Proiect 10
Address
PD-07-0016
1230 Crestside Dr
Proiect Type
Application Date
Case Manaaer
Proiect Description
Proiect Name
PD-226-1i, Amcat (nI635bp, Lt 7, Blk C Essex Wire
Re-Zoning PD
2/14/2007
Gary Sieb
from LI (Light Industrial) to PD-226-L1 (Planned Development-226-Light Industrial) to allow the relocation of two
non-masonry structures (existing training lab and roof climbing area), with a landscaped screen, on 3.5 acres of property
Agency
Building Inspection
1 of
Review Date
Reviewed By
Greg Jones
2/21/2007
Electric and Gas
Engineering
Fire Administration
Jeff Curry
Ken Griffin
Tim Oates
2/22/2007
2/19/2007
2/22/2007
Parks and Recreation
Planning Department
John Elias
Gary Sieb
2/19/2007
2/20/2007
Comments
1. Lab will need new code-compliant Electrical,
Plumbing and Mechanical systems to be installed.
2. Per applicants request, lab not allowed to be used
as living or office space - occupancy for training only.
3. Will roof climbing area be where shown on
submission, or in front of lab as discussed?
No Comments Received
No comments.
1. Provide a 20 ft wide fire lane with approved
turnaround to within 150 ft of all portions of proposed
laboratory. This can be accomplished by 'separate
instrument'.
2. No obstructions permitted in the proposed 20 ft fire
lane easement (eliminate/remove metal chain).
No comments.
1. If adding parking, please provide parking spaces at
a minimum length of 19 feet.
2. Dimension maneuvering space between parking
bays
3. Landscape island of 150 square feet is required at
end of each added parking bay.
4. Indicate name of all landscape materials and make
sure plant pallette allows each type.
5. Show distance between roof climbing area and
laboratory structure; distance to prop. lines.
6. Building permits will be required for any code
mandated construction activity.
7. Need floor plan, height, construction material,
elevations, etc. of laboratory and roof climbing
structures.
8. Please address items outlined in Section 12-27-2-2
(A-E) PD Site Plan requirements, of the Zoning
Ordinance.