning Department two (2) folded copies of all revised plans, reflecting the above- mentioned conditions, on or before 12 noon. Wednesday. April 26. 2006. Also, please submit one (I) 8 Y2 x II paper reduction, along with one jpg, tiff, pdf or similar electronic file. If you have any questions, please contact the Planning Department at (972) 304-3678. Sincerely, _ ~~~ Marcie Diamond, AICP Assistant Planning Director Cc David Meinhardt Building Inspection file t; I T Y . 0 " COPPELL .~- * ~~... r;-~" -t .... .s \ & CITY OF COPPELL 2nd ORC REPORT ~- THE C I T Y Proiect 10 SPA-06-0015 COPPELl .~'" -~. r " ~ q .t .... & \ ~ Address Freeport Pkwy Proiect Name Gateway Business Park Proiect Tvpe Site Plan Approval Application Date 3/22/2006 Case Manaaer Marcie Diamond Proiect Description to allow the construction of an approximate 142, 120-square-foot office/warehouse building on 11.62 acres of property 1 of AQency Engineering Comments 1. Your proposal to remove the low point inlet along Gateway Blvd. will be revisited in greater detail during Engineering review. Parks and Recreation Additional comments may be generated upon detailed engineering review. Trees within the hike and Bike Trail easement are limited to ornamental trees only, and are subject to being removed in the event that the 8-12 foot wide trail parallel to Freeport Parkway is constructed in the future. 1. Show Fire Department Connection (FDC) location on Site Plan and Water Plan. FOe must be within 50' of a fire hydrant and on the same side of the fire lane. Fire Administration