Loading...
Departmental comments THE.CITY.OF COPPELL THE.CITY.OP' CITY OF COPPELL ORe REPORT COPPELL ..~* ... ~ Q e ~ ... \ f:l q .. 8 . " 8 Proiect 10 Address PD-07-0016 1230 Crestside Dr Proiect Type Application Date Case Manaaer Proiect Description Proiect Name PD-226-1i, Amcat (nI635bp, Lt 7, Blk C Essex Wire Re-Zoning PD 2/14/2007 Gary Sieb from LI (Light Industrial) to PD-226-L1 (Planned Development-226-Light Industrial) to allow the relocation of two non-masonry structures (existing training lab and roof climbing area), with a landscaped screen, on 3.5 acres of property Agency Building Inspection 1 of Review Date Reviewed By Greg Jones 2/21/2007 Electric and Gas Engineering Fire Administration Jeff Curry Ken Griffin Tim Oates 2/22/2007 2/19/2007 2/22/2007 Parks and Recreation Planning Department John Elias Gary Sieb 2/19/2007 2/20/2007 Comments 1. Lab will need new code-compliant Electrical, Plumbing and Mechanical systems to be installed. 2. Per applicants request, lab not allowed to be used as living or office space - occupancy for training only. 3. Will roof climbing area be where shown on submission, or in front of lab as discussed? No Comments Received No comments. 1. Provide a 20 ft wide fire lane with approved turnaround to within 150 ft of all portions of proposed laboratory. This can be accomplished by 'separate instrument'. 2. No obstructions permitted in the proposed 20 ft fire lane easement (eliminate/remove metal chain). No comments. 1. If adding parking, please provide parking spaces at a minimum length of 19 feet. 2. Dimension maneuvering space between parking bays 3. Landscape island of 150 square feet is required at end of each added parking bay. 4. Indicate name of all landscape materials and make sure plant pallette allows each type. 5. Show distance between roof climbing area and laboratory structure; distance to prop. lines. 6. Building permits will be required for any code mandated construction activity. 7. Need floor plan, height, construction material, elevations, etc. of laboratory and roof climbing structures. 8. Please address items outlined in Section 12-27-2-2 (A-E) PD Site Plan requirements, of the Zoning Ordinance.